Sunteți pe pagina 1din 8

SSCVT DT1 Analysis

I-KA-KRJP-ENB-B003-C2-DT1-(FD1800)

Scope : Growth

Date : 24-Sep-18
4159_Abdul Qadir
SCVT KPI
Final KPI Result
I-KA-KRJP-ENB-B003 is Fail (15/16)
01. Single Site SSCVT Acceptance Checklist

KPIs Call Model Category Target Value Carrier A1 Status

Successful Handover (Intra-eNodeB) DTDL, DTUL, VoM KPI - 38/38(6,12,20) PASS


Successful Handover (Inter-eNodeB) DTDL, DTUL, VoM KPI - 10/13(0,1,9) PASS
RSRP DTDL, DTUL KPI >= 90 % 92.17%(1847/2004) PASS
Overlapping Servers within 5 dB <= 1 DTDL, DTUL KPI >= 60 % 79.27%(1568/1978) PASS
Overlapping Servers within 5 dB <= 2 DTDL, DTUL KPI >= 90 % 98.33%(1945/1978) PASS
MAC Throughput DL >= 1000 Kbps DTDL KPI >= 90 % 98.2%(1258/1281) PASS
MAC Throughput UL >= 256 kbps DTUL KPI >= 90 % 99.92%(1252/1253) PASS
Average MAC Throughput DL (kbps) DTDL KPI >= 8300 7877.65 FAIL
Average MAC Throughput UL (kbps) DTUL KPI >= 4600 5417.35 PASS
SINR >= 2 dB DTDL, DTUL KPI >= 95 % 97.42%(1927/1978) PASS
Avg SINR DTDL, DTUL KPI >= 12 15.53 PASS
Avg RSRP DTDL, DTUL Info - -86.37 Report Only
VoLTE RTP Packet Loss Rate VoM KPI <= 1 % 0.04% PASS
Handover Interruption Time < 100ms DTDL, DTUL,VoM KPI >= 95 % 95.83%(46/48) PASS
IMS Registration Setup Time < 1.5 s VoM Info - 0%(3.09) Report Only
VoLTE Setup Time < 1.5 s VoM KPI >= 95 % 100%(0.31) PASS
VoLTE Jitter < 40 ms VoM KPI >= 95 % 99.94%(2.63) PASS
VoLTE Latency < 100 ms VoM KPI >= 95 % 100%(24.35) PASS

DL UL
B1800 (Carrier A) 1st carrier 1st carrier
Avg. No. of RBs allocated 16.77 12.36
No. of samples 1285 1255
Throughput per RB (Kbps) 332 184
Dual Carrier Dynamic Threshold based on
5567.64 2274.24
assigned PRB (Kbps)
Status PASS PASS
Logic if combined achieved throughput>=dynamic threshold,

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 2


DT(Drive Test) information
Check items Description of Check point Verification Value Remarks
DT Stage DT1
Date of DT Start 22 September 2018
Date of DT Complete 22 September 2018
Date of Upload Complete into Vuze 22 September 2018

DTDL : 13
Quantity of Log files Number of Logs per Test Scenario DTUL : 13
VOM : 13

Conclusion Justification Approval


Condition Condition Detail
(Yes or No) (Check ) (CTO / NPE)
Exception Case Are there any exceptional cases? NO
Inter sector Separation ( <90 degree) Required a justification NO
For less driven or no driven in 1 or 2 sectors cases , required a valid
Missing Route Justification NO
justification supporting with Geo Coded Snap of blocked route
Sector Swap To be checked during analysis NO
Check log file reuse & also for stationary check which performed by
Log file Reuse case NO
SOLPARs to collect good sample
Physical Parameter Azimuth, E & M Tilt to be check for Target & Neighbor YES

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 3


DTR and Related check points
Check the Missing route / issue sites

1. Planned DTR Check Point


- DTR Should be approved by Jio RF Lead
Result : Yes

2. Total DTR Covered Check point


Covered rate
Category Distance (Km)
(%)
Planned Drive Route 9.7696 KM
94.55%
Actual Measurement Route 9.2373 KM

3. Redrive / Additional Drive Check Point


- Result : No , Additional drive not done

Covered DTR less than 90%, Required


justification with Geo code &snap
Justification for
missing route

Planned DTR

Actual DTR based on RSRP DTDL call model

*KML DTR to be embedded into SSCVT Vuze Generated Report in Analysis Worksheet
© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 4
DL PRB Utilization
Required Sector wise for target SCVT site of drive period , Source from JCP Site RAN Performance stats

Average of PRB Utilisation (DL)_RAN


60
50
40
30
20
10
0
12:00:00 PM 1:00:00 PM 2:00:00 PM 3:00:00 PM 4:00:00 PM 5:00:00 PM
22-09-2018

Cell

Date Time I-KA-KRJP-ENB-B003_c3 I-KA-KRJP-ENB-B003_c4 I-KA-KRJP-ENB-B003_c5

Drive duration

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 5


E Tilt Comparison [Target + All bands]
Site Information

Azimuth E Tilt M Tilt Antenna Height


Site ID Cell ID
2300 1800 850 2300 1800 850 2300 1800 850 2300 1800 850
I-KA-KRJP-ENB-B003 0 130 130 130 2 2 4 2 2 2 32 32 32
I-KA-KRJP-ENB-B003 1 240 240 240 4 4 5 2 2 2 30 30 30
I-KA-KRJP-ENB-B003 2 330 330 330 2 2 4 2 2 2 32 32 32

JCP/RET Tilt

Current
Jio State LSMR ID Date SAP ID Source Sector Id Cell ID Bands Antenna Type
RET
Karnataka KA-KA-REM-16-A 22.09.2018 I-KA-KRJP-ENB-B003 LSMR 0 2889507 1800 2 ODI2-065R17CL-G (MULTIBAND) (iRET)
Karnataka KA-KA-REM-16-A 22.09.2018 I-KA-KRJP-ENB-B003 LSMR 1 2889508 1800 4 ODI2-065R17CL-G (MULTIBAND) (iRET)
Karnataka KA-KA-REM-16-A 22.09.2018 I-KA-KRJP-ENB-B003 LSMR 2 2889509 1800 2 ODI2-065R17CL-G (MULTIBAND) (iRET)

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 6


Pre-Post Statistics [Applicable for If/Gr]
0022-Air MAC 2570-Total Bandwidth( Average-Total Voice Average-Air MAC DL Voice Call - Data Call -
Date Time Circle Jio Center Band Cell KPI Status
DL Traffic (GB) Voice Calls MHz) Calls/Sector Traffic (GB)/Sector Status Status
22-09-2018 21:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c3 0.15 1
22-09-2018 22:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c3 0.15 1 0.67 0.16 PASS PASS
22-09-2018 23:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c3 0.19 0
22-09-2018 21:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c4 0.12 22
22-09-2018 22:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c4 0.34 1 7.67 0.27 PASS PASS
22-09-2018 23:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c4 0.35 0
22-09-2018 21:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c5 0.3 11
22-09-2018 22:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c5 0.85 3 5.00 0.48 PASS PASS
22-09-2018 23:00 KARNATAKA KA-MNDY-JC01-0424 1800_1 I-KA-KRJP-ENB-B003_c5 0.3 1
5 PASS
PASS PASS

PASS PASS

PASS PASS

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 7


© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 8

S-ar putea să vă placă și