Sunteți pe pagina 1din 5

History of Continuous Improvement at Visteon

Ford Plan
Production VOS
EI Programs Lean Run
Employee Involvement System Thinking
Change

Deming VBOS
VMOS
PDOS
MMOS
Statistical QOS Work Teams Six Sigma
VPS FOS
Process White Boards Small Group
Control Activities etc.

Tools Thinking

Six Sigma

© Visteon Corporation GB-Mod #1 Rev 3.6 10/03 1


Metodología Lean Six Sigma

Problemas resueltos con Lean


Problemas resueltos con Six Sigma
o Perdidas o desperdicios elevados
o Minimizar variación en los procesos
o Mejora de flujos de actividades
o Reducir las fallos y errores hasta 3.4 ppm
o Agilizar los procesos
o Six
Solución
Sigma científica de problemas
o Evitar errores humanos
o Enfoque a problemas y mejoras de calidad
o Enfoque a mejora de la productividad
© Visteon Corporation GB-Mod #1 Rev 3.6 10/03 2
LEAN MANUFACTURING IS:

 Overall operational philosophy relative to daily management of


operations
 System Based tools to improve processes
 Drives continuous, incremental improvement

Continuous Flow / U Shaped Cells Standardize Work / Shop Floor Kaizen


Synchronous Production (JIT) Problem Solving - PDCA
Pull Systems (Kanban) Jidoka - Autonomation, PokaYoke, Andon
Production Smoothing Mistake proofing -PokaYoke
Level Production / Line Balance Work Place Organization - 5S
(hiejunka) Visual Factory - Accountability, Pace Boards
Value Stream Mapping TPM
Produce to Takt Time Quick Change - SMED
Lean Assessment
Metrics Process Certification
DTD
OEE
FTT

© Visteon Corporation GB-Mod #1 Rev 3.6 10/03 3


What is Lean? Individual Lean Components
Creating the Lean Production System

Manufacturing
Cellular
Continuous 1000
0
1 2 3 4 5
Lean Manufacturing - Check List
Flexibility
Does the
Is
Can
the
of
posted
Were
Are
either
number
At
and
dized
thethe
lay out
Can
the
Are
work
Are
Inventory
the
that
sheets
Are
sheets
station
Work
inside
theallow
cellthedevoid
diagrams
the
addition
operators
Standar
QPS
the side
proper
operators
have
Are
Management
Do
Are
manning
the
levels
If
at
1)
would
subtraction
work the
operation ou
written
Max/mins
yposted
ythe
of
operators
station
easily to
optimal
obstructions
showing
the ofQPS
work
efficientlyofcell
? (Figure
ou
operator?
ythe
ou
the
required
posted
Batch/Safety of
station
material
their
by
utilizing
strategy
of athe
clearly
have
cell?
operator
levels
workers?
Is
behind ofclearly
clearly
them?

Improvement
feed
Is
aAre the
forlocal
cell racks
cell
various
with insure
fed
market? via
identified
local
(Figure the 8)as
market,
identified?
vs............ on cell
few
the
Fillis it
takt
a“Minimum
Inidentified
(Figure
Does
FIFO? the 1) on
cell
(Figure
asreplenishment
output
oneutilization
material
inventory
clearly (i.e......
operator?
feed
defined
time
material
Station
Active
demonstrate
10) a
1,2,3…
route?
racks?
racks
and color
supports:
charts?
Required”
produced
Quality
commitment (figure
by tothe
Operators)?
coded
FIFO, to
or Max/Mins,
80

60
2) station
cell
message
in by sub
Seconds

40
(Figure
match
Batch/Safety 9)
processes? on and
20

0
display ed
quality through
1 2

product
3

color
4
Operator
5

coding.
6

material
the extensivefeed
ty pes?
racks?
use (Figure
of Poka
(Figure 8)
3)
Yoke and
error
detection?
Systems
Pull

A B C No
A B C Yes
Part Name Quantity
Kan CIMPart
Label
Nameto Build
Quantity
CIM Label
Part to Build
ban From: CIMTo:Name Quantity
Label to Build
Model
From: To:
Card Model
From: To:
s Observation Model
Preceding Market CD132 Subsequent Observation
Reorder
Process # 100 -D12 Cluster Process
Part Number: 98BP-10E853-BF
Line - Location Observation
PointReorder
Preceding Market C CD132 Subsequent
Process # 100 -D12
Part Name: Appliqué
Cluster
Line - Location
Process Point Reorder
Part Number: 98BP-10E853-BF
Supplier:
Preceding Market C
Serigraph
Process # 100 -D12
CD132
Cluster
Subsequent
Process
Point
Part Name: Appliqué Line - Location
Part
1 Number: 98BP-10E853-BFC CD132
Boxes Required Box
Preceding Market
size 12”x15”x12 Subsequent
Supplier: 1000Serigraph
Box Capacity # 100 -D12
(inches)
Process Cluster Process
Part Name: Appliqué Line - Location
Part Number: 98BP-10E853-BF
Boxes Required 1 C
Box size 12”x15”x12
Supplier: 1000Serigraph
Box Capacity (inches)
Part Name: Appliqué
Boxes Required 1 Box size 12”x15”x12
Supplier: 1000 Serigraph
Box Capacity (inches)

Boxes Required 1 Box size 12”x15”x12


Box Capacity 1000 (inches)

* PLAN FOR EVERY PART (PFEP)

© Visteon Corporation GB-Mod #1 Rev 3.6 10/03 4


Inventory Profile of the
UK Automotive Supply Chain
First Tier Inbound Vehicle Outbound Distribution
100 Suppliers Logistics Manufacturers Logistics & Retail
90 Max
80 Average
Days of Inventory

70 Min
60

50

40

30

20

10

Customer
Outbound
Components
Pre-Assembly

Marketplace
Loading &
On-site Part
Assembly WIP

Despatch
In-house built

Production WIP
Bought-out Parts
Raw Material

Inbound Transit

Transit
Finished

(VM)
Parts

Vehicle
WIP

Source: Holweg (2002)

© Visteon Corporation GB-Mod #1 Rev 3.6 10/03 5

S-ar putea să vă placă și