PROCESS PLANT DESIGN
6
PIPERACK DESIGN
7
8
PIPING PLANS
9
PLOT PLANS
10
11
12
FABRICATION ISO’S
(REF: PRACTICE 670.250.2086)
13
FABRICATION ISO’S
(REF: PRACTICE 670.250.2093)
14
FABRICATION ISO’S
PDS GENERATED
15
ISO ISSUE CURVE
Large Bore
300
ISO’S ARE
DRAWN &
250 ISSUED BY
A SET
200
SCHEDULE
150
100
0
16
PDS MODELING
17
18
DESIGN CONSIDERATION
FOR ROUTING OF PIPE
• Materials of Construction (Metallurgy
Review)
• Specification
– Flange Rating, Pipe Wall Thickness,
Gasket Types, Types of Valves.
• Stress Considerations
– Temperature, Adequate Supports,
(Attachments) What Forces Are Imposed
on Attached Equipment?
• Fabrication Considerations
• Shop Fabrication
Continue...
19
… Continuation
DESIGN CONSIDERATION
FOR ROUTING OF PIPE
• Field Fabrication
• Constructability
• Process Objectives
– Pressure Drop Problems Caused by
Elbows, Valves, Vertical Runs, Etc.
• Operation and Maintenance
• Instrumentation/electrical
• Schedule and Budget
• Safety Requirements (OSHA)
• Environmental
20
PIPING ARRANGEMENT
21
SECTION VIEW
RESPONSIBILITES OF THE
PIPING DESIGNER
THE PIPING DESIGNER
INITIATES WORK FOR:
1. STRUCTURAL
2. VESSELS
3. ELECTRICAL
4. STRESS
5. PIPE MATERIAL
FINAL ERECTION
•DETAIL DRAWING
(PLACEMENT)
•ISOMETRIC DRAWING
(CONFIGURATION &
ERECTION NOTES)
START •FABRICATED PIPE ISOS. 22
23
PIPING ENGINEERING/DESIGN WORKSHARE ORGANIZATION
HOUSTON MANILA
PIPING DIRECTOR
DON GRISER
LEAD LEAD
MATERIA MATERIAL LEAD DESIGN LEADS PIPING
L CONTROL ENGINEER STRESS LEAD
Engineer
Area Lead Area Lead AREA LEAD AREA LEAD AREA LEAD Area Lead Area Area Area Lead
WBS WBS WBS Area Lead WBS Lead Lead WBS
WBS WBS
WBS WBS WBS
24
Designers are assigned to work with an Area Lead
25
PREREQUISITES
26
FRONT END ACTIVITIES
27
PLOT PLAN DEVELOPMENT
28
ESTIMATING & PURCHASING ACTIVITIES
29
ENGINEERING ACTIVITIES
30
LAYOUT & DEVELOPMENT
31
DETAILED ENGINEERING
32
33
PIPING ORG CHART
Project Support Thermal and Piping Material Material Training Plant Design
Seismic Load Specs Takeoff
Analysis
Wall Thk and
Project Lead Piping Code Compliance Components Bid Estimating Plans /
Engineers Design Documents Resources Isometrics
Calculations and
Insulation Procurement
Proposal and Estimate Piping Loads on Coatings, and Requisitions Design
Coordination Structures and Refractories Status Training
Liaison Between Equipment Welding and Monitoring
Department and Training NDE and Control Staffing
Project Management Estimating
Code Compliance
Engineering Metallurgy and Process
Design and Corrosion Training Graphics
Procurement of Line List Liaison - P&ID
Engineered Engineered Items Home Office / Drafting
Supports Snubbers (Specialty Items) Field Computer
Spring Hangers Training Staffing Applications
Staffing Coordinators
Estimating 34
Staffing