Sunteți pe pagina 1din 38

CIVIL SECTION

JOBS CARRIED OUT


YEAR 2002-03

1
HIGHLIGHTS-CIVIL SECTION
2002-2003
New construction work:
1. Construction of salt saturators cum silo.
2. 11 Kv.Switch gear room in ‘D’ G.T.yard.
3. RFO u/g tank with unloading bay.

2
HIGHLIGHTS-CIVIL SECTION
2002-2003

MAJOR JOBS CARRIED OUT:


1.Epoxy lining in ‘E’stn. N-pits & effluent catch
pits.
2.Resurfacing of asphalt road by paver machine.
3.C1/C2 Tippler load line realigning & replacing of
existing sleepers on new RCC base.
4.Inside lining repairing work of ‘D’stn. Chimney.
5.Repairing & strengthening of NDCT,culverts and
bunkers of ‘C’stn.
3
HIGHLIGHTS-CIVIL SECTION
2002-2003
MAJOR JOBS CARRIED OUT:
6.Repairing & strengthening of NDCT,culverts and
bunkers of ‘C’stn.
7.Repairing and strengthening of D/E stn. IDCT.
8.Heat resisting tiles flooring on ‘F’stn.PRDS.
9.Extension of existing condensers foundations by
rebar grouting method.

4
HIGHLIGHTS-CIVIL SECTION
2002-2003

Environment related jobs :


1.Monitoring of SPM at outlets of Ash ponds
discharge within GPCB norms.
2.Construction of percolating wells in place of
abandoned bore wells.
3.Development of gardens at various locations.
4.House keeping.

5
CIVIL SECTION

1. PLANT REQUIREMENT
2. SHUT DOWN
3. SAFETY RELATED
4. HOUSE KEEPING
5. BEAUTIFICATION
6. ENVIORNMENT

6
Plant Requirement

 Construction of Salt saturator cum silo


along with G.I.shed & RCC Road.

7
Plant Requirement

Construction of 11 Kv Switch Gear room.

8
Plant Requirement

Construction of under ground LSHS oil


storage tank with direct unloading bay.

9
Plant Requirement

Extension of existing lifting arrangement


of Main effluent pit and catch pit.

10
Plant Requirement

Epoxy lining including strengthening work


of existing ‘N’pit of ‘E’ stn.

11
Plant Requirement

Replacement of Acid resistance tiles


flooring of D & E stn. Acid storage area.

12
Plant Requirement

Replacing and realigning of existing


C-1/C-2 Tippler load line by new RCC
base.

13
Plant Requirement

Construction of RCC Retaining wall of


Conveyor no.6 in Coal plant area.

14
Plant Requirement

Heat resisting tiles flooring on ‘F’ stn.


PRDS.

15
Plant Requirement

Modification of existing Fan deck


foundation of ‘E’stn. IDCT.
Repairing and strengthening of D/E stn.
IDCT.
Replacement of metal from transformer
plinths.
Fixing of guide rollers for spillover plate
of C-2 tippler by chemical anchors.
16
Plant Requirement

17
Plant Requirement

 Renovation work in training center.


 Construction of RCC road near new salt saturator
cum silo.
 RCC flooring work near fire station,’D’stn.
Canteen,’E’stn.’N’pit.
 IPS flooring work on terrace of main canteen.
 Replacement of existing flooring by antiskid
ceramic tiles flooring.

18
Plant Requirement

19
Plant Requirement

20
Plant Requirement

 Chemical water proofing work in plant and


colony.
 Replacement of existing corroded Ventilators of
‘C’stn.Turbine house.
 Replacement of existing RCC structure by
G.I.str.of electrical equip. in 66/132
Kv.switchyards.
 Fixing of pvc shutters for cupboards of
Laboratory and OHU.

21
Plant Requirement

22
Plant Requirement

 Extension of existing RCC foundations of ‘C’


stn. Condensers no.15 &16 by rebar grouting
method.
 Replacement of existing corroded structural
members of Ash pipe line bridge.
 Resurfacing of asphalt road by paver machine in
plant area.
 Evacuation of 27,000 cum. ash from stadium
pond and stilling pond of pond no.1

23
Plant Requirement

24
SHUT DOWN JOBS

 Filling the joint of fire resistant brick lining


inside ‘D’ station RCC Chimney.
 Repairing and strengthening of RCC culvert,
NDCT , bunkers etc. of ‘C’stn.
 Repairing and strengthening of IDCT shells.
 Laying drainage line to minimize the level in
bottom ash hopper trench of ‘F’stn.
 Attending leakages from condenser no.15 pipe at
hot water culvert end of ‘C’stn.

25
SHUT DOWN JOBS

26
SAFETY RELATED

 Replacement of existing damaged trench covers


in D.M.plant,132/66 Kv switch yard and various
locations in plant area.
 Provided nose bar and railing in coal plant
tunnels.
 Repairing incl.providing nose bar in ‘C’stn. stair
cases for bunkers and control room.
 Replacement of Damaged/corroded AC sheets of
Coal junction towers.

27
SAFETY RELATED

28
HOUSE KEEPING

 Paving slab flooring work in RFO,Service tanks


and decanting bay area.
 Paving slab flooring work in colony surrounding
CC&CD type quarters.
 Construction of wall parallel to coal plant.
 Renovation of Toilet blocks at various locations.
 Painting work in Turbine house of all stations.
 Painting work in under ground coal plant tunnel.
 Painting work of RCC Chimney of all stations.
29
HOUSE KEEPING

30
HOUSE KEEPING

31
HOUSE KEEPING

32
BEAUTIFICATION

 Development of gardens near Bore well


no.4,stores yard no.15, M-2 tower,behind ‘C’
switch yard etc.
 Change the direction of coal spillage loading
platform in coal junction towers on main road.
 Painting work of all station buildings.
 Development of gardens in colony.
 Anti termite treatment carried out in all quarters,
buildings at township and also various buildings
in plant area
33
BEAUTIFICATION

34
ENVIRONMENT
Construction of percolating wells at abandoned
bore well no.4,7,15 &16.

35
ENVIRONMENT

Maintaining quality of decanted water from ash


ponds as per norms of GPCB.

36
Year wise cost of civil jobs carried out
without cost of cement, reinforcement
and structural steel.
Sr. Financial year Cost of major civil jobs(Rs in lacs)
No Civil Repairing/ Ash Evacuation
strengthening
1. 1999-2000 130.00 324.00

2. 2000-2001 59.00 424.00

3. 2001-2002 197.00 21.19

4. 2002-2003 206.00 14.92


37