(Peak Hour)
Source : www.ecvv.com
CNG – Design
for Power Generator
(peak hour)
Natural gas :
Total Flow Rate (Volume or Energy)
Pipeline
Gas Well
Gascondition : Pressure,
Temperature and Composition.
DEMAND
Naturalgas must be able to supply to the
power generator during peak hours
The power plant condition must be
considered:
Peak hours (example: 5 or 6 hours every
day)
Type and configuration of the power plant
The total efficiency of Power Generator to
calculate the natural gas needed during peak
hours
Design key parameter: Supply or Demand ?
Daily Heat Balance
Demand as a key parameter
CNG
Compressor Gas Dryer
Storage
Pressure
Reducing Metering Pembangkit
Unit
Flow Process Diagram
Operation Time of CNG Plant
(example : 5 hours)
Gas
Gas
Standby Decompressi
Compression
on
Duration Process
Stop power plant and gas compression to
22.00 – 15.00
CNG Storage
15.00 – 17.00 Standby
Gas decompression from CNG Storage to
17.00 – 22.00
Power Plant and start power plant
The relation between storage
pressure and operation hours
300
250
Storage Pressure (bar)
200
150
100
50
Time
Gas Scrubber
Source : www.wikipedia.com
Mass Balance in Gas
Scrubber
Gas Dryer
Source : www.fleetsandfuels.com
Source : www.metrixvibration.com
Multiple-stage compressor
COMPRESSORS & DRIVERS
Selection Specification:
Design flow : 2500 SCFM
Alternative 1 Suction press : 17 – 35 barg
Discharge press : 250 barg
Rated Power : 506 HP / 376
KW
RPM (Max.) : 1500
Driver Type : Electric motor
Configuration:
Nos of operating :4
Nos of stand by :1
Total nos of installed : 5
Total required power : 2024 HP
COMPRESSORS & DRIVERS
Selection Specification:
Design flow : 1780.5 SCFM
Alternative 2 Suction press : 15 – 30 barg
Discharge press : 250 barg
Rated Power : 600 HP / 448
KW
RPM (Max.) : 1800
Driver Type : Gas Engine
Configuration:
Nos of operating :6
Nos of stand by :2
Total nos of installed : 8
Total required power : 3600HP
CNG Skid
Specification of CNG Skid
2 Stack Arrangm’t
3 Stack Arrangm’t
• Contingency
4
• Working Capital
5
Bare Module Cost Breakdown
2%
6%
13%
Gas Preparation Unit
$ $
PT. Z
PT. X SBU/Company
(Power Plant)
gas gas
Scheme 2 :
$
$
PT. Z
PT. X SBU/Company
(Power Plant)
gas gas
CNG Skid
Soal PR:
Sebuah pembangkit membutuhkan 12 BBtu gas bumi
untuk menjalankan pembangkit tersebut selama 6 jam
tiap hari. Tekanan gas masuk pembangkit tidak boleh
kurang dari 28 bar. Untuk memenuhi kebutuhan gas
pada saat beban puncak tersebut, diperlukan fasilitas
gas storage (CNG Storage/CNG Skid). Diputuskan
menggunakan skid yang terdiri dai 8 tube, dengan
kapasitas simpan sebesar 5330 m3. (Asumsi: Nilai
kalor gas 1000 MMBtu/MMSCF). Disain CNG storage
harus mempertimbangkan/mengantisipasi kenaikan
kebutuhan gas sebesar 15%, maka hitunglah, berapa
perkiraan luas area yang dibutuhkan, Jika dimensi
CNG Skid (lebar x panjang) adalah 2.5 m x 12m,
dengan konfigurasi 3 skid per tumpukan.