• Concrete in foundations. • Masonry stone/brick/brick blocks • Foundation treatment • Damp proof course • Rcc for beams ,columns, slabs etc • Plastering/pointing • Flooring and floor finishes • Doors and windows • Steel reinforcements • White washing • Electrical works • Sanitary and water supply. STORAGE WORKS • RIGID DAMS: • Formation of coffer dam • Consolidation and curtain grouting • Rcc for body wall • Fabrication,erection and operation of gates EARTH BUNDS • Drilling and curtain grouting • Filling cut off trench • Laying metal and sand filters • Foundation of rock toe and drain • Formation of hearting zone and casing zone • Revetment and model walls PUMPING SCHEMES • Supplying,erection,testing and commissioning of electrical driven pumps • Construction of jack wells/sump well/pump house • Laying pressure mains. • TUNNELING: • Drilling the rock to the shape. • Lining cement concrete GENERAL SPECIFICATIONS • Setting out.(theodalite,brick pillars) • Workmanship,materials,steel,coarse aggregate. • Fly ash solid blocks. • Paints • Water(APSS 129) • Tiles(APSS 121) BUILDINGS • Earthwork: • Earthwork excavation with initial lead of 10m and lift of 2mts. • Earthwork excavation in hard rock upto 2mts.(40% voids). • Hard rock ini9tial loead is 15 mtrs. MASONRY • Foundation and plinth area is taken as one item.(superstructure as separate item) • Deductions are made like windows, doors etc • No deductions for opening up to 0.1sq.m • End of beams,posts,rafters,purlins etc up to 0.05sq.m • Bearing of chajjas up to 10cms. ….contd • Only table moulded bricks are used . • Frog,absorbtion of water should be seen. • Both vertical and horizontal joints are 20mm. • Curing shall be done for 21 days. • Bad practice to make holes in the brick masonry. • Bond stone for every 1.2m. FOUNDATION CONCRETE • 20 TO 45 cms.generally it is 30cms. • Placing of concrete at a height of 1.2m. • Testing should be done as per IS516 • Fineness modulus 2.4-3. • Expansion joints-45mts • Nominal mix and design mix. FORMWORK • It consists of shores,bracings,sides of beam and columns,bottom of slabs etc. • Material shall be sawn timber,plywood and metal. • Tolerances of 12mm more and 6mm less is permissible. • Removal of formwork shall be as follows. vertical formwork to columns-16hours Soffit to slabs-3days Soffit to beams-7days Props to slabs-7days Props to beams-14days cover • Mild-20mm • Moderate-30mm • Sever-45mm • Very severe-50mm • Extreme-75mm Flooring works • Flooring with ceramic tiles,shahabad stone, granite flooring etc shall be checked for bed mortar. • A small hammer shall be tapped on the floor. • Flooring with marble slab-18 to 20mm and base coat of 12mm.