#1 All PDTs and related functions are requested to start Sales Monitor activity according to the
attached schedule (Attachment #2).
For details see Request section contained in Attachment #1.
#2 All PDTs to confirm if cost function is handed over to NTCE (Attachment #4). If information in
Attachment #4 is incorrect (column E Responsability), please feedback to PMD by email by 26-
January
#3 If cost is not handedover to NTCE, PDT to confirm how the reporting will be done for Sales
Monitor by 26-January
Response Deadline Date: 26th January (All sections) + Sales Monitor Schedules dates in
TCF
Master schedule for B02E SV#1 Issued with the following milestones.
Link for Alliance Connect can be found here: SV#1 Master Schedule
NTCE-PMD-18-0012 - B02E SAF & SSA H4Bt Monozukuri Completion Confirmation Meeting (PM#6)
Please refer to Attachment #1 for the meeting agenda and Attachment #2 for details of the report items
required for the meeting. Attachment #3 is the overall schedule for PM#6 and the related preparation
meetings.
1. TCF-PMD-18-0016 B02E B02E Minor Change LC-BCS Cost Reduction Study Phase 1 was
issued on the 15th January.
LC-BCS (Life Cycle - Bottom Cost Strategy) purpose is to gather BOP technical cost reduction ideas
from Design for life cycle events which is needed to realise profitability plan to be proposed at LCP
(Life Cycle Plan) milestone.
B02E Minor Change LC-BCS Pre Review (Phase 1) scheduled for the 2 nd February 09:00 – 10:00.
Placeholder has been sent out to key persons, remaining invites will be sent out once the replies
from the TCF have been reviewed to understand who needs to attend.
ACTION
Provide feedback to Joe Campion by 28th January 2018 using the template in the TCF
There are some changes in B02E colour line-up in Renault Flins Plant.
Three new colours will be introduced in FY19 on B02E replacing three existing body
colours in Renault Flins facility:
Existing white pearl (QNC) will be replaced in July 19 by a new white pearl (QNY)
Existing silver (ZBD) will be replaced in July 19 by a new silver (KQA)
Existing Solid Ivory (D16) will be replaced in July 19 by a new body color: Solid
Urban Grey (KPW)
EOP of existing body colors _current Ivory (D16), white pearl (QNC) & silver (ZBD)_ is
planned on July 19
Three new colours to observe same application than colours being replaced and current
proposal is to introduce with the same timing as e-Power with different MS.
Apologizes that in the RMM submission, only 2 colours were presented (White & Silver)
but Colour Planning requested an additional colour (Urban Grey). Please refer to
attachment #5 B02E Flins Colour Plan for visualization of the colour alternatives
Actions
Please provide complete the DETT proforma, upload to AC location & confirm attendance
– by 22-Jan
Please review the Master Schedule lvl 1 and ensure your activities are aligned. – All
sections
Progress Meeting held 18/01 and Judgement from CVE was OK TO PROCEED TO ET3
PT1
APPCM#6
H5Dt
TOP DOC PM#4
Schedule Not
Yet Agreed
Today
Key points and comment
Project is still under NTC responsibility. Latest master schedule has been shared by KBA. Currently under
study
PMD to organise handover meeting shortly.
KKJ granted on 22/12. Still waiting for eDecision number from KBA
Actions
None Currently
B02E – LE#0.5
Short Term Schedule
MONTH JANUARY FEBRUARY MARCH APRIL
Wk No: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
W/C 1 8 15 22 29 5 12 19 26 5 12 19 26 2 9 16 23
PT2
MRD
PT2 D/N Cut Off
B02E – H4Dt MT
Short Term Schedule
MONTH JANUARY FEBRUARY MARCH APRIL
Wk No: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
W/C 1 8 15 22 29 5 12 19 26 5 12 19 26 2 9 16 23
Handover aCVE
levelling
aCVE/CVE MRD
milestone
H4Dt MT PM#5
Delay PT1 Elongation ET3 PT1 PT2
APPCM6
B02E SV#1
MONTH JANUARY FEBRUARY MARCH APRIL
Wk No: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
W/C 1 8 15 22 29 5 12 19 26 5 12 19 26 2 9 16 23
SV1 Master
PM 1 - TBC
Schedule
Issue MRD Trim
Today
Main Topic
PM#1 still not completed. PDT Status review meeting held on 16/01. 2 parts still require F4 Sheets signed – IP Console
and Seats. Review planned for 19/01 for status update. PM#1 will be scheduled once this is complete
Master Schedule Level 2 issued on 10/01 – main change from Level 1 is new timeline for easier reading.
PT1 Planned for week 18
Requests:
1. F4 sheets signed for seats and IP console with agreed costs. DB2 / DQ2 / PPM
SOP
PP 10 Cars
PM6 / DJM
SOP-J
MA Engine MA Vehicle
TODAY
Actions
5 weeks between
PM#6 & SOP
SOP
KO PM#6
APPCM #8
DJM
SOP-J/
TODAY
Key points and comments
Kick off meeting took place on Monday 08/01 (Please contact Joe Campion if you require a copy of the
minutes)
Currently only Tunisia in scope for April SOP
Algeria planned SOP Aug ’18, Egypt SOP Nov ‘18
To keep April SOP timing a PT Unit must be sourced and delivered to Tunisia for week 6 so that NSC
homologation work can take place
Link to Kick off pack
B02E 21-02
NTCE
New pre-study DCS pre-hearing
Body feedback
DCS hearing [N]
DCS hearing [1]
Colours PCL / PPL
Cost levelling
Intro 21-03 11-04
Sourcing 9 weeks
Actions
Review TCF and respond by January 24th 2018
B02E – H4Dt MT
PT1 Preparation
Draft PT1 Build Plan
Actions
To support PT1 preparation and organise travel to the plant to support the build
NTI
= Q-Base C/M agreed
Total Q-Base ET
100
100 %
(20/20) = Q-Base Completed
Total Q-Base ET
Info
55%
(11/20) -
CUS
= Q-Base C/M agreed
Total Q-Base ET
100
100 %
(12/12) = Q-Base Completed
Total Q-Base ET
Info
25%
(3/12) -
C/M Agreed Under Judg
NTI 20 4
20
Waiting Judg
Approval
Completed
Under C/M
11
0
Completed
Under C/M 3
0
NTI
= Q-Base C/M agreed
Total Q-Base ET
100
36 %
(4/11) = Q-Base Completed
Total Q-Base ET
Info
0%
(0/11) -
CUS
= Q-Base C/M agreed
Total Q-Base ET
100
60 %
(3/5) = Q-Base Completed
Total Q-Base ET
Info
0%
(0/5) -
C/M Agreed Under Judg
NTI 4 4
11
Waiting Judg
Approval
Completed
Under C/M
0
7
Completed
Under C/M 0
2
PROJECT REN
ETRS/DCRS/BOM CHECK /STRS
LATE-NO DATE
NEW-NO DATE
O/S
PROJECT REN
ETRS/DCRS/BOM CHECK/STRS
Weekly hearings meetings are hold for o/s items. Next 19 th January, 2018
PROJECT REN
STRS
Weekly hearings meetings are hold for o/s items. Next 19 th January, 2018
Calsonic parts – Kitada san will have a validation judgement meeting next 19 th January with
Calsonic. After this meeting the supplier will send requested STRS plan.
Eurostyle – VQ1 are chasing supplier to get asap late test result
Maier – VQ1 chased supplier Maier asking for STRS updated with late results. No feedback so far
SMR - VQ1 are chasing supplier to get asap late test result
PROJECT REN
STRS
Weekly hearings meetings are hold for o/s items. Next 19 th January, 2018
Eberspächer parts: confirmation tests (same spec as K9K already validated), no concerns for ET
lot vehicle. Supplier gave priority for tests for H4DT and H5DT with new specification
Defta parts: tests will be finished by 19th January (1 day after PM4)
PROJECT REN
STRS
PROJECT REN
STRS
PROJECT REN
STRS
Weekly hearings meetings are hold for o/s items. Next 19 th January, 2018
Kitada san will have with Calsonic a validation judgement meeting on 19 th January, after this
meeting Calsonic will send requested STRS Plan.
PROJECT REN
STRS
PROJECT REN
STRS
Weekly hearings meetings are hold for o/s items. Next 19 th January, 2018
Kitada san will have with Calsonic a validation judgement meeting on 19 th January, after this
meeting Calsonic will send requested STRS Plan.
PROJECT REN
PROJECT REN
PROJECT REN
Completed
PROJECT REN
PROJECT REN
Link:
O:\B02E\Attendance Plan Flins (All Build Events & Activities)
PMD-18-0011 B02E H4Bt, BR10 & K9K Elongation ET3 DETT was issued 10-Jan
Feedback Deadline: 23/01
PMD-18-0016 B02E B02E Minor Change LC-BCS Cost Reduction Study Phase 1
Feedback Deadline: 28/01
Richard Wakefield
MANAGER
Jorge Jordan
SE
Alejandro CarloMagno
Florian Domenech ELONGATION (Dec’17)
E SUPPORT E
LE0.5, H4Dt MT+CVT
E-POWER, “Midnight Edition”
Please find below a list of weekly meetings for B02E which PMD Run.
This will be kept in the Appendix of the REN file for reference