S/4HANA
Enterprise Management 1610
13th January 2017
http://ibm.biz/S4H_Learn1610
IBM Proprietary | © 2017 IBM Corporation 1
Your presenters
Devraj Bardhan
Senior Enterprise Architect SAP S/4HANA
Global Business Services
devraj.bardhan@de.ibm.com
@devbard (Twitter)
Pradeep Santara
SAP SCM PP Consultant
Global Business Services
psantara@in.ibm.com
Kaushik Saha
Consultant - PP, PP-PI, QM (ECC
and S/4 HANA 1610)
Global Business Services
kausaha3@in.ibm.com
IBM
IBM Proprietary
Proprietary || ©
© 2017
2017 IBM
IBM Corporation
Corporation 2
S/4HANA Manufacturing—New Functions and Innovations: Agenda
Overview
User Experience
References
Reporting
Financial Control
CIF
OData
Quality Issues Production Shop Floor
Live cache
CIF
Available to Promise Warehousing
PPDS
Demand Planning
BAPI
Solution Capabilities:
Production Basic Production Basic Sub- Basic External Repetitive Kanban & Jit Quality Quality
Processing Quality Inspection
Control Execution contracting Processing Manufacturing Engineering Improvement
Real-time alerts Benefit from single Manage the Integrate external Benefit from a Run your Integrated and Perform quality Increase your
based on material master subcontracting workforce into simplified production in many simplified solution inspections quality results to
production maintenance for process from Production processing in different flavors to combining QM providing inspection new levels with
bottlenecks, such ERP and SCM planning to Execution, manage repetitive support Kanban and QIM results to enable better planning,
as time or relevant materials execution and time, and material scenarios with and Just-in-time capabilities timely informed defection recording
component delays Synchronous monitoring and handovers mass processing sequencing for with new UX for release decisions and a flexible and
and resource commit, consistent integration with and streamlined Inbound and q-technicians, q- and therefore harmonized action
bottlenecks data your Business financial controls in Outbound engineers, q- support ensuring management, all
Immediate error Network periodic actions planners, q- product compliance supporting
handling managers, q- and quality standardized
auditors, and requirements complaint
calibration process
Innovation and Highlights: technicians
Monitor Production Orders in an intuitive Cockpit Analyze and manage scrap during production Track Quality inspections intuitively
1. Lot Size data in MRP1 4. Repetitive manufacturing /assembly /deployment strategy tab of MRP4
Unit of Measure Group Action console
Fair share rule
Push distribution
Deployment horizon
2. Procurement in MRP2
Quota arr. Usage (MARC-USEQU)
Increased production throughput and reduced Capacity utilization of resources can be monitored Optimize the results of your Material
production costs leveraging finite capacity planning using this app. Production Planners can add the Requirements Planning (MRP) by creating
embedded in S/4HANA. One MRP plans area of responsibility to plants in which they want collective orders for material shortages.
everything: create finite production plan according to monitor the capacity.
to the available capacity situation and schedule
Optimize and plan the resource schedule and Use S/4HANA to optimize PO’s for your
available resources and generate production plan to schedule in seconds!
the precision of seconds. the order dates and times in detail by taking the
resource and component availability into Considers capacities on supplier side to
account harmonize own requirements against supplier
Access SAP Fiori App for Production
Plan critical products, such as products with constraints
Scheduling Board as web based graphical
long replenishment lead times or products that Identify the best vendor and optimize a
scheduling tool
are produced with bottleneck resources collective PO against your schedules and
Customize the web-based graphical scheduling supplier capacities
tool for production planning and detailed Evaluation profile and horizon based on the
scheduling according to various industry needs customization with Utilization Chart based on
daily buckets
Master Data
Common
SAP Advanced Planning and Planning
Optimization – planning and Live cache SAP S/4HANA and
detailed scheduling detailed
scheduling
CIF
CIF
ERP Database
PPDS functionality gets co-deployed on the same system utilizing
one HANA database instance
Integration and synchronization efforts for material master and work
center resource is not required
Constraint based planning, using various heuristics and optimizers
Load, Replicate, Sync & Update of by bringing PP/DS on SAP S/4HANA,
Master, Planning & Transactional Data Reducing integration efforts and allowing seamless master data & UI
harmonization
Interactive
Demand MRP Run+ Release to Production Monitor and
Planning
Entry Unconstrained Planning Production Execution Control
Constrained
Key Benefits Comprehensive Plan to produce in a single system at a low cost Simple and seamless integration
Just one system to manage, less time to manage, back-up and administration Easy monitoring and administration
Integrated Materials requirement planning.
3. Transactional
Manage Production Orders or Process Orders UPDATE
Monitor Production Orders or Process Orders UPDATE
Schedule Order Conversion Runs
Schedule Order Release Run UPDATE
Value Proposition:
SAP MRP Analysis–comprehensive analytic and decision support
Capability:
Show disruptions in the material flow with filters by segment and material
Comprehensive impact analysis and solution proposals
Role-based KPI driven entry
Available on any device, easy to personalize
Proposals for shortage resolution in Manage Material Coverage App
Value Proposition:
Reduced transportation costs: Availability is balanced and
means of transport is fully utilized
Capability:
SAP Fiori application for material planner to identify all
materials to be ordered today or in the near future
All materials from one vendor are ordered together
Value Proposition:
Increased production throughput leveraging finite capacity
planning embedded in SAP S/4HANA DS Board
Reduced system landscape complexity
Reduced order cycle time
Reduced planning effort
Minimized shortage situations
Reduced production costs
Capability:
Create finite production plan according to the available
capacity situation
Schedule available resources and generate operational
production plan
SAP Fiori-based Gantt chart to for interactive scheduling
Value Proposition:
Real time information about the current situation in the
production supervisor’s area of responsibility
Early detection of deviations from the plan enabling him to
take immediate action
Capability:
Monitor production orders and production operations in the
area of responsibility
Select, sort, filter and save tailored variants for the SAP
Fiori launch pad, evaluating the production situation in real
time
Drill down to details and adjust when needed
Access related apps and transactions, for example in PP,
SAP MRP, and quality management
Value Proposition:
Enhanced efficiency in quality inspection
execution (results recording)
Capability:
Different work lists (inspections lots,
inspection operations, samples)
Quantitative or qualitative characteristics.
Relevant objects
Inspection lot
Inspection operation
Inspection characteristic
S/4HANA
Enterprise Management 1610
IBM
IBM Proprietary
Proprietary || ©
© 2017
2017 IBM
IBM Corporation
Corporation 19
Learning Hub Courses on Sales
A sandbox / early trial landscape is available to provide an opportunity for a hands-on experience. The sandbox/early trial environment:
Helps you to explore the innovations delivered with SAP S/4HANA 1610
Acts as a playground to experience the 1610 release
Comes preconfigured with a set of logistics, finance, and analytics scenarios
Provides users with full authorizations to configure and create scenarios, as well as configure the Fiori Launchpad
Registrations are due one week in advance (open up to 16:00 CET on the preceding Thursday) to be able to access the following week (as of Monday
morning). Details on how to access will be sent out through email after registration. The landscape will be refreshed on a weekly basis.
You need to request your ID every week if you want to continue using the sandbox early trial for longer than one week.
S/4HANA Overview S/4HANA Business Scope Best Practice Scope S4HANA Product Scope Innovation Key Use Cases
Join the S4HANA Community on SCN Use Case Blog on SCN S/4HANA Cookbook SAP S/4HANA Road Map