Sunteți pe pagina 1din 12

BUILDING &

FURNITURE
TECHNOLOGY
Candidate Name:
Candidate #:
ORGANIZATION OF A CONSTRUCTION INDUSTRY

Contracts Manager

Assistant Contract Costing


Nominated Sub- Manager Accounts
Consulting Contractor Operatives
Office Staff
Engineers Domestic Sub-
Contractor
Surveyor
Quantity Surveyor
Building Owner Operatives
(Client) Principal Estimator
Architect Contractor

Buyer

Administrators
Clerks of The Work
ORGANIZATION OF A MANUFACTURING INDUSTRY
MD/Admin Assistant

Office Attendant Bearer

Technical
Representative
Marketing Manager
Managing Director Stores/Sales Sales Clerk/Relief Warehouse/Delivery
Supervisor Operator Clerk

Production Foreman
Production Production Staff,
Supervisor Contacted & Casual
Production Staff
Board Chairman Property Custodians
Plant Manager Quality Assurance
Q/A Technician
Supervisor

Maintenance Maintenance
Supervisor Technician

Group Financial Senior Accounting Junior Accounting


Accountant
Controller Clerk Clerk
SAFETY RULES
▪ Student affected by drugs or alcohol are not permitted in the workshop
▪ Students with any health problems that may affect workplace safety (e.g. medication, epileptic fits)
must report these conditions to the workshop staff
▪ Make sure your work piece is fixed securely before work commences
▪ Keep leads up off the floor
▪ Keep clear of any person operating tools and machinery (bumping an operator or get tangled in the
lead could cause serious injury to you or the operator)
▪ No food or drink in the workshop
▪ Wear the correct protective equipment for the tools you are using – ask if in doubt
▪ Immediately notify the workshop supervisor of any faulty or broken equipment
▪ Ask how to use the tools safely
▪ Do not talk to anyone operating electrical equipment and mach
REPORT
Date: September 14, 2017
OF AN ACCIDENT
Person/s Involved: [Marco Wynter] [Cavin King]
Nature of Accident: Fractured Bones
Approximate Time: 12:45

What Happen:
Marco went to the mechanical workshop where he was using the table saw to cut pieces of ply board
while talking with Cavin his hand got caught in the table saw and was severed from his body.

First - Aid:
Limb was place in a cooler to keep the limb cold and Marco’s arm was wrapped with moist clean
material to reduced blood loss.

Recommendations: Use Machinery with a partner and be more vigilant while operating machinery.
FULL THROTTLE
COMMERCIAL
CONTRACTORS
Small Business Plan
OVERVIEW

Full Throttle Commercial Contractors LLC is a mid tier construction company


formed by Darren Downer and is currently being established. The company has
successfully operated in the St. Ann area for the past 3 years working on both
small and large-scale construction, repair, and alteration projects focusing on
residential contracting. With the tourism boom that is occurring in our local area
and the desire to improve overall profit margins, the company is planning to shift
its target market from residential clients to the larger commercial customers.
This business plan will lay out our goals and tasks to make this transition
successful and create enough market share to succeed in this highly competitive
market.
OBJECTIVES

1. Significantly expand into the commercial building contracting market to improve profit
margins .FTCC
2. increase local market share
3. Expand services and decrease costs by creating a permanent architect crew, as well as
adding an accountant to our staff.
4. Begin to market and offer services in the Surrey County area in preparation for opening an
offices there in early 2020.
5. Full Throttle CC aims to go international in a 6 year period
OUR AIM AUDIENCE
Full Throttle CC has a well-deserved reputation for quality We aim our services to large companies and
customer service. However, faced with changes in government facilities which would need
distribution systems, economic impacts to transportation major construction work of all trades such
and logistics, and limitations that prevent taking full as electrical installments, plumbing fixtures
advantage of improvements in technology, Full Throttle CC and more that Full Throttle CC has in store.
faces the possibility of decreasing sales revenues due
customer perceptions of slow delivery and services.
Our main mindset is to develop solution to help our
businesses stay ahead of customer satisfaction trends and
propose to implement logistics for order management.
DESIGN PROCESS
▪ Define a Problem
▪ Brainstorm
▪ Research and Generate Ideas
▪ Identify Criteria and Specify Constraints
▪ Explore Possibilities
▪ Select an Approach
▪ Develop a Design Proposal
▪ Make a Model or Prototype
▪ Test and Evaluate the Design using Specifications
▪ Communicate Processes and Results
EXAMPLE
Automobile Airbag Inflation - A company that manufactures automobile
airbags has a problem with an unacceptably high rate of failure in the
inflation of the bag. During testing, 10 percent of the bags do not fully
inflate. An engineer is assigned the job of solving the problem. At first the
engineer defines the problem as a failure in the materials and
construction of the inflation device. The engineer begins to solve this
problem by producing a more robust inflation device. After considerable
effort, the engineer discovers that improving the inflation device does not
change the failure rate in the bags. Eventually, this engineer re-examines
the initial definition of the problem. The company investigates the airbag
inflation problem further and discovers that a high degree of variability in
the tightness of folds is responsible for the failure of some bags to inflate.
At the time the bags were folded and packed by people on an assembly
line. With a more complete understanding of the need, the engineer
redefined the problem as one of increasing the consistency in tightness of
the folds in the bags. The final solution to this problem is a machine that
automatically folds the bags.

S-ar putea să vă placă și