SPP Document 203 (replacing the 1979 UAP Doc. 203)
SPECIALIZED ARCHITECTURAL
SERVICES
Specialized Architectural Services deals with specific expertise for
further enhancement of the architectural interior and exterior
components of a project.
Architectural Interiors (AI)
Acoustic Design
Architectural Lighting Layout and Design
Site Development Planning (SDP)
Site and Physical Planning Services (including Master
Development Planning, Subdivision Planning and Urban Design)
Comprehensive Development Planning
Historic and Cultural Heritage Conservation and Planning
Security Evaluation and Planning
Building Systems Design
Facilities Maintenance Support
Building Testing and Commissioning
Building Environmental Certification
MANNER OF
PROVIDING SERVICES
The Architect may enter into contract with the Owner in two possible ways:
• Working in a dual capacity as Architect-of-record and as
Consulting Architect
• Working as Consulting Architect only.
METHOD OF COMPENSATION
Compensation for the foregoing specialized architectural services, all of
which may be classified as additional or extra services, shall be through
man-months i.e. 22 man-days multiplied by 8 man-hours, and multiplied
by a factor to cover other direct and indirect costs e.g. overhead, etc. or
any other applicable mode of determination of the Architect’s fee as
stated in Doc. 201, Doc. 202 and the Architect’s Guidelines.
FULLTIME
SUPERVISION
SERVICES
SPP Document 204-A (replacing the 1979 UAP Doc. 204-A)
4design and building
principal members
that were involved in the

construction process
• The Owner who orders for the implementation of a project;
• The Architect and his Specialist Consultants (SCs) who render plan /
design services and limited inspection work;
• The Contractor who performs the construction work;
• The individual or group of individuals who assist in the supervision
and delivery of the work.
SCOPE OF SERVICES
• Quality Control
• Evaluation of Construction Work
• Preparation of Daily Inspection Reports
• Filing of documents
[The detailed tasks shall be as specified under the Architect’s
Guidelines.]
method
of compensation
• Percentage (%) of Project Construction Cost (PCC)
• Multiple of Direct Personnel Expenses
• Professional Fee Plus Expenses
• Lump Sum or Fixed Fee
• Per Diem, Honorarium Plus Reimbursable Expenses
• Mixed Methods of Compensation
LIMITATION
of AUTHORITY
• The Construction Supervision Group (CSG), which may
be a qualified architectural firm, or which the Architect is
only part of, shall not assume the responsibility of the
Contractor’s project superintendent.
• The CSG shall not make decisions on matters that are
the sole responsibility of the Architect-ofrecord (Aor).
LEGAL RESPONSIBILITY
• The Construction Supervision Group (CSG) is responsible to the Owner only
for administrative matters. For technical matters, the CSG is responsible to the
Architect-of-record (Aor).
• Under Article 1723 of the present Civil Code, the CSG may appear not to have
any legal responsibility since the Architect-of-record (Aor) and Engineers-of-
record (Eors) are responsible for the design while the Contractor is responsible
for the construction. However, a Service Contract / Agreement between the
CSG and the Owner may stipulate certain professional responsibilities and
civil liabilities of the CSG, particularly if the CSG is party to the review of the
Contract Documents and their subsequent evaluation and interpretation during
the course of construction.
• If the Aor (and Eors) and the Contractor are sued by an Owner for civil
liabilities due to the performance or non-performance of certain acts traceable
to the CSG, the Aor and Eors may file cross claims against the CSG.
Q UALI F I CATI O N S
• A Bachelor of Science in Architecture degree
• Extensive experience in design and building construction and
must be very knowledgeable in building materials and
construction detailing.