A safe check manual P- ⑩ -21

A
An Page NO
A transportation run
Manual dolly – Two hand push
clas
sific ite
atio
n m 21
An important checkpoint A check method(A standard) Measures, revision
Possibility of fall while loading the
At the time of a
parts / part fall down ※ I teach it to a
walk, it is a cut at
the time of cross- rule violator again
purposes A fall fall de-
ring collides
B. A hand tray for the last dish in a banquet car
it from
Before using a 1. move tray for the last dish in a behind
banquet car; a wheel / a handle I check
Achilles' tendon cut preventive measures.
2. When pile up loads, is careful to the next
points.
I pile it up so that an a. load does not protrude
from a hand tray for the last dish in a banquet
car. I do it to the height that I pile it up, and I see
the front as for the height when I push it of the b. I protrude than chassis width and am The loading of the height that does not show in front of 1m is
load. I pile it up so that c. load depends on a prohibited impossible
hand tray for the last dish in a banquet car
experimentally. When I pile up a thing having
light d. and heavy things at the same time, I load
a heavy thing below. The stability of the load The weight balance of the load
3. When there is the fear that a load is changed
into, take next measures. Prevention of a. fall
Prevention of b. scattering
The hand tray for the last dish in a banquet car
for exclusive use of 4. loads a decided load in a A fall fall A fall fall
decided stacking method.
5. people do not get into a hand tray for the last
dish in a banquet car.
I push the 6. moves tray for the last dish in a
The rising thing of the collapse of cargo is string I pile up the heavy things on the lower berth
banquet car and can go ahead.
credit
7. I arrive and separate a hand tray for the last
dish in a banquet car and do not push it on the
run.
A safe check manual
A
A transportation run
A
clause
Page NO
share Two) pushed by hand chassises
A kind Eyes 22

An important checkpoint A check method(A standard) Measures, revision

Do not you pull two) pushed by hand chassises?


Do not pull the load I have a position (green) decided other For a rule violator
(push the chassis by all means) than a drawer, the position soup stock of I teach it with the local goods
the chassis by all means and pull it and
Use it;). carry it

Push the pushed by hand chassis in three) passages

At the time of transportation, I move an appointed place

Do you do it?
(I divide it into a walk zone and a passage)

It cuts a foot and an Achilles' tendon in the corner of the chassis!

I hurt a waist!
It does not show the state of the load of the next!

Thre
e)
* Less than chassis .700mm in width : A walk zone
I push and move
※ Chassis 700mm in width

* More than chassis .700mm in width : A I push を and move The following articles are authorization
passage products

※ I walk at the time of the movement and wear it (the guard of the green belt)
It is テプラ on a label

I move along rail side) I display it


1
Revision 08/7/15
A safe check manual P- ⑩ -22 -①
A
An Page NO
clas
sific
A transportation run ite Two) pushed by hand chassises
atio
n m 22 -①
An important checkpoint A check method(A standard) Measures, revision
A viewpoint of the ① I decide the lasting position that I am
check 08/07/15
easy to push by security Green indication 1
Of the handle be sandwiched in,
① The green indication of a lasting position and the prevention stopper can
② It is 100 the interference prevention G possess all regardless of the
② Be sandwiched in between the both ends of stopper diameter φ circular monotonous red
width of the handle
the handle; the installation of the stopper painting in the both ends
1 5R
5R H
③ Of the protection pipe of the Achilles'
tendon
5R
Installation ⑥ 5R
A
④ Installation of the prevention of chassis self-
run such as hammerlocks ③ An Achilles' tendon protection pipe ⑤ H: Center of gravity height
Clearance from a floor aspect is 50mm It is =<1. 5
⑤ The wheel pace that considered a load A: Wheel minimum pace
painted application red by a thing of ... 250mm I refer to internal regulations
10-42 about the production
⑥ R collecting which is more than 5R for all
the section parts ⑦
⑦ The pasting up of the inspection ⑧
authorization label NO

Authorizati I refer to internal regulations


⑧ Indication of the chassis management NO ⑩ - 0-1 about the
on product
authorization
A manager

The H date

④ At the position that does not project in the free


wheel side

The disaster that


A past disaster example
can happen A bone
fracture &
It is pushed by hand with a palette pillar A carrier is pushed by hand any place other than an contusion
appointment place
A safe check manual 1
Revision
P- ⑩ -22 -②
08/7/15

A
An Page NO
clas
sific
A transportation run ite Two) pushed by hand chassises
atio
n m 22 -②
An important checkpoint A check method(A standard) Measures, revision
Of a process, the pushed by hand
chassis 08/07/15 stipulations
The security of the passage

By the change of the stop position of


plural carriers chassis including it in
the process, chassis case substitute
passage width obstructs unevenness,
standard work. There is not the
runover of the chassis and checks
300 300
whether chassises are always put
forth routinely in a division

A B

B: If there is it in divisions, I manage the parting of the passage


side in particular to be able to absolutely secure width
C
C: I put the stop mark of the hammerlock in a floor aspect,
and chassises are always stopped at the same position.

A past disaster example A contusion


Unevenness passage width becomes narrow, and
I have it any place other than the position that
was decided to control it, and a chassis position
catches a finger in divisions
A safe check manual P- ⑩ - 22-2-1
A Page NO
clas
sific
A transportation run
An
ite The security of two) ユニエレカ X chassis
atio
n m
connections 22-2-1
An important checkpoint A check method(A standard) Measures
Basic thorough safe work at the time of the chassis connection
In three) エレカ X chassises be A malfunction part
sandwiched in, and do not work? The place that must not
last
Is not there the defectiveness chassis?

Red part
(1) An A regular ① I repair it
example connection ② I send it on
I raise a circle link (a stopper) repair
The place that may
① last
(引棒)

《A disaster ③
example》 I lower it I pull a chassis slowly
② After raising the note stopper by all means
I draw it having 引棒 (a connection
department) of the chassis and smash
the right first finger. (2) An
example An example
I raise a circle link (a stopper) of two)
I pull a chassis slowly
① ②
Adjus
tment

The increase with the note foot


prohibits it
Be
sandwiche
d in
(I repair the thing which fell down of 引棒.)
I send it on repair.
I violated a rule ③ I lower it
A safe check manual Revision: H12. 6
H15. 6. 11 P- ⑩ - 22-2-2
Page NO
A
clas
sific
A transportation run
An
ite
I set a limit to two) ユニエレカ, chassis
atio
n m traction 22-2-2
An important checkpoint A check method(A standard) Measures
【Traction number and traction length】
① To a rule violator I teach
it again immediately (I
* Do not you pull number more ① A pushed by hand chassis Less than 5
teach it with the local goods)
② Chola 給台車 Less than 9m
than a standard?
Less than 9m
③ An exclusive palette chassis
* Does it stop surely once at ② Of the connection
(but, chassis 1. in width) More than 5m to three of them)
department, traction
the stop point? ④ Fr floor / a Rr フロアーアッシー chassis department Malfunction
特採規定許可 such as the abrasion At
* Is KY at the time of the Less than 4, less than 11m
the time of the discovery
section part run good? exchange again は repair
enforcement (the abrasion,
less than 15%) ⑩Cf. -45)
※ Only a fruit runs the security of the chassis
* When they turn at the section, do even 10km/h become the structure that does not turn over?
(But the run speed is equal to or less than 10km/h)
* Do you do safety measures so that a work during the run does not drop? (Hook shape, an
anti-wind measure)
※ The safe run of Fr floor / the Rr フロアーアッシー chassis
* It is less than 5km/h at the time of the indoor run. (Safe knowledge card AB-1)
* Two connections of the large-sized chassis are as follows
* I gain conducting wire in the danger But it is assumed that I am equal to or less than 5km/h in speed
when I pull it more than three of them out of necessity.
points (a corner)
* I install a rotary
Secure light in the tractor roof top to press surroundings during the run for attention.
security.

《An accident example》


* I hit a chassis on a panel
without can come to the end of
the section and stop a line. (if
9m
this is a person) )
which is a serious disaster Less than Fr floor / Rr フロアーアッシー chassis 11m
A safe check manual P- ⑩ - 22-3
Page NO
A
clas
sific
A transportation run
An
ite
The handling standard of the chest (only as
atio
n m for the fruit) 22-3
An important checkpoint A check method(A standard) Measures
※ 18 degrees slant is in a state, and do not fall down

① Is the stairhead fixed? ④ I observe the receipts


and payments by one step
(I educate you and am
thorough)
③ Every each step a stopper surely
Do you take it? (Only the
⑤ I pile it up every product
collective stopper is an X) and decide the number of
sheets (the number of the
accommodation) and
manage it and am thorough
④ Do you put by one step in and
out? (Multistage drawer
prohibition) ※ If discover abnormality,
report it to the boss;
measures
An axis

⑤ Do not you acquire too much a A drawer side center of


A chest side center of gravity
work? gravity
《Reference》 Specifications of the
production

Weight(Kg) Chest weight Drawer quantity (mm)


A kind m loadage M at the maximum dimensions A Dimensions B

Chest B 100 160 440 520


Chest A 175 290 420 530
Chest 特 A 140 280 420 520
Tray B 50 85 280 570
Tray 1/2A 80 150 260 600
1/2 tray 特 A 90 160 260 600
A safe check manual P- ⑩ - 22-4
A
An The handling of the chassis(Prevention of Page NO
clas
sific
A transportation run ite
atio
n m fall) 22-4
An important checkpoint A check method(A standard) Measures

① When you perform hand heaping up ① I manage it, and it is


in a line side, do you use an exclusive carried out thorough use of
chassis (with I am sold and come, the exclusive chassis
you)?

② Thorough prevention of
② Do you use a lock pin for prevention fall lock at the time of the
of fall during the transportation? transportation

Land dimensions
I manage it and am for
1,000m/m transportation
for 600m/m

Guidance and
When I perform withdrawals on a chassis for
transportation enforcement
Because there are few lands, there is the fear of
the fall
A safe check manual P- ⑩ - 22-5
A
An Page NO
clas
sific
A transportation run ite An AGC run course
atio
n m 22-5
An important checkpoint A check method(A standard) Measures
※ A safe state on the run course ① I do maintenance and
One) indication / the mark gains it
the revision of indication /
definitely るか ③ Install a signal or a yellow turn light in the mark
the place intersecting a general vehicle

Of two) indication / marks


disappear, and is not there the ② Immediately I
① The run course display tiger sima(Orange) carry out maintenance
unpleasant dirt?
AGC

② I take it more than 400mm between adjacent things

A general vehicle

A walk zone

⑤ If it is necessary, install a catch


fencing, an indication board in the next
point that faced the passage
④ At the crossings No (a)A doorway(建屋, a restroom)
jinrikisha of the reverse
triangle I perform (b)A washhand stand
attention indication (floor (c)Vending machines
aspect indication)
A safe check manual P- ⑩ -23
A
An Page NO
clas
A transportation run
sific
atio
ite Three) bicycles
n m 23
An important checkpoint A check method(A standard) Measures
One) riding into prohibition area
Do you know it? ※ A figure of run root of the body factory bicycle ※ I work on re-guidance
and understanding to a rule
Do you let a notice or all the members understand it? violator
Department internal
regulations
reference

The run route of the body factory bicycle(I am limited


to a permission car in the body part)
Instructions

During lay figure line operation * A ・ ・ cyclist case is possible

* I go down and push the ・ ・ bicycle and pass it


The press whole day

H5 age April 8 for correction 23 H7 age


February 7 addition for correction
A safe check manual P- ⑩ -27
A
An Page NO
clas
A transportation run
sific
atio
ite Three) bicycles
n m 27
An important checkpoint A check method(A standard) Measures

As for two) designators, it is ※ It is checked a run rule understanding degree by a designator! ※ The job that a designator is
uncertain is anti-re-guidance
intellect in a run rule Do not て
いるか, a non-designator get? ※ Decide a designator, and do get; a bicycle check check seat? I measure enforcement.

am similar and do specify a designator?


A reliable knowledge
card AB -3

Carrying task security


knowledge(A bicycle / a hand tray
for the last dish in a banquet car)

A. A bicycle
1. I fix the load in the load-carrying ※ I set a limit to
platform or put it in a basket. ※ loading
2. The load with the flammable
explosiveness does not carry it. 3. The
indoor gets off as much as possible and I
push it and can go ahead. 4. The
doorway with the quick shutter does not
pass it. 5. I soak a headlight at the time
of the run by night.
A safe check manual P- ⑩ -28
A
An Page NO
clas
A transportation run
sific
atio
ite Four) passages, a walk zone
n m 28
An important checkpoint A check method(A standard) Measures

Do not you disappear whether there are one) ※ Disappearing 所, the


passage, the parting of the walk zone? ※ A passage, the confirmation of the walk obi painting enforcement of
parting! the parting.
(Passage, walk zone division color, cf. linewidth chart below)
(fly of sputtering -) )
prohibited in the place
to come to

※ An exception The width of the walk zone


(600mm)I assume it the above.

A table according to a passage / the walk obi color

A division is colored Linewidth


NO Division Remarks
it[Mansel symbol] mm
A Yellow[2 / 5Y8 .0/13(TMS ー 100 The yellow line includes it in passage
passage C10)] width 【TMS - SSO - 0022n】Extract list ー 1
70
1 A walk White [N9 .0 (TMS - 70 70-100mm are possible
zone C38)] 50 Only a person is going to pass it in a
2
A White [N9 .0 (TMS - workshop
3
supportin C38)] Article depots
4 g Yellow[2 / 5Y8 .0/13(TMS -
passage C10)]
A division
A safe check manual P- ⑩ - 28-1
A
An Page NO
clas
sific
A transportation run ite Four) passages, a walk zone
atio
n m 28-1
An important checkpoint A check method(A standard) Measures
A walk zone for exclusive use of the body part / the walker(Green belt)
※ About the body part, the standard of ※ The following, an
the walk zone (green belt), it indication walk zone
establishes a necessary matter. (Green belt)Of the を
One) walk obi (green belt) follows body part is based.
TMSSQK0020N(I show below a main
Of one) parting is about
thing)
to disappear, and is not
① It is assumed that the width is more there a point? It is an
than 800mm. But, in the visit passage, aim in 1/ a half year I
that's all. 1,000mm in width am similar and carry out
② The outsider does office work maintenance.
building - houses with a recommended
passage to commute safely between
Two) is thoughtless; is a
main institutions an implication. revolt with green Do
not make business.
③ Mistake, sliding 踏抜 come and do
the floor aspect to equal がない. When I change three)
walks zone (green belt),
④ I do the side in a head (a floor
aspect, less than 2m in height) so that
contact the safe staff. (a
there are not the risings such as the safe leader meeting)
plumbing or the work. Is similar; and
examination)
A safe check manual P- ⑩ -29
A
An Page NO
clas
A transportation run ite
sific
atio
n m
Four) passages, a walk zone 29
An important checkpoint A check method(A standard) Measures

The break department of two the) ※ The mark of the walk zone, confirmation of the presence!
walks zone, Indicating calls ※ An indicating name, the safe confirmation enforcement ① The mark of the walk
whether there is a mark Or is the check of right and left! zone A few place, the
right and left confirmation good? mark specification of a
An indicating name mark(A hand type) walking obi
② Goods re-guidance local
for safe confirmation non-
enforcer

The enforcement matter


of the walker

The place with the indicating name mark


Stop once
To see the right; and ... / a ditch reed! (An
indicating name)
Factory
To see the left; and ... / a ditch reed! (An indicating appointment
name)

The point that displays an attention last mark(A standard) An attention last mark

* Of the walk zone break off; a point.


Measures of the crossing department * It is comparatively the crossing that it is
(TMS SSO 0020n) easy to look at.
* A point to need attention for to some
extent.
I lecture on a step to promote attention for ※ I decide an indication place like the above in each section and carry it out.
a walker on the break part of the walk zone ※ Marking it does an attention last of the safe confirmation of right and left
and walks.
[example] A last mark, an indication board
of the right and left attention
A safe check manual P- ⑩ - 29-1
A
An Page NO
clas
A transportation run
sific
atio
ite Four) passages, a walk zone
n m Addition: August, 1997 29-1
An important checkpoint A check method(A standard) Measures
The break department of two the) walks zone
A hand type, a last mark installation standard(I install it at the position that can confirm the security) ① A place without the
mark of the walk zone, the
※ The walker is an indicating name: Do you carry out safe confirmation surely? mark specification of a
walking obi
Indicating name or right and left have ① When cross it in the walk zone from the walk zone; both installation ③ A crossing ② Goods re-guidance
good confirming it whether there is local for safe confirmation
the mark non-enforcer
※ A pedestrian crossing ①It is a
vehicle in the walk zone that paralleled a main
A walk
passage The place that crosses the passage zone
② The place that the walk obi of the main
passage is divided into right and left, and cross A
pillar
the vehicle passage
※ It is a stop line a vehicle once ② When I cross it, the walk obi material is a passage-free than a process
① A vehicle is in the main passage side For
the sake of a gantlet A mounting
position
※ A main passage
① Width 4. The passage that there is it more than ① The break part of the walk zone ②The bad place where it is
Sabra in Sabra in expected in a place to leave to the passage which the vehicle passes from a Sabra in
5m, and the traffic of the vehicle and a person of in the in the process A place to leave to the passage which the vehicle passes from the process
the third utilize mainly process process when I am not faced with in the イ) walk zone The place that goes the walk zone by ロ)
standard work across to the other process The place that crosses the other
walks zone from the walk zone in a place without the ハ) pedestrian crossing Since
I cross the ニ) pedestrian crossing

An installation
standard

A hand type A last mark


mark
* An indicating name, it is stopped once A bad place according to one) walker and the companion of the vehicle * The stop is unnecessary once The place that rouses attention in a place appearing in the passage from a process
* The right ditch reed, the left ditch reed * The indicating name is
with possibility except one the) hand type mark (If a prospect is good, I am unnecessary)
(A red light) [example] ・ 1. in height There are obstacles more than 4m unnecessary
It is a place except the hand type mark in the break part of two the) walks zone
* Right and left viewing confirmation
There is a ・ pillar (A yellow on and off light signal)
* A passage turns, and a prospect is bad
As two) sections is installation た place with an indicating confirmation
non-practice prohibited indication board
The pedestrian crossing that crosses three) Maine passages
Yellow The walk obi which faced the doorway to four) outdoors White
A safe check manual P- ⑩ -30
A
An Page NO
clas
A transportation run
sific
atio
ite Four) passages, a walk zone
n m Revision: August, 1997 30
An important checkpoint A check method(A standard) Measures
※ I teach it to safe confirmation
Do you protect whether there is A person and prevention of contact with the vehicle(I keep the non-enforcer with the local
indication of stop "止 Male" in one of security of the walker) ※It is assumed that the main passage is given goods again
three) crossings or the both sides priority to a walker
once? It is a stop mark installation standard one) once(A crossing) 止 まれの indication(A white
line)

※ If have it of manager in charge instructions; ※ In the crossing, one as a general rule; or


I do the following indication in both sides.
"止 Male" It is good without the indication

A main passage
Attention The both sides are manager in
A bad crossing with possibility charge instructions
Floor aspect
indication
* I pull a stop line once I do
letter indication of ・ "止 Male"
The good crossing with possibility is
unnecessary
A walk
greenish
Both
color One 止 Male
sides
止 Male

① The walk obi of the main passage is green ②As for

止 Male
止 Male
the main passage, it is installation in a pedestrian crossing
③The bad crossing with possibility stops once (the indication
installation )④ good crossing of 止 Male with possibility goes slowly)
止 Male 止 Male

An indication
standard I stop once
※ If the tip of a vehicle or the load comes to a stop line, I stop once and control it and confirm it
100-150mm

① I stop once and set hand type, last mark ② It is a stop line once

100-200 From the tip of


a foot
100-200 I empty it as an aim
止 Male 300mm

A good place with


possibility A bad place with A letter 止 Male 止 Male
possibility
Engraved letters More than
size 300mm of the character
I take 800- Chamfering 350mm
A の Gothic
1000 space
I take 100-150 space
A safe check manual P- ⑩ -31
A
An Page NO
clas
sific
A transportation run ite Four) passages, a walk zone
atio
n m 31
An important checkpoint A check method(A standard) Measures

Does not the section part of ※ Do not the things more than 1,400mm in height establish ※ Adapt itself to a
four) crossings establish the it within crossing section part 1,000mm? standard about the
things more than 1,400mm in malfunction point and
(Facilities, model, palette, cf. flow rack chart below) revise it and carry it out
height? (facilities, a model, a
palette) Flow rack) ※ The crossing corner corner part turns on chamfering
more than 350mm as a general rule!

Manager in charge (Cf. chart below example A)


instructions

The handling of the crossing


department

* The corner part (example A part) as a


An
general rule I sentence you to
An
exampl
e
chamfering more than 350mm.
exampl
e
* It is disturbed a field of vision by a slanted
line part (example B part) I do not put るも
のを A note(A chisel between 1400-
3000mm in height)
※ When a field of vision is not removed; a
Chamferin
curved mirror を setting
g
A safe check manual P- ⑩ -32
A
An Page NO
clas
sific
A transportation run ite Four) passages, a walk zone
atio
n m ※ Revision: H12, 8 32
An important checkpoint A check method(A standard) Measures
A walk zone
From five) processes of the traffic of the * From a process In the * A place without the
lift When I appear in many passages, place appearing in the passage indication The place
1. Take I press a walker for attention on where "the catch fencing" is
Hand a model / a last mark or An indicating name mark,
the break part of the walk zone measures. necessary is reviewed
Enforcement.
Is there the catch fencing? The indication such as an indicating name mark / the attention last mark

An attention last mark, ※ The case like the


※ The work that five) -1s are daily 2. A vending machine, the washhand stand from the disaster example
(The part supplying, a notice, a Is there the の passage Establish the space more than 500mm. changes the position of
management board)The contact with indication? the bulletin board.
the で vehicle is dangerous Is not * Is "a catch fencing"
there a point? installed in the bad A
passage (The walk obi is a passage)
point with possibility?
(Right figure 3, Space more than 500mm
reference)
Manager in charge The jigs for vending machine or work checks form the
instructions space where is more more than 500mm than a passage

3. The bad point with possibility installs "a catch fencing".


(I include the jumping out from the facilities interval)
November, 94 revision
A figure of Motomachi factory placement engineering works part
generalization room
An outdoor (a lift) work
P- ⑩ -33 ー A
placement figure
A safe check manual P- ⑩ -33
A
An Page NO
clas
sific
A transportation run ite Five) outdoors runs: Figure of factory placement NO.
atio ①
n m
Waste articles measurement 33
An important checkpoint A check method(A standard) Measures
Does the run passage use a decided
traffic obi?(The traffic zone that I ① It is an invasion from the direction of the arrow.
I teach it to a rule
decided in a section, a group) violator again
② When I go down from a lift, the engine key is enforcement
by OFF, parking brake discount by all means.

Instructions
③ I am careful to steps at measurement slip operation,
receipt time.
④ Match the tilt adjustment (an angle) with a load.
⑤ Two steps of heaping up of the waste articles palette Careful on the spot and
prohibits it. teach it
⑥ It is enough safe confirmation at time to appear in the
road after a measurement.

Measurement ground
invasion mouth
Tilt angle OK
Safe
A thing without the getting
confirmation OK out ハミ

A parking brake
A key Priority Waste articles
palette

I carry out an engine limit in the


measurement ground, a side pull by all
time
I stop at one

means
Measurement ground exit security
confirmation Do not interfere with the
Less than speed 10km / H traffic of other running cars.
A safe check manual P- ⑩ -34
A
An Five) outdoors runs: Page NO
clas
sific
A transportation run ite
Figure of factory placement NO.
atio ②
n m
Waste articles measurement 34
An important checkpoint A check method(A standard) Measures
Does the run passage use a decided
traffic obi? (The traffic zone that I ① I am belonging to it and make a next generation run ease than an entrance I teach it to a
decided in a section, a group) crossing in a scrap yard. rule violator

Instructions
② Match the tilt adjustment (an angle) with a load.
③ The lay figure side: The press side: It is distinction police with a waste articles
case palette.
④ Do not do accumulation of the size difference of the palette.
The guidance of the careful
⑤ It is police to be able to smoothen the receipts and payments of the empty palette. driving

⑥ It is particularly safe confirmation priority in the case of outside order supplier


entrance. Waste articles
abandonment rule
guidance

A runover X

Waste articles palette

Waste articles lift


invasion position
Immediate departure, hitting the brakes, the short turn prohibit An empty palette
it
An empty palette
take-out
Less than speed 10km/ H
A safe check manual P- ⑩ -35
A
An Page NO
clas
sific
A transportation run ite
An FA
Five) outdoors runs: Figure of factory placement NO.
atio
warehouse ③
n m 35
An important checkpoint A check method(A standard) Measures

Does the run passage use a decided


※ Plywood, tough Lloyd board, rubber hoses, welding
I teach it to a
traffic obi? (The traffic zone that I cables, Others transportation
decided in a section, a group) rule violator
① Put a lift in the other vehicles place that does not interfere with the
entrance and exit in the warehouse doorway.
Instructions ② When lengthiness of a reel of film or tape thing gains it, I slip by all
means: Make prevention of fall (ropes). The guidance of the cargo
③ A load service oncoming car on the way is to watch out so that, in addition, work rule
a load is not thrown by a passing car. Careful driving guidance
④ When it depends on loading (bits and bobs), it is use with board Pare, a
box.

Match the tilt adjustment (an angle)


with a load

Prevention
of sliding
※ Immediate departure, hitting the brakes,
The short turn prohibits it

Preventio
n of fall
A board
palette
Less than speed 10km/ H
A safe check manual P- ⑩ -36
A
An Page NO
clas
A transportation run The storage Figure of factory placement NO.
sific
atio
ite Five) outdoors of
runs:
oil storage ④
n m 36
An important checkpoint A check method(A standard) Measures
Does the run passage use a decided ※ Oxygen, gas, Ar, paint, sealants transportation(A drum) I teach it to a
traffic obi? (The traffic zone that I
decided in a section, a group) rule violator
① I employ Falk on a footstool slowly.
② I choose a necessary and carry it to a lift

Instructions
Movement basic for a manual position, the position of the
foot, the lumbago prevention Protect it by all means.
The guidance of the cargo
③ A fall: Prevention of fall is enforcement by all means. work rule

④ (Oxygen, gas, Ar)The cylinder is exclusive palette use. Careful driving guidance

I am to watch out in
lumbago, footing

I match the tilt angle with a load

Exclusive palette
※ Immediate departure, hitting the brakes, は
use
prohibition

In a handling footstool

About 1m in
height

Less than speed 10km/ H


A safe check manual P- ⑩ -37
A
An Page NO
clas
sific
A transportation run ite Five) outdoors
Central joint ridge 1FP
runs: transportation
Figure of factory placement NO.

atio

n m 37
An important checkpoint A check method(A standard) Measures

The traffic zone that the run passage A factory: When I enter and leave from the outside, I stop
was decided Do you use を?
※ once by all means : Duty of the right and left I teach it to a
rule violator
confirmation is enforcement
① It is a stop line at one time Lift progress, a next
I stop by all means and control generation base line
it and confirm it

Run rule safe


guidance
Cargo work run
rule safe guidance

② When I am more than red indication this: I do the next generation with
running

③ I do not do immediate departure, hitting the brakes, the short turn.

An
Instructions the indoor

① It is right and left security confirmation by all means at an X


The traffic obi is a section: A person entrance.
in charge: In a group ② It is lift illumination lighting by all means in the store.
I observe the course that I decided
③ In the police instructions frame of the palette in the store.
④ I prohibit crude handling of the palette.

Less than speed 10km/ H (The hitting the brakes causes collapse of cargo by progress)
A safe check manual P- ⑩ -38
A
An Page NO
clas
A transportation run Figure of factory placement NO.
sific
atio
ite Five) outdoors runs:
2B ⇔ P transportation ⑥
n m 38
An important checkpoint A check method(A standard) Measures
Does the run road use a decided
traffic obi? (The traffic zone that I ① It is right and left confirmation yard careful driving by all I teach it to a
decided in a section, a group) means at a 2B entrance. rule violator
② It is thorough safe confirmation of the palette permutation
time towards other people by a narrow process.

Instructions
③ I prohibit crude handling of the palette.
④ A press doorway is right and left confirmation yard careful
driving by all means. On the spot
Attention
⑤ It is lift illumination lighting by all means in the store.
guidance
⑥ Roads between the 2B ⇔ press always have much quantity
of vehicle traffic It is each rule observance. Cargo work run
rule safe guidance

Progress, the next

※ Immediate departure, hitting the


brakes, the short turn prohibit it
A fall X generation: A base line

Less than speed 10km/ H 〈 red 〉 When I am more than indication this: I do the next generation with
running.
A safe check manual P- ⑩ -39
A
An Page NO
clas
A transportation run A P store mechanic Figure of factory placement NO.
sific
atio
ite Five) outdoors runs: airplane ⑦
n m 39
An important checkpoint A check method(A standard) Measures
Does the run passage use a decided ※ A factory: When I enter and leave from the outside, I
traffic obi? (The traffic zone that I I teach it to a
stop once by all means : Duty of the right
decided in a section, a group) rule violator
and left confirmation is enforcement.
① It is right and left security confirmation by all
means at a store entrance.
② A store is lift illumination lighting.

Instructions
③ Do not overload it with palettes than a standard. A run rule Safe
④ I prohibit crude handling of the palette. guidance
⑤ The attention of the load Tilt Cargo work run
adjustment rule safe guidance
Progress, a next
generation base line

※ When I am more than red indication this, I reverse and run.

An
X

Less than speed 10km/ H ※ I do not do immediate departure, hitting the brakes, the short turn.
A safe check manual P- ⑩ -40
A
An Five) outdoorsCentral
runs:joint ridge elevator use Page NO
clas
sific
A transportation run ite
atio
n m Figure of factory placement NO.
40

An important checkpoint A check method(A standard) Measures
Does the run passage use a decided ※ An elevator runs The elevator operation point
traffic obi? (The traffic zone that I I teach it to a
in it, and is the
decided in a section, a group) rule violator
operation taught?
One) I go slowly more since I enter
the area. Two) I stop on shutter 1

Instructions
meter this side. Three) Of sketch A
call it, and push the button.
Elevator going up and
(Shutter opening) I confirm down
signal blue in four) elevators. Five) I
Safe rule guidance
invade it in an elevator. Six) I lower
the lift fork to a floor aspect. Seven)
It cuts engine key. Eight) I pull a
parking brake. Nine) I push shutter
button 1 in the elevator or 2. Ten) I
confirm that it is signal blue in the
elevator. 11) I appear in a lift run
procedure from an elevator. 12) Of
Reckless
Tilt angle confirmation
Red sketch A is closed, and push the
driving
Progress: A
developing standard button.

When it appears than a 2F elevator, it is lift illumination


A lift: Scratch at a shutter with a mast lighting.

※ A total of 2,000,000 yen repairs


I confirm the state of the load and advance: I
Less than speed 10km/ H