BUILDINGS

• Earthwork excavation for foundation.


• Concrete in foundations.
• Masonry stone/brick/brick blocks
• Foundation treatment
• Damp proof course
• Rcc for beams ,columns, slabs etc
• Plastering/pointing
• Flooring and floor finishes
• Doors and windows
• Steel reinforcements
• White washing
• Electrical works
• Sanitary and water supply.
STORAGE WORKS
• RIGID DAMS:
• Formation of coffer dam
• Consolidation and curtain grouting
• Rcc for body wall
• Fabrication,erection and operation of gates
EARTH BUNDS
• Drilling and curtain grouting
• Filling cut off trench
• Laying metal and sand filters
• Foundation of rock toe and drain
• Formation of hearting zone and casing zone
• Revetment and model walls
PUMPING SCHEMES
• Supplying,erection,testing and commissioning
of electrical driven pumps
• Construction of jack wells/sump well/pump
house
• Laying pressure mains.
• TUNNELING:
• Drilling the rock to the shape.
• Lining cement concrete
GENERAL SPECIFICATIONS
• Setting out.(theodalite,brick pillars)
• Workmanship,materials,steel,coarse
aggregate.
• Fly ash solid blocks.
• Paints
• Water(APSS 129)
• Tiles(APSS 121)
BUILDINGS
• Earthwork:
• Earthwork excavation with initial lead of 10m
and lift of 2mts.
• Earthwork excavation in hard rock upto
2mts.(40% voids).
• Hard rock ini9tial loead is 15 mtrs.
MASONRY
• Foundation and plinth area is taken as one
item.(superstructure as separate item)
• Deductions are made like windows, doors etc
• No deductions for opening up to 0.1sq.m
• End of beams,posts,rafters,purlins etc up to
0.05sq.m
• Bearing of chajjas up to 10cms.
….contd
• Only table moulded bricks are used .
• Frog,absorbtion of water should be seen.
• Both vertical and horizontal joints are 20mm.
• Curing shall be done for 21 days.
• Bad practice to make holes in the brick
masonry.
• Bond stone for every 1.2m.
FOUNDATION CONCRETE
• 20 TO 45 cms.generally it is 30cms.
• Placing of concrete at a height of 1.2m.
• Testing should be done as per IS516
• Fineness modulus 2.4-3.
• Expansion joints-45mts
• Nominal mix and design mix.
FORMWORK
• It consists of shores,bracings,sides of beam and
columns,bottom of slabs etc.
• Material shall be sawn timber,plywood and metal.
• Tolerances of 12mm more and 6mm less is permissible.
• Removal of formwork shall be as follows.
 vertical formwork to columns-16hours
 Soffit to slabs-3days
 Soffit to beams-7days
 Props to slabs-7days
 Props to beams-14days
cover
• Mild-20mm
• Moderate-30mm
• Sever-45mm
• Very severe-50mm
• Extreme-75mm
Flooring works
• Flooring with ceramic tiles,shahabad stone,
granite flooring etc shall be checked for bed
mortar.
• A small hammer shall be tapped on the floor.
• Flooring with marble slab-18 to 20mm and
base coat of 12mm.