Report of Bekasi Homebase On Job Training Program

Dimas Helmy
Engineer Trainee
1. Background BBS
2. Goal
3. Bekasi Homebase Location
OUTLINE
4. Investigation day 1-5
5. Conclusion
Background

Expand to
BBS Wellservice
Company
Transport BBS
Transport
 Welltest
and H2S
 Field Service
Detector
 Drill Stem Test
 Coiled Tubing Service
 Cementing Service
The Leading  Slickline/Wireline Expand the
Local bussines with
Wellservice well intervention
Company service
Report Goal

Report Goal :
1. Know more the Slickline Toolbox inventory then the tools for Slickline Operations
2. Know how to Rig Up the surface unit of Slickline Unit
3. Know the Welltesting Unit at the Home Base
4. Know how to Pressure Test the Manifold
Bekasi Home Base Location
Report of Bekasi Homebase OJT

Slickline Unit
Toolbox
inventory and
Unit for
Operations

Rig up Forecast of Slickline


Unit

Report
day 1-5
Welltesting
Introduction

Pressure Test
Manifold
Slick Line unit and Tool Box

Consumable

Non -
Consumable
Slick line unit and Tool box
Slickline unit and tool box unit

Slickline service is a method whereby various well


maintenance, remedial, controls, and safety functions are
accomplished UNDER PRESSURE in the wellbore.

 Checking the production tubing drift


 Checking the build up of wax, scale or wellbore deposits
 Confirming the well depth
 Running and pulling plugs or flow control devices
 Opening and closing SSD or similar completion equipment
 Run Memory gauges
Slick Line unit Rig Up Forecast

 Surface Equipment
1. Winch Unit + Power Pack
2. Pressure Control Equipment
 Down Hole Equipment
1. Tool String
2. Service Tool
Slick Line unit Rig Up Forecast
Slick line Unit
Slick line Unit
Slick line Unit
Slick Line unit and Tool Box
Slick Line unit and Tool Box
Slick Line unit and Tool Box
Slick Line unit and Tool Box
Slick Line unit and Tool Box
Slick Line unit and Tool Box

Basic service tool


Slick Line unit and Tool Box

STANDARD PULLING TOOL


Slick line unit Toolbox
Well Testing

Rig Up Forecast for Slickline Unit (Lubricator,Winch unit - Powerpack)then introduction


18-Sep-19 to Welltest
Welltest Inclass training , Flowhead and Manifold
19-Sep-19 Introduction)
20-Sep-19 Pressure Test of Manifold
Surface Well Testing Rig Up Forecast
Report of Bekasi Homebase OJT

Kinds of accident causing injury


7% 5% Handling
Struck by
13% 36% Trips
19% Others
20% Falls
Machinery
Flow Head Identification

3’/16’ 10k Normally open


Flow Head (psi), 0 – 7500 and Normally
psi Closed
Set Up The Flow Head in the Rig Floor
Flow Head Introduction

6.5 Acme pin

3” 1502 m x
2” 1502 f

3” 1502 f x 3”
1002 m
4.5 If pin
Choke Manifold introduction

Retainer
Seat
Gate Valve
Rubber
Stick Grease
Choke
4/64,8/64,12/
3 1/8 “ 5k Development 24……. Bin
Well Choke
Exploration
3 1/16 “ 10k
Well
Pressure
Gauge,Tem
½ npt, ¾ perature,
Tool
npt Sampling
box
Pint, Barton
recorder

3” 1002 10ft,
5 ft

3” 1002 m x
3” 1502 f
3” 1002
3” 1002 f x 3”
1502 m
Well Testing Introduction

Ideal Pressure build up Pengujian ini dilakukan pada


test berarti uji dilakukan
pada reservoir infinite,  Sumur baru
homogen, reservoir  Sumur-sumur lama yang
isotropi dengan telah ditutup sekian lama
kompresibilitas kecil, hingga dicapai keseragaman
fasa tunggal dengan sifat- tekanan reservoir
sifat fluida konstan.
 Sumur-sumur produktif yang
apabila dilakukan build-up
test, sumur tersebut akan
sangat merugikan

Pressure Build Skin Pressure


Up P* Drawdon
Skin
K
Vp
PI
K
P Reservoir

John Lee, Well Testing


Well Testing Introduction

Modified Flow After


Isochronal Flow (oil)
Flow After Flow hanya dapat memberikan hasil yang baik bila
Test (gas)
dilangsungkan pada reservoir dengan permeabilitas tinggi.
Sedang untuk reservoir dengan permeabilitas rendah, akan
diperlukan waktu yang cukup lama untuk mencapai kondisi
yang setabil, sehingga apabila uji dilakukan pada sumur yang
belum mempunyai fasilitas produksi, jumlah gas yang dibakar
cukup besar
John Lee, Well Testing
Well Testing Introduction
Manifold Pressure Test

1. Check, Recheck and Prepare all the


equiqment for Pressure Test
2. Investigate the condition for safety
3. Make sure the Valve is open or closed
4. Rig up the unit, then put the needle
valve to set the huskel pump and
barton chart reader
5. Don’t forget to always bleed the
pressure to make sure the air is reduce
from the line
6. Pressure test with water, inject it first
in 1000 psi for 5 minutes, then 2500
psi for 10 minutes, 5000 psi for 15
minutes, if no passing or leaking in the
valve it could be said that the valve is
in good condition to work, if no good
make sure the inside valve condition is
in good condition (redress confirmed)
Conclusion

1. The Slickline Toolbox inventory and the tools for Slickline Operations is very important to
every action and operation not just in the field for di base also
2. Rig Up the surface unit of Slickline Unit is the first basic step in the operations, so make sure
in this step the unit is rigged up in a good condition
3. Make sure the Well Testing unit is in good condition, know more the unit especially the base
such as Flowhead and Manifold
4. Pressure Test the Manifold is to make sure the manifold in the good condition
Thanks For Your Attention… 