JAKARTA
Rute Perencanaan 5 km
Pelabuhan
Tj. Priok
Pra Konstruksi
Pasca Konstruksi
Bundaran
Konstruksi
HI
Senayan
Elevated Section : 10,5 km
Underground Section : 5 km
Gambaran Umum Proyek
No Stasiun Stationing (km + m) Jarak (m)
STDT DTST
Tunnel Outer Diameter (inner) D=6.65 m (6.05 m) D=10.25 m (9.45 m)
Width of Structure W=15.3 to 21.8 m W=10.25 m
Basic Overburden 6.7 m (1.0D) 10.3 m (1.0D)
No Stasiun Stationing (km + m) Jarak (m)
1 Lebak Bulus 0 + 345
2 Fatmawati 2 + 350 2005
3 Cipete Raya 4 + 180 1830
4 Haji Nawi 5 + 465 1285
5 Blok A 6 + 675 1210
6 Blok M 7 + 940 1265
7 Sisingamangaraja 8 + 570 630
8 Senayan 10 + 100 1530
9 Istora 10 + 930 830
10 Bendungan Hilir 12 + 210 1280
11 Setiabudi 12 + 780 570
12 Dukuh Atas 13 + 915 1135
13 Bundaran HI 14 + 910 995
Location of TBM Launching Shaft
Launching Shaft and Temporary works area at Bunderan HI
8
Location of TBM Launching Shaft
Launching Shaft and Temporary works area at Setiabudi Hilir Sta.
5 vehicle lane
9
Traffic Management at Jl Sudirman
・Reduction of traffic lane will not be required throughout Jl Sudirman.
The construction area for the underground station would be obtained by eliminating
green belts and the temporally deck will be installed to ensure maintaining existing
traffic lanes.
Existing Condition
EL=
CARRIAGE WAY CARRIAGE WAY MEDIAN CARRIAGE WAY CARRIAGE WAY
10.7
37
SIDEWALK SEPARATOR TRANS TRANS SEPARATOR SIDEWALK
JAKARTA JAKARTA
EL=
EL=
13.4
20.7
04
44
Completed Condition
EL=
17.1
13+1
R=700
33
EL=
60
13+1
16.0
13+1
40
98
13+1
12+8
20
12+8
12+9
13+0
HALTE BUSWAY
R=715.1
12+9
00
12+9
13+0
60
SETIA BUDI
12+9
80
13+0
12+9
00
13+0
80
13+0
20
40
60
60
40
EL=
80
20
00
18.4
EL=
86
13.4
35
EL=
EL=
17.5
20.7
51
54 Completed Condition
CARRIAGE WAY CARRIAGE WAY MEDIAN CARRIAGE WAY CARRIAGE WAY
SIDEWALK SEPARATOR SEPARATOR SIDEWALK
Existing Condition
Traffic Management at Jl Sudirman
STAGE1
A
CURVE R~100 M STRIGHT CURVE R=150 M STRIGHT STRIGHT
CURVE R=150 M
STRIGHT CURVE R~100 M
GREEN BELT
A
CROSS SECTION A-A (EXISTING)
GREEN BELT
GREEN BELT
A
Spesifikasi dan jumlah TBM yang digunakan EPB
【Characteristic of EPB】
1. Facility of soil removing is smaller than Slurry Shield.
2. The digging soil can be recycled by improving it.
3. EPB is suited for the most variable kind of soil including soft ground with a low level of
solidity such as alluvial gravel mixed sand, sand, silt, and clay, diluvium deposits and
soft and hard alternating ground.
14
Spesifikasi dan jumlah TBM yang digunakan Slurry
15
8. Spesifikasi dan jumlah TBM yang digunakan
16 © MRTJAKARTA 2011
Rencana relokasi Utilitas di Jalan Sudirman
Sepanjang Area Stasiun Bawah Tanah (Sudirman-Thamrin)
17
Rencana relokasi Utilitas di Jalan Sudirman
18 © MRTJAKARTA 2011
Rencana relokasi Utilitas di Jalan Sudirman - Bus Trans Jakarta
19
Rencana relokasi Utilitas di Jalan Sudirman - Penerangan Jalan Umum
20 © MRTJAKARTA 2011