Documente Academic
Documente Profesional
Documente Cultură
……
Significant Cases in China
Power Grid
Protection and automation system for 1,000kV transmission project
Power Stability Control System for China Southern Power Grid
Industrial
SCADA, protection and control system for 24 MTPA steel project of
ShouGang Group
Commercial
30 out of 31 stadiums, 500kV Substation, for 2008 Beijing Olympic
projects, including Bird-Nest, Water Cubicle etc.
Significant Cases in Indonesia
PLTU Banten 1*600MW Suralaya Power plant + SA
PLTU Paiton 1*660MW Power plant
PLTU Labuan 2*300MW Power Plant
PLTU Baten 3*315MW Power Plant
PLTU Indramayu 3*330MW Power Plant + SA
PLTU Pactian 2*315MW Power Plant
PLTU Tanjung Awaw 2*300MW Power Plant + SA
PLTU Medan 2*200MW power plant
PLTU Muara Enim 2*150MW Power Plant + SA
PLTG Kapasitas 1*80MW Power Plant
PLTU CP Bahari 2*30MW Power Plant + SA
PLTU Bangka Belitung 2*30MW Power Plant + SA, IEC61850
PLTU Lampung 2*100MW power plant
PLTU Sulawesi Utara 2*25MW Power Plant
PLTA POSO2 3*65MW Hydropower Station
275kV Palopo Substation (Relay, SA, IEC61850)
275KV Pamona substation (Relay, SA, IEC61850)
150KV Tarahan Tanjung Selaki Substation (Relay, SA, IEC61850)
150KV Gorontalo, Substation (Relay, SA, IEC61850)
Countries & Regions Sold To
View
Smart Grid
Digital Substation
5 – 10 years
inexpensive and high-performaced
stored-energy devices
highly automatic grid The future
1 - 5 years
– mature technology
– Change the grid
electric vehicle power will become plant
micro grid
operating model
PhotovoltaicPlants
Intelligent measure
In a few more years
now
New technologies development
Large wind power plants
Current Grid Ahead to
The start of new technologies research
Current grid features:
Central generation, transmission and distribution Time-axis
Traditional Primary Equipments
Transformer
AC Grid
Inverter
Wind power plant Solar cells Household Energy storage Electric Load ,changed
generating device vehicle with price
Intelligent Secondary Equipments
Secondary Equipments in Smart Grid keep on developing with primary
equipments
Data Source
Substation
66%
Substation
Substation
Distribution Data
Power plants
Customer
Substation
Substation
IEC 61850
IEC 61850 or
Other protocals
BCU BCU
Relay Other IED Relay Other IED
Ethernet GOOSE---Trip ,
---Binary Output
Ethernet ---Bianry Input
Cable
Optical fiber
Traditional Substation(TS)
Analog data: acquisition, transmission, process and output
Traditional primary equipments
Can realize automation in substation with ethernet and protocol
Communication protocol :
Parts of IEC 61850 or Other protocol(eg:DNP3.0, Modbus……)
Digital Substation
Swithcyard Relay/Bay room
Primary Merging Unit
Current and
voltage
ECT/EVT Optic
MU fibre
Optic
Optic
Fibre
Fibre
Line Ethnet
Circuit Ethnet Protective
breaker Relay
Intelligent
...
terminal GOOSE SCADA
Line
Protective
Relay
Basis on application
• With GIS configuration
• With AIS configuration
• For HVDC application
Configuration of ECT/EVT
A ECT/EVT is normally composed of sensor and merging
unit.
C BA
Line relay1
MU1
Meter
BCU
MU3
BCU
MU1 ECVT ECVT
MU4 MU5 BCU
M-CT、PT
Trams. Relay 1
Or Emerging
MU2 ECVT
L-CT、PT
Line relay 2
MU2
PMU/ FR
ECVT
MU5
MU4 Busbar relay2
PMU/FR
ECVT
MU6 MU6 PMU/FR
M-CT、PT
Trans. relay2
Or Emerging
Y L-CT、PT
Y
Use of ECT/EVT
MU
Line Prot.
Use of ECT/EVT
① on-line monitoring
② intelligent control
③ digital interface
④ Electronic actuator replacing mechanical executing
Intelligent circuit breaker control device
• Implementation
optical fiber
New Scheme
cable
Traditional Scheme
Intelligent GIS control panel + distributed protection (intergrated)
Intelligent interposing relay set
– Damp proof
– dust proof
•
MMS
Real-time
TCP
IP
Ethernet link layer
Ethernet physical layer with priority
GOOSE application
Relay tester
Analog/Digital input
3. New status
4. Reclose Ethernet
5. New status
Intelligent primary Goose Message:AR
equipments
Goose Message:CB S
PCS-915 PCS-931 PCS-902 PCS-931 PCS-902 PCS-915 PCS-915 PCS-902 PCS-931 PCS-915
PCS-997 PCS-997
PCS- 9705 PCS- 9705 PCS- 9705 Fault Recorder Fault Recorder PCS- 9705
GOOSE
Opital Fiber Ethern
……
500kV Relay Room
275kVRelay Room
Two sets of protection using separated duplicated networks
PCS-915 PCS-931 PCS-931 PCS-915 PCS-931
PCS-997 PCS-997
PCS- 9705 PCS- 9705 PCS- 9705 Fault Recorder Fault Recorder PCS- 9705
GOOSE
Optical Fiber Ethernet
……
PCS-222
PCS-997 PCS-997
Fault Recorder Fault Recorder PCS- 9705
• Real-time trip/close
command and
E
reciprocal signals are
R
TC
SS
network.
• IEC61850
MU + Intelligent Circuit Breaker communication
standard applied.
CT/VT
Solutions for digital substation
Independent dual-network
with star configuration is
Ethernet applied.
TC
SS
N
E
CT/VT
Solution for SAS
• Reliability
Network storm
Network redundancy
Network self-healing
• Safety
Network-induced delay will affect the relay
• Complexity
Network configuration
Network supervision
Network maintenance
• Expansibility
The difficuties in the extension of substation
The difficuties in configuration of new bay
Keep the performance of network after adding bays
Config simply
Single Star
Manage easily
Distributed network;
1breakpoint can be permitted when it runs;
Single Ring When link broke, it should be switched automatically to
bus model;
An economical and reliable model
Redundant network;
Config simply
Double star
Manage easily
Reliable model
No redundancy
Single Star
No switch-time
<5ms × N
Single Ring
(N: The number of switches in the ring)
=0 ms
Double star
Tow star networks run simultaneously in NR’s SAS
=0 ms
Double Ring
Tow star networks run simultaneously in NR’s SAS
Ring & Star
Network
Disadvantages
topology
No redundancy
Single Star
If the key switch broke down, whole network collapses
Double star The number of switch is more than single star/ring models
SNTP
IRIG-B Syn-Bus
IRIG-B Syn-Bus
Switch PCS-9882
GPS RCS-9785
RTU RCS-9698
SNTP
IRIG-B Syn-Bus
Switch PCS-9882
Switch PCS-9882
RTU RCS-9698
Protocol Convertor
IEC103 P132 relay
Modbus Mk6E meter
Alarm processing
Acknowledgement of alarms
Filtering
Time Selection
Grouping
Class
Event query
Fault Report
Graphical Analysis
Comtrade Analysis
Trending
Time Selection
Point Selection
Scale Adjust
Currents Display
Trending
Two types of trend display objects are
provided:
Real-time trends
The curve is updated each new
value
Historical trends
Display archived information
The number of curves can be displayed
in each diagram is not limited
Used for comparisons
Have the same value axis
Trending
Trending
Report
Daily report
Monthly report
Annually report
Report saving, exporting, printing
Report data analysis
Real-time report
Report Handling
RCS-9701C
BAY CONTROL UNIT
HEALTHY
ALARM
C RST
ENT
ES
CPU 1
PWR 1
AI(AC)) 1 2 1 2
AI(DC) 1 0 1
BI 5 1 2 3 1 5
BO 1 or 2 1 1 or 2 0 1 1 1 or 2
BO(IL) 0 or 1 0 0 or 1 0 0 or 1
AO 0 1 0
DC quantities
0~20mA, 0~250V
AC quantities
Harmonic Data
Up to 15th Harmonic
Functions
Binary Input:
Optical-Coupler
Binary Output:
No check Mode
Synchronism-check Mode.
Functions
Interlocking Logic
: interlock information
Time Synchronization
IRIG-B Synchronization system
Bus2
M011 M012
Ua= 0.03 V
Ia= 0.02 A
M01
P= 0.01 W
Q= 0.002 A
M019
cos = 0.000
Line1
01025 06-01* 21:22:54
Remote Control
Redundant RTU
IEC-101 communication testing
IEC-104 communication testing
System redundancy
Redundancy testing
HMI
BCU
RTU
Protocol convertor
Dual machine mode
HOST STANDBY
RCS-9698H RCS-9698H
(host machine) (standby)