Case Study :

International Transport Chain

Diana Marin
Nelcy Montes
Reiny Rivera
Selection criteria

Complete the
orders for the
Perform total requested
regression in the 28 days
Define identifying that
container the first order
Choice of time, capacity for must be
route and cost finished delivered on
Choice of time transport of product and June 3, 2018
and the route delivery of the compare with
of raw product. the orders that
material. must be
delivered.
General Information
OBJETIVE: Material delivery for an automotive company.

Initial Production Date


04/06/2018
Johannesburgo
Final Production Date
01/07/2018
Johannesburgo
Total Days 28
Final destination Johannesburg (South Africa)
Production Rate (Cars/day) 200
Total Production 5600
Quality Check Hamburg
Lead time for check:
2
(day for each job)
Parts and Container

Capacity
Volume
Material Location Width Depth Height Price (EXW) Container
(cm3)
85% (Tare)

Light Set Frankfurt 30 18 10 200 0,00486 6657


Fuel Pump Taiwan 30 9 9 500 0,00243 13315
Steering
Pakistan 28 28 10 200 0,00784 4127
Wheel

Width (m) Depth (m) Height (m) Volume (m3) Tare (m3) % Capacity
2,4 6,1 2,6 38 33 85%
Fuel Pump (Tuesday)

Koahsiung Hamburg
Cost
Transport Plant 250
Movement Cost 80 32 Days
Cost por Container 1233 With Quality check
Movement Cost 130
Taiwan (out) 100
Total Cost 1793
Steering Wheel (Saturday)

32 Days
Mundra Hamburg With Quality check

Cost
Transport Plant 250
Movement Cost 100
Mundra-
1084
Hamburg
India (Out) 150
Movement Cost 130
Total Cost 1714 Per Container
Light Set

Frankfurt Hamburg 4 Days


With Quality check

Light Set
Transport Cost Time
500 1
Truck
100 1
Total 600 2
Product Delivery

3 Rout Option:

1. Hamburg-Cape Town-Johannesburg
2. Hamburg- Port Elizabeth – Johannesburg
3. Hamburg-Durban - Johannesburg
Option Evaluation
Option Evaluation

We select the third option, because it has a cost-


time relation that is appropriate for the fulfillment
of the orders. Also taking into account that the day
of departure of fuel pump container is Tuesday
and the Steeriling Wheel is Saturday, to avoid
storage costs the best option is 3.
Container Capacity Final Product

Units by Container
Vol. Container (Tare) = X*(Vol. Fuel Pump + Vol. Steering Wheel
+ Volume Light Set)

Container Capacity= 2138 pieces of each one


to assemble complete vehicles
ORDER DATES
Total Product: 5600 Pieces of each one

1st Order
ORDER DATES
FINAL COST