Sunteți pe pagina 1din 15

01/15

2nd CII National Kaizen Circle


Compétition 2019

A Kaizen Presentation By

(SANDEN VIKAS INDIA PVT. L.TD. )


On: 11 & 12th June -19

Venue : India Habitat Centre , New Delhi

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Company Profile 02/15

SVL-2 PVL

SVP SVL-4

SVL-3

50:50 Joint Venture Since 1982 between


Vikas Group India and
Sanden Japan

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


03/15
Company Product & Customers
Collaboration Products Customers
SOB % 1) Compressor
 SDV(6V)
SVL STR
 SDV(7V)
Sanden Vikas 50 50 SD7
2) HVAC
India
3) Hose & Pipe

1) Condenser
PVL
Pranav Vikas 76 24 2) Evaporator

India 3) Heater Core

SVP
1) Aluminium
Sanden Vikas 49 51 HPDC
Precision
2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019
Kaizen Theme 04/15

Kaizen Theme:- TO REDUCE THE CHANGE OVER TIME OF REAR HEAD


BOLT TIGHTENING MACHINE.

Implemented Area:- COMPRESSOR ASSY. LINE

Implementation Team:- TEAM CREATIVITY CREW

Rajesh Aggarwal Mayank Kaveya Rashid Tarun

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Problem / Present Status 05/15

Min.

Time Contribution of Activity


Min.

During Changeover

THE LOWEST AVERAGE CHANGE OVER TIME OF LINE IS 10 MIN. SO TO BALANCE


THE LINE, WE TAKE OUR TARGET TO REDUCE FROM 17 MIN. TO 10 MIN.

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


06/15
Root Cause Analysis
FISHBONE ANALYSIS
Machine Man

Low Skill
Model Change-over
Time is More M/C Need Some Less Practical
2 time 1
Training
Complex Programming for
change over
Change Over
Time (17 Min.)
Jig Change-over
Time is More Tool design Is
Complex

3
Material Method

Accredit all Probable Causes and Found 3 Main Causes


Out of 3 Main Causes

High change over time


on R.H. Bolt tightening Valid Jig change over time is high.
(We validate it through gemba audit.)
station
2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019
Root Cause and Idea Generation 07/15

ROOT CAUSE IDEA GENERATION

STR-06
JIG CHANGE OVER TIME IS MORE. WHY-1

TWO DIFFERENT JIGS USED FOR TWO


MODELS. WHY-2

STR-08

LOCATION OF DISCHARGE PORTS ARE


DIFF. IN BOTH MODELS. WHY-3

COMMON JIG DESIGN


CONSIDERATION WAS NOT TAKEN FINAL ROOT
WHY-4
CAUSE IN BOTH MODELS , THE LOCATION OF
DURING NEW MODEL DISCHARGE PORTS ARE DIFFERENT. SO WE
IMPLEMENTATION NEED TO COMMONIZE THE JIGS.

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Countermeasure 08/15

FOR STR-06 FOR STR-08

3 1

6
5

2
4

Cutting the Cross-section Area Into One Jig & Make Use In Both
Models Easily.

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Before Situation 09/15

In Past , We Are Using Two


Different Jigs For Our 2
Models & It Takes 12.3 Min.
To Change The Jigs &
Programme In PLC.
Before
FOR STR-06 FOR STR-08
Min.

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


After Situation 10/15

Cutting the Cross-section


3 1 Area Into One Jig & Make
6 5 Use In Both Model Easily.

2
4
Min.

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Benefits Achieved 11/15

Qualitative:- HOW TO WORK IN A TEAM , STRONG DETERMINATION ,


DEVELEOP AS A FAMILY (EACH MEMBER,DEPT. &
ORGANIZATION)

Quantitative:- WE INCREASE THE PRODUCTIVITY BY 1.80 TO 1.83

Productivity :
SAVED MIN. (17 TO 10 MIN.) 7 MIN.
CYCLE TIME IS 1 MIN.

TOTAL COMP. WILL INCREASE 7 NOS.

AVRG. CHANGEOVER IN MONTH 20 TIMES


20X7 = 140
IT MEANS WE INCREASE COMPRESSORS
PER MONTH

COST OF 140 COMPRESSORS 140X4805 = 1176700 INR.

TOTAL INVESTMENT IN KAIZENS 97217 INR.


SO , WE SAVED TOTAL INR . 1079483 INR.

WE SAVE 1.07 MILLION


2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019
Standardization 12/15

1. TOOLS , JIGS & FIXTURES SHEET UPDATED


1 Template 06 P-1100-1 1 Set - - 60 2

2 Template 08 P-1100-2 1 Set 2


Head Bolt
P-1100 Tightening
Station Communized tool for STR-08 &
3 P-1100-3 1 Set - - 60 12
STR-06

4 Bolt Ht. Checking Tool Shaft P-1100-4 1 Nos. 1350 - 20 6

2. PM CHECK SHEET UPDATED 3. NEW MODIFIED JIG

3 1

6 5

2 4

IN NEW JIG DESIGN WE HAVE A WIRE DRESSING


GROOVE TO PROTECT THE WIRES SENSORS

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Horizontal Deployment 13/15

SDV-1
SAME ACTION TO BE
IMPLEMENTED IN
OTHER RELEVANT
SDV-2 ASSEMBLY LINES
AFTER CHECKING
FEASIBILITY
SD7

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019


Kaizen Sheet Category: Company MM/YY Sr.
No.
Reactive Proactive Innovative SVL 02/19 1
Kaizen Title: TO REDUCE THE CHANGE OVER TIME OF STR LINE. Implemented Area:- STR LINE
Problem/Present Status: Before Improvement:
12 1010 10 Implemented by:- PROD./P.E.
10
8 4.94.7 5
6 4 3 3
4 0.75 1 1.50.25 1.5
2 0.250.5
0 Result/Benefit:
(a) Qualitative
FOR STR-06 FOR STR-08 1. WROK I N TEAM
2. DEVELOP AS A FAMILY
Root Cause Identification: After Improvement:
(b) Quantitative
WHY-1
1. INCREASE
JIGS CHANGE OVER TIME IS MORE.

TWO DIFFERENT JIGS USED FOR TWO MODELS. WHY-2


PRODUCTIVITY
3 1 2. BY 1.80 TO 1.83
LOCATION OF DISCHARGE PORTS ARE DIFF. IN
BOTH MODELS. WHY-3 6 5 Standardization:
2 1. Tools , Jigs & fixtures list
4
COMMON JIGS DESIGN CONSIDERATION WAS NOT
TAKEN DURING NEW MODEL IMPLEMENTATION
FINAL ROOT
CAUSE 2. PM check sheet

Root cause:- COMMON JIGS DESIGN How many places this


CONSIDERATION WAS NOT TAKEN DURING Kaizen can be deployed
NEW MODEL IMPLEMENTATION.
horizontally:-
Idea to eliminate root cause :- 1. SDV 2. SD7
COMMUNIZED THE BOTH TOOLS
Counter-measure :- Cut a cross 14/15
section area
15/15

ANY QUESTIONS…?

2nd CII NATIONAL KAIZEN CIRCLE COMPETITION 2019