Sunteți pe pagina 1din 16

Run Back Interlocks

Run Back Interlocks


Boiler Run Back

Run Back
Permit
Turbine Run Back
Run Back Permits

Load Reject /
MFT

Master Control Run Back


Auto
Permit

T.Master Auto

TBN BYPS CV
FDF Run Back

A FDF

SET IF LOAD IS
B FDF
> 186 MW
FDF RUN BACK FDF RUN BACK
OPRATED
RESET IF LOAD IS
< 186 MW
RUN BACK
PERMIT

MW DEMAND
181 MW

REJECTION RATE
1086 MW/MIN
BFP Run Back
A BFP

B BFP

SET IF LOAD IS
C BFP > 150 MW
BFP RUN BACK BFP RUN BACK
OPRATED
RESET IF LOAD IS
< 150 MW
RUN BACK
PERMIT

MW DEMAND
145 MW

REJECTION RATE
1086 MW/MIN
AH Run Back

A AH

SET IF LOAD IS
B AH
> 186 MW
AH RUN BACK AH RUN BACK
OPRATED
RESET IF LOAD IS
< 186 MW
RUN BACK
PERMIT

MW DEMAND
181 MW

REJECTION RATE
1086 MW/MIN
GRF Run Back

A GRF

SET IF LOAD IS
B GRF
> 223 MW
GRF RUN BACK GRF RUN BACK
OPRATED
RESET IF LOAD IS
< 223 MW
RUN BACK
PERMIT

MW DEMAND
217.2 MW

REJECTION RATE
108.6 MW/MIN
BCP Run Back

A BCP

SET IF LOAD IS
B BCP
> 222.2 MW
BCP RUN BACK BCP RUN BACK
OPRATED
RESET IF LOAD IS
< 222.2 MW
RUN BACK
PERMIT

MW DEMAND
217.2 MW

REJECTION RATE
362 MW/MIN
CP Run Back
A CP

B CP

SET IF LOAD IS
C CP > 196.1 MW
CP RUN BACK CP RUN BACK
OPRATED
RESET IF LOAD IS
< 196.1 MW
RUN BACK
PERMIT

MW DEMAND
199.1

REJECTION RATE
362 MW/MIN
CWP Run Back
A CWP

B CWP

SET IF LOAD IS
C CWP > 205.1 MW
CWP RUN BACK CWP RUN BACK
OPRATED
RESET IF LOAD IS
< 205.1 MW
RUN BACK
PERMIT

MW DEMAND
199.1

REJECTION RATE
362 MW/MIN
Initial Pressure Regulator OPE
GEN OUTPUT ABN

MAIN STEAM
IPR IN
PRESSURE ABN

IPR IN/OUT

PMS SET REF. IPR OPE.

PMS CONTROL
MODE
s
GENERATOR LOAD
R

PMS CONTROL
TURBINE TRIP GEN CB 52 C ON GEN LOAD GEN LOAD
MODE
Vacuum OPE
COND. VAC. ABN

VACUUM UNL. IN

VAC. UNL. IN/OUT

VACUUM
UNL.OPE.

VACUUM
PRESSURE
s
R

TURBINE TRIP GEN CB 52 C ON GEN LOAD GEN LOAD


Load Limiter Regulator OPE.
GEN OUTPUT ABN

s
LLR OPE
GEN LOAD

R
GEN LOAD

TURBINE TRIP

GEN. CB.52C ON