performance with an
integrated solution
Bratin Roy
Vice President - Industry Service
TÜV SÜD South Asia
1 Background
3 Benefit
In today’s changing environment, fossil-fuel plant owners face significant lifecycle management
challenges
Along with existing issues like price pressures due to market liberalisation, new concerns of
climate change and other environmental issues have further impacted the industry
Operation and maintenance cost reductions are needed along with performance improvements
along the entire lifecycle
As a result, fossil fuel power plants need to be more flexible, reliable and efficient, while cutting
emissions. In some countries, government has initiated fuel-saving or energy efficiency
program, which constitutes further Market Based Instruments(MBI) for plant operators to
improve efficiency and reduce their fuel consumption
In India, Govt. has already approved MBIs like PAT ( Performance, Achieve & Trade Scheme)
1 Background
3 Benefit
Condition Assessment
Operation & Maintenance – status
assessments
Operation & Maintenance – in-service
inspection
Risk-based inspection and maintenance
Performance Measurement
Efficiency and reliability improvement
solutions
Integrated plant retrofits along with
comprehensive Renovation &
Modernisation Program
Condition Assessment
These evaluations focus on establishing the current
condition of assets for more precise planning of
refurbishment or optimisation.
Condition assessments provide a
comprehensive review of the status of all plant
equipment
Risk assessments review factors influencing the
operational reliability of plant components and
assist in planning of refurbishment activities
Damage assessments are used after an incident
to identify affected equipment and guide repair
efforts
Component assessments provide an up-to-date
condition status of all components and systems
Modern maintenance
Benefits
and retrofit techniques
Our TÜV-RoiM strategy combines reliability We base our qualitative and quantitative techniques
and risk assessments with information extracted on internationally accepted standards and
from expert judgment, physical models, and guidelines, and tailor the solutions to your specific
plant-specific and generic data concerns
Fact Procedures
Around 70% of the world’s power plants use coal, Combustion Control Optimisation
natural gas, oil, biomass or solid waste to generate Cooling System Heat Loss Recovery
electrical energy. Flue Gas Heat Recovery
Low-Rank Coal Drying
7 -15 % of the power generated at fossil-fuel plants Sootblower Optimisation
is consumed by the plant’s auxiliary systems. Steam Turbine Design Review
Condenser optimization
Auxiliary systems are a major part of a power Improvements and optimisation of other auxiliary
generation facility. They include all the drive power systems
applications (pumps, fans, motors, drives), electrical
balance of plant and instrumentation, control and A successful energy efficiency program would
optimization systems. require a detail technical and independent
evaluation of power plant and related system
Much of this energy could be saved or sold to evaluation, and a cost vs. benefit analysis to obtain
generate higher plant revenues. By improving the reliable cost estimates for the options under
efficiency of each auxiliary, energy consumption of consideration, taking into account site-specific
an existing facility can be reduced by 10-30% conditions
Integrated retrofitting
Optimise availability and reliability over the long term.
Component/part retrofitting is not sufficient specially when ultimate goal is total asset optimisation and highest
possible generation
By organising, an integrated program that incorporates various upgrades across the plant, matching the
capabilities of any combination of main components and associate parts it delivers maximum efficiency in most
cost effective life extension solution
With limited budget and timeline integrated retrofit solutions are a great way to explore hidden potential without
the involvement of huge capital
Achieve rated output/higher than Review /Study of Design basics, Life Extension for another 15 to
rated Output Erection, first commissioning and 20 years is possible
Better availability of generating O & M record/reports
equipment Energy Audit Increase of rated capacity 4% -
Improved performance / Performance testing 8%
efficiency and life extension of Hot and cold walk-down survey
unit of the plant Increase of efficiency 8%-10%
Facilitate adoption of improved Interaction with O & M staff
operations and maintenance Non-destructive tests
practices. (Mechanical tests and Electrical
Improvement in emission levels tests on critical components,
from thermal power plants Dynamic behavior tests)
Evaluation and analysis of test
results
Preparation of R & M proposal &
Cost benefit analysis
3 Benefit
Peace of Mind
Key Success
Factors
1 Background
3 Benefit
1 One-stop Technical
Solution Provider
Global Headquarters:
Munich, Germany
GERMANY INTERNATIONAL
INVESTMENT OPERATION
Calculation
Simulation
Performance tests
Due diligence
Site assessment (TDD - technical, EDD - environmental)
Strengthen
Minimise risk,
your competitive
improve reliability
edge
We help you to reduce the risk of
conventional power plant incidents, Leverage on our expertise in safety
enhance safety for people and the and statutory compliance for legal
environment, increase process certainty. Third-party certification by
transparency and eliminate TÜV SÜD demonstrates your
interface problems. commitment to quality.