Keller Group : Is the largest independent Jet grouting
geotechnical solutions specialist in the world. With
operations in more than 40 countries across six
continents.
Established in 1860 and has more than 20 major
acquisitions since 2018.
Headquarters: London, England.
In India: Chennai
Keller work at Polavaram project:
Jet grouting for up stream and downstream
Coffer dam.
Working time :4months
SILENT FEATURES

LOCATION: Up stream and down


steam of ECRF dam.
DESIGN FLOOD: 28 lakh cusecs.
U/S SIDE AND D/S SIDE COFFER
DAM LENGTH:2356m and 1613m
TOP BANK LEVEL OF U/S SIDE
AND D/S SIDE COFFER DAM :
42.03m AND 28.00m
TYPE OF CUT OFF: Jet grouting
20m at u/s side and 10m at d/s
side.
Work involvement:
Jet grouting at u/p stream side coffer dam.
Geotechnical aspects: Up stream coffer dam section:
Sand is cohesion less soil so it as
low water tightness compared to
cohesion soils.
To with stand the pressure of 42m
400pas and also to acts as a barrier
to stop the water from u/s side of
dam to d/s side “Jet grouting” is
selected.
Generally co efficient of
permeability of sands are 10^-6,so
we have increase it up to 10^-9.
Bed rock is found at 40m to 90m sand
from the river bed.
Depth of sand layers is varies from silt
26m to 40 m.
Slit and clay: varies at different
depths. clay
Pressure at bottom of the dam is
400pas. Bed rock
Site Installation
Cement Silo

Water

GI-50JCII
Generator

Air compressor
1 2

5 4 3
CONSTRUCTION SEQUENCE:
Back flow Air Backflow
Grout
Grout Air Backflow
Water
Air shrouded Grout
Grout jet grout jet Air shrouded
water jet
DRILL STRING
Grout jet

NOSSIL

1-PHASE SYSTEM 2-PHASE SYSTEM 3-PHASE SYSTEM

1.DRILL THE HOLE 2.ROTATE THE STRING WITH KINETIC ENERGY 3.COMPLETE THE
WITH THE DRILL STRING LIFT UP AND START GROUTING GROUT
Working details
1.Outter and inner diameter of drilling rod are 114.4mm
and 35mm respectively.
2.Daimeter of the Nozzle is 4.5mm.
3.Roatation of the string 6rpm.
4.Withdraw of the grout 25cm/min.
5.Daimeter of the column is 2m and center to center
spacing is 1.5m and pitch distance of 40mm.
6.No of grout columns are1530.
7.Over lapping of columns are 0.5m.
8.Depth of column is 2m.
9. Grout Pressure 400pas and air pressure 1-6bar.
Completion of jet grouting
Conclusion
Polavarm project is the life line of telugu people
Thank you