PLANT LAYOUT

GARMENT MANUFACTURING PLANT FOR CASUAL SHIRTS

PRESENTED BY:

AKANKSHA (03)
PRATIBHA (16)
ANISHA(05)
PARVATHY(17)
LIST OF CONTENTS

1. Project Brief

2. Product Description

3. Process and Production System

4. Department wise Area Requirement

5. Plant Layout and Material Flow

6. Floor wise Departmental Details

2
1. INDUSTRY BRIEF

• Product Range : Casual Shirts of all categories


• Given area of the proposed setup : 30,000 sq. ft
• Utilized area for proposed setup: 21,670 sq. ft (8,330 sq. ft saved for future expansion)
• In-house Manufacturing
• Rate of Production : 4000 pcs/day
• Capacity : 9 Sewing lines with 350 machines in total
• Manpower : 500

3
1.1 PLANT LOCATION
• The plant location would be in Hyderabad.

Location of our plant:

• Our plant would be located in the industrial area of Patancheru, Hyderabad, Telangana.

4
• Reasons for choosing this particular location are as follows:

• Being an industrial area, it has good roads and transportation facility.


• Uninterrupted power and water supply
• Availability of cheap labour
• Vishakhapatnam, which is the nearest port can be used for shipment.
• Rules of state government are pro-industries.

• While doing the calculations, we had taken care of the standards followed in the industry and at the same time
we had done some assumptions on the basis of what we had seen in the apparel internship industry.

5
2. PRODUCT OVERVIEW
Name of the Product Shirt

Category(Men’s/Women’s/Children) Men’s Formal Shirt


Type of Product (Casual/Formal) Casual

Fabric (woven),trims like button, fusible interlining, zipper and


Major raw materials
sewing threads

6
2.1 FEATURES OF THE PRODUCT

• The products have desirable fashion features such as darts, panels, embroidery, etc
for providing an attractive look to the wearer.
• The construction of the product can vary from easy to complex depending on the
style variation.
• Small parts like collar and cuffs are separately prepared before being assemble into
the main garment.
• Operational Breakdown for all possible Operations.pdf

7
3. PROCESSES AND PRODUCTION SYSTEM
Overall workflow of the manufacturing process

Receive raw material and


Proto type sample development Production Planning and inspection Packaging
Dispatch
raw material

Sample approval PP sample approval Stores Quality checking and audit

Cutting
Pressing and Finishing
Order Conformation PP sample development Printing
Embroidery

Size set samples Size sample approval Sewing Washing

8
3.1 PRODUCTION SYSTEM: PROGRESSIVE BUNDLING SYSTEM

 The production system proposed for the facility is “Progressive Bundling System” with the
material flow being in a straight line motion.
 On the sewing floor bundles of garment parts are moved sequentially from operation to
operation.
 The bundle sizes vary according to cutting orders, fabric shading, size of the pieces in the
bundle, and the operation that is to be completed.
 Bundles of garments are assembled in the cutting room where cut parts are matched up with
corresponding parts and bundle tickets.

9
3.2 PLANT ESTIMATES

• Product: Men’s Shirts


• Efficiency of the plant = 65%
• Target per day = 4,000 pieces
• Total production per year = 26 X 4,000 X 12 = 12,48,000 pieces (Assuming 26 working days
in a month)
• No of shifts per day = 1
• Working hours per shift = 8 hours

10
4. DEPARTMENT WISE AREA DETAILS
SPACE REQUIREMENT FLOOR-WISE
FLOOR DEPARTMENTS AREA COVERED (IN Sq. Feet)

Basement SAMPLING 75
HOUSEKEEPING 50
MERCHANDISING & 210
FINANCE DEPT
MAINTENANCE STORE 200
PARKING 8,000
Ground Floor PACKAGING & WAREHOUSE 420
FINISHING 800
TRIMS STORE 90
PANTRY AREA AND WATER COOLER 100

HR OFFICE 80
IT OFFICE 60
CONFERENCE ROOM 200

11
SPACE REQUIREMENT FLOOR-WISE

FLOOR DEPARTMENTS AREA COVERED


CEO OFFICE 60
Ground Floor
WAITING ROOM 150
MEDICAL ROOM 150
RECEPTION 100
FABRIC STORE 1440
FABRIC INSPECTION ROOM 50
CAD ROOM 50
CUTTING ROOM 3400
SECURITY 40
GREEN PATCH 2000
2 WHEELER PARKING 8000

12
SPACE REQUIREMENT FLOOR-WISE

FLOOR DEPARTMENTS AREA COVERED

First Floor SEWING SECTION 9650


PRODUCTION PLANNING & CONTROL OFFICE 50

PRODUCTION OFFICE 60
MAINTENANCE OFFICE 200

QUALITY AND IE OFFICE 150

WAREHOUSE 1440

KITCHEN 300
Second Floor
TERRACE GARDEN 5000

CANTEEN 15000

TRAINING AREA 400

13
MACHINES USED AND THEIR COSTS

Sl. No. Machine type Company Model no. Unit Price (Rs.)

1 SNLS BROTHER DDL-9000 18,000

2 DNLS BROTHER LH-3100 30,000

3 COLLAR TURN NISSIN NT-720 35,000

4 CUFF TURN NISSIN NT-750 35,000

5 BARTACK BROTHER LK-1900A 54,000

6 BUTTON HOLE JUKI LBH-1790 30,000

7 BUTTON ATTACH JUKI MB-377NS 17,000

8 FOA JUKI MS-1190 18,000

9. OVERLOCK BROTHER 1034D 24,000

14
5. PLANT LAYOUT

15
Fig: Basement
16
Fig: Ground Floor
17
Fig: First Floor
18
Fig: Second Floor
6. FLOOR WISE DEPARTMENT DETAILS
6.1 BASEMENT
• Department in Basement are :
• SAMPLING
• MERCHANDISING
• FINANCE DEPARTMENT

19
6.1.1 SAMPLING DEPARTMENT
• In the Sampling department the buyer’s requirement is actually transformed into a garment based on the
styles & designs given by the buyer.
REQUIREMENTS QUANTITY COSTING
Manpower 10
Machines Required:
 SNLS 7 =7*18,000=1,26,000 Rs.
 FOA 1 =1*18,000=18,000 Rs.
 DNCS 1 =1*30,000=30,000 Rs.
 Button stitching 1 =1*30,000=30,000 Rs.
 Button holing 1 =1*17,000=17,000 Rs.
 Steam iron 2 =2*6,000=12,000 Rs.

Pattern making table 1 (5’x5’) =1*10,000=10,000 Rs.


Table 1(dimensions = 9’x6’) =1*2,000=2,000 Rs.
Chair 2 (dimensions = 2’x2’) =2*2,000=4,000 Rs.
Stitching Stools 12 =12*1500=18,000 Rs.
Lightning 1000 lux =6*600=3,600 Rs.
AC 2 =2*30,000=60,000 Rs.
TOTAL = 3,30,600 Rs. 20
6.1.2 MERCHANDISING DEPARTMENT
• The merchandising department work towards the fabric procurement, buyer negotiations, vendor
compliances and follow up with the style and the orders till they have been confirmed by the buyer.

REQUIREMENT QUANTITY COSTING


S
Manpower 8

Computer 2(dimensions of computer table= 3’x2’) =2*24000=48,000 Rs.


Printer 1 (on the table) =2,000 Rs.
Chair 10(8+2)(dimensions=2’x2’) =2,000*10=20,000 Rs.
Table 1 center table (dimensions = 6’x3)’ =1*4000=4,000 Rs.

Racks 2 (dimensions = 6’X2’X8’) =4,800 Rs.


Carpet area 110 sq. feet
Lighting 500 lux =3*600=1,800 Rs.
AC 1 =30,000*1=30,000 Rs.
TOTAL = 1,10,600 Rs.
21
6.1.3 FINANCE DEPARTMENT
• The finance department takes responsibility for organising the financial and accounting affairs, and the
provision of financial information for managers.

REQUIREMENT QUANTITY COSTING


Manpower 2
Computer 2(dimensions of computer table= 3’x2’) =2*24,000=48,000 Rs.
Printer 1 (on the table) = 1*2,000=2,000 Rs.
Cupboard 1 ( dimensions = 3’x2’x6’) =1*2,500=2,500 Rs.
Table 1 ( dimensions = 4’x2’) =1*2,000=2,000 Rs.
Chair 4 ( dimensions = 2’x2’) = 4*2,000 =8,000 Rs.
Racks 1 ( dimensions = 6’x2’x8’) =1*2,400=2,400 Rs.
Carpet area 80 sq. feet (approx.)
Lightning 500 lux =3*600=1,800 Rs.
AC 1 =1*30,000=30,000 Rs.
TOTAL = 96,700 Rs.

22
6. FLOOR WISE DEPARTMENT DETAILS

6.2 Ground Floor


• Department in Ground Floor are :
• PACKAGING & WAREHOUSE
• FINISHING
• TRIMS STORE
• HR OFFICE
• IT OFFICE
• FABRIC INSPECTION ROOM
• CAD ROOM
• CUTTING ROOM
• FABRIC STORES DEPARTMENT

23
6.2.1 PACKING AND WAREHOUSE DEPARTMENT
• The finished goods are packed into poly bags and put in cartons. The warehouse dispatches the packed
goods to the buyer.

REQUIREMENTS QUANTITY COSTING

Manpower 3

Computer 1(dimensions of computer table= 3’x2’) =1*24,000=24,000 Rs.

Chair 2 (dimensions = 2’x2’) =2*2,000=4,000 Rs.

Lightning 300 lux =2*600=1,200 Rs.

Area 420 sq. feet

FAN 1 =2,000*1=2000 Rs.

TOTAL = 27,600 Rs.

24
6.2.2 FINISHING DEPARTMENT
• Finishing is the last stage of garment production before shipment where garment gets its desired look.
Each garment undergoes various finishing processes.

REQUIREMENTS QUANTITY COSTING


9 =9*6,000=Rs. 48,000
PRESSING MACHINES
INSPECTION & TRIMMING TABLE: 3 =3*4,000=Rs. 12,000

FOLDING TABLE: 3 =3*5,000=RS15000

METAL DETECTOR 1 =1*1,80,000=1,80,000


PACKAGING TABLES 3 =3*2,400=Rs. 7200
WASHING MACHINE 2 =2*1,20,000=Rs. 2,40,000
HYDRO EXTRACTOR 2 =2*30,000=Rs. 60,000
TUMBLE DRYER 1 =1*60,000=Rs. 60,000
TUBLIGHT 10 =10*600=Rs. 6,000
FAN 7 =7*2000=Rs. 14,000
TOTAL =Rs. 6,42,200

25
6.2.3 TRIMS DEPARTMENT
• The accessories department controls the accessories sourcing from various suppliers and supply of
accessories to the various departments at specified time as per requirement.

REQUIREMENTS QUANTITY COSTING


Manpower 2
Computer 1(dimensions of computer table= 3’x2’) =1*24000=24000 RS

Table 1(dimensions = 4’x2’) =2000 RS


Chair 4(dimensions = 2’x2’) =4*2000=8000 RS
Racks 3(dimensions-6’x2’x8’) =3*2400=7200 RS
Carpet area 90 sq. ft (approx.)
Lightning 150 lux =1*600=600 RS
FAN 1 =2000*1=2000 RS
TOTAL 43800

26
6.2.4 HR DEPARTMENT

• HR department is responsible for bringing people into the organization, helping them perform their
work, compensating them for their labours, and solving problems that arise.

REQUIREMENTS QUANTITY COSTING


Manpower 4
Computer 4(dimensions of computer table= 3’x2’) =4*24,000=96,000 Rs.
Table 1 (dimensions = 6’ x 3’) =1*2,000 =2,000 Rs.
Chair 12(dimensions = 2’x2’) =12*2,000=24,000 Rs.

Printer 1(on the table) =1*2,000=2,000 Rs.


Racks 1(dimensions= 6’x2’x8’) =1*2,400=2,400 Rs.
Carpet area 80 sq. feet (approx.)
Lightning 500 lux =3*600=1,800 Rs.
AC 2 =2*30,000= 60,000 Rs.
TOTAL = 1,88,200 Rs.

27
6.2.5 IT DEPARTMENT
• IT as a central server connected to all the computers in the factory. It Department helps on sharing of
records and provides access to outside internet to the systems.

REQUREMENTS QUANTITY COSTING

Manpower 2

Computers 2 (dimensions of computer table= 3’x2’) =2*24000=48000 RS

Chairs 4 (dimensions = 2’x2’) =4*2000=8000 RS

Carpet area 60 sq.feet

Lightning 500 lux =3*600=1800 RS

AC 1 =1*25000=25000RS

TOTAL = 82,800 Rs.

28
6.2.6 FABRIC INSPECTION DEPARTMENT
• Fabric inspection consists of checking the actual GSM, shrinkage, shade and colour continuity card using
various testing tools.

REQUREMENTS QUANTITY COSTING

Manpower 2
Computer 1(dimensions of computer table= 3’x2’) = 1*24000=24000 RS

Table 1(dimensions = 4’x2’) =1*2000=2000 RS


Chair 2 (dimensions = 2’x2’) =2*2000=4000 RS
Washing machine 1 (dimensions = 3’x3’) =1*20,000= 20,000 RS

Carpet area 50 sq. feet (approx.)


FAN 1 =2000*1=2000 RS
LIGHTNING 150 lux =1*600=600RS
TOTAL = 52600 Rs.

29
6.2.7 CAD DEPARTMENT
• CAD department is for marker making by aid of computers. This department is crucial as in achieving the
target of the company by reducing cost by efficient markers.

REQUREMENTS QUANTITY COSTING

Manpower 2
Computer 1(Dimension Of Computer Table= 3’x2’) =1*24000=24000 RS
Gerber Plotter 1 =1*72000=72000 RS
Gerber Digitizer (16 1 =1*39000=39000RS
Button Cursor)
Table 1(Dimensions = 4’x2’) =1*2000=2000 RS
Chair 2 (Dimensions = 2’x2’) =2*2000=4000RS
Carpet Area 50 Sq. Feet (Approx.)
Lightning 150 Lux =1*600=600 RS
Ac 1 =25000*1=25000 RS
TOTAL = 1,66,600 Rs.

30
6.2.8 SPREADING AND CUTTING DEPARTMENT
• Cutting is a unit basically refers to spreading of fabric, cutting of parts, fusing of parts and bundling. These activities
are manually done in the company.
• Spreading:
• No. of tables: 4
• Dimensions of each table: (50’X6’) x 4= 1200 sq. feet
• Cutting:
• No. of straight knife: 4
• No. of band knife:1: (dimension = 10’x6’) = 60sq. feet
• Dimensions of cutting table: (50’X6’)x 4=1200 sq. feet
• Ticketing & Bundling:
• Ticketing table dimensions: (30’x5’) = 150 sq. feet
• Fusing machine:
• Manpower: 3
• Dimensions: (12’x6’)= 70 sq. feet

31
6.2.8 SPREADING AND CUTTING DEPARTMENT
REQUIREMENTS QUANTITY COSTING

SPREADING TABLES 4 =4*6000=RS18000

STRAIGHT KNIFE: 4 =4*10500=RS42000


NO. OF BAND KNIFE 1 =1*90,000=RS90,000
CUTTING(GARMENT PATTERN CUTTING TABLE/CAD 4 =4*30,0000=RS120,000
LASER CUTTER
TICKETING TABLE 1 =1*10,000=RS10,000

INSPECTION TABLE 1 =1*10,000=RS10,000


RELAYING & RECUTTING TABLE 1 =1*10,000=RS10,000

FUSING MACHINE: 1 =1*120,000=RS1,20,000

TUBELIGHTS 60 = 60*600=RS36,000

FANS 34 = 34*2000=RS68000

Total =Rs. 5,24,000

32
6.2.9 STORES DEPARTMENT
• Average Fabric Consumption: 1.2 m
• Per day requirement: 4000 x 1.2 = 4800m
• Per week requirement: 4800 x 7 = 33,600 m
Now, assuming that 1 roll has 100m fabric. Then,
• Total rolls to be stored for 7 days = 336 rolls.
• Given, this rack structure will accommodate 20 rolls at a time.
• Therefore, number of such racks required: 336 / 20 = 16.8 ~ 17 racks.

REQUIREMENTS QUANTITY COSTING

TABLE 2 =2*6000=RS12000

STORAGE PALLETS 30 =30*1000=RS30000

FANS 3 =3*2000=RS6000
TUBELIGHT 5 =5*600=RS3000
TOTAL =Rs. 51,000

33
6. FLOOR WISE DEPARTMENT DETAILS

6.3 First Floor


• Department in First floor are :
• SEWING SECTION
• PPC OFFICE
• QUALITY DEPARTMENT
• IE DEPARTMENT
• WAREHOUSE

34
6.3.1 SEWING DEPARTMENT
• After the fabric will be released from cutting section, it will be passed on to the sewing department for
sewing. The various parts of the garment will be stitched together to form the garment.

• Daily production: 4000 pieces


Efficiency: 60%
SAM: 22.71 min. (full sleeve casual shirt)
Daily working hours: 8
Total SAM needed per day = 4000 x 22.71 min.
= 90,840min.
EFFICIENCY DESIRED= 65%

LABOUR REQUIRED= MINUTES REQUIRED/ MINUTES AVAILABLE= (4000*23)/(480*0.65)= 92000/312= 295


(approx)
NO OF ROWS= Total machines/Machines in a line= 295 / 36 = 8.19
No. of lines required = 9 lines

35
6.3.1 SEWING DEPARTMENT
Each line has:
Machine Name No. of machines COSTING
Single Needle Lockstitch Machine 28 =28*18000=RS50,40000
Double Needle Lockstitch Machine 1 =1*30000 =RS30,000

Iron/ Press 1 =1*6000=RS6000


Feed of the Arm 1 =1*18000=RS18000

Collar turn and cuff turn 2 =2*35000=RS70,000

Auto jig 1 =1*20,000=20,000


Buttonhole machine/electric snap and 1 =1*30,000=RS30000
grommet setter
Button sew machine 1 =1*19000=RS19000
5 thread Overlock machine 2 =2*24000=RS48,000

Total =RS5443000
NO.OF LINES 9 =9*5443000
=Rs. 4,89,87,000

36
6.3.1 SEWING DEPARTMENT
MANPOWER REQUIREMENT-(FOR 9 LINES)
Designation Quantity

Production manager 1

Line managers 9

Supervisors 9

Feeding helpers 9

Operators 295

Helpers 18

Quality checker operator 18

Quality manager 1

Quality manager assistant 1

Total 361

37
6.3.2 PPC OFFICE
• Where production is spread over a number of locations, a central department PPC is made to collect and
analyse the control information from each unit to report on individual and overall status.

REQUIREMENTS QUANTITY COSTING


Manpower 1
Computer 1(dimensions of computer table= 3’x2’) =1*24000=24000 Rs

Table 1(4’x2’)+1 (10’X5’) =2*2000=4000 Rs


Chair 10 (8+2) (dimensions = 2’x2’) =10*2000= 20,000 Rs

Printer 1(on the table) =1*2000= 2000 Rs


Racks 1(dimensions= 6’x2’x8’) =1*2400=2400 Rs

Carpet area 50 sq. feet (approx.)


Lightning 500 lux =3*600=1800 Rs
AC 1 =1*25000=25000 Rs

TOTAL = Rs. 79,200

38
6.3.3 QUALITY DEPARTMENT
• Quality department assures quality production by appointing checkers, Quality control and Assurance
personnel within sewing lines to monitor the production.

REQUIREMENTS QUANTITY COSTING

Manpower 1+4 (floor inspectors)

Computer 1(dimensions of computer table= 3’x2’) =1*24000=24000 RS

Racks 1 (dimensions = 6’x2’x8’) =1*2400=2400 RS

Table 1(dimensions = 5’x3’) =1*2000=2000 RS

Chair 5 (dimensions = 2’x2’) =5*2000=10000 RS

Carpet area 70 sq. feet (approx.)

Lightning 500.Lux =3*600=1800 RS

AC 2 =2*30,000=60,000 RS

TOTAL 1,00,200

39
6.3.4 IE DEPARTMENT
• The Industrial engineering department is primarily responsible to make sure that production goes on
smoothly. The monitoring of the line from the line setting period, throughout the production process is
being done.

REQUIREMENTS QUANTITY COSTING

Manpower 2
Computer 2(dimensions of computer table= 3’x2’) =2*24000=48000 RS

Table 1(dimensions = 4’x2’) =1*2000=2000 RS


Chair 4(dimensions = 2’x2’) =4*2000=8000 RS
Printer 1(on the table) =1*2000=2000 RS
Racks 1(dimensions= 6’x2’x8’) =1*2400=2400 RS
Carpet area 75 sq. feet (approx.)
Lightning 500 lux =3*600=1800 RS
AC 1 =1*30,000=30,000 RS
TOTAL = Rs. 94,200

40
6.3.5 WAREHOUSE
• The movement of fabric In and fabric Out are ensured by the Warehouse. The finished goods
are stored in the warehouse and dispatched according to the date of delivery.

REQUIREMENTS QUANTITY COSTING

TABLE 2 =2*6,000=RS12,000

STORAGE PALLETS 30 =30*1,000=RS30,000

FANS 3 =3*2,000=RS6,000

TUBELIGHT 5 =5*600=RS3,000

TOTAL =Rs. 51,000

41
6. FLOOR WISE DEPARTMENT DETAILS

6.3 Second Floor


• Department in Basement are :
• KITCHEN
• TERRACE GARDEN
• CANTEEN

42
AMENITIES REQUIREMENT
Different amenities requirements are as follows:
• 2 water cooler per floor
• 4 toilets per floor
• 2 for operators (men and women)
• 2 for supervisors and officers (Men and women)
• Parking space at the basement
• Total Setbacks of entire building is proposed to be 5000 sft.This set back is for transport
parking and loading/unloading of the trucks.

43
BUILDING TYPOLOGY
COLUMN
Framed structure

Foundation:

• The foundation will be built by digging 8-9 ft. down in hard soil.
Firstly a base of plain concrete cement is there for 6 inches and
then a reinforced concrete cement block of 1 ft.

• The column foundation starts after that and the plinth and normal
ground level are the same. PLINTH
LEVEL

RCC

PCC

44
Roofing:
• All the three floors should be of flat RCC roofing at height of 15 feet.

Advantages of using RCC roofing:


• Easy to construct, Fire resistant, Provides permanent durable roofing, capable of multistoried
construction, Very versatile and can be cast in any form, Requires very low maintenance

Advantages of using flat roofing:


• It provides better light, ventilation and architectural appearance.

Flooring:
• Stone flooring ( Very Durable, Stain Resistant, Cool Underfoot)

45
Ventilation
• Windows are kept in around 20% of the total area.
• Exhaust fans are adjusted in the sewing floor.
• The office area would have proper A/C facility
Lightning
• Every floor has proper lightning facility using tube lights along with special light frames
having 2 tube lights each above the work area where required.
• Sewing machines, inspection tables, finishing tables, press tables etc have special
arrangement for extra lightning fixed above the machines/tables.
• For inspection light required is maximum.

46
TOTAL COSTING
OF ALL
DEPARTMENTS
S .NO NAME OF DEPARTMENT / FACILITY AREA REQUIRED (IN SQ. FEET) COST (IN RS.)

96,700
1 Merchandising 110
1,10,600
2 Finance 80
1,88,200
3 HR 80
94,200
4 IE 75
79,200
5 PPC 50
42,400
6 Fabric warehouse 1440
52,600
7 Testing Lab 50
43,800
8 Trims Store 90
1,66,600
9 CAD 50
3,30,600
10 Sampling 75
92,200
11 Quality Dept 70
27,600
12 Packing 420
86,200
13 Crèche 100
1,14,800
14 Medical room 150
14,000
15 Security 40
1,05,000
16 Canteen 1600
48
35,000
17 General Manager office 60
S .NO NAME OF DEPARTMENT / FACILITY AREA REQUIRED (IN SQ. FEET) COST (IN RS.)

1,68,000
18 Conference room 200
67,200
19 Reception 150
82,800
20 IT 60
58,800
21 Manager’s cabin 55
650
22 Generator room 55
650
23 Boiler room 50
24 Production manager 50 72,800

25 Cutting section 3400 5,24,000

26 Store room 1460 28,000

27 Sewing dept 9650 4,89,87,000


28 Embroidery 200 7,37,200
29 Finishing 800 6,42,200
30 Warehouse 520 51,000
31 Housekeeping 50 2,000
32 Maintenance 200 15,00,000
33 Toilet total area (operator + executives) 30 1,60,000 49
6. CONCLUSION
• Our plant layout of garment factory consisting of 2 floors and a basement, having a capacity of 4000 garments has
been made with an efficient use of space keeping a consideration of the Telangana government rules and
regulations regarding industries.

• The only setback achieved while making the layout was the space constraint given to us. As a bigger plot of land
could have made the material flow of the production processes easier saving the industry a lot of time, hence,
money.

• However, for future expansion, sufficient provisions have been left so that there isn’t any problem if such a
situation arises.

• The making of this hypothetical garment industry’s plant layout utilized all our knowledge regarding the garment
industry and also our knowledge gained from our exposure to different garment industries during internships

50
THANK YOU