Documente Academic
Documente Profesional
Documente Cultură
109
Content255 131 0 85 214
207 255 56 99 165 73
246 255 155 190 28 42
PRAGATI
Accent 3 Accent 4 Accent 5 Accent 6 Hyperlink Followed
127 203 179 212 255 255 Hyperlink
175
221 ADVANCE PLANNING AND
215
238
149
197
195
223
242
171
249
213
OPTIMIZATION
Tata Blue 50% 248
229 Tata Blue 25% 180Purple 50 % 214Purple 25 % 241Yellow 50 % 251Yellow 25 %
205 241 213 231 240 251
186 235 SAP (ERP)
154 Implementation
200 Project 241
202
Summary
2
Typical Business Issues
3
Business Issues contd…
4
Agenda
Business Issues in Supply Chain
Summary
5
APO Overview
What is APO ?
• APO – Advanced Planner and Optimizer
6
SAP APO Application
A system capable of
Demand planning having features like advanced statistical tools for
forecasting, promotional planning, product life cycle planning ,
collaborative planning and management by exception.
Optimized design of supply chain network.
Planning for supply network components like Distribution centers,
Manufacturing plants, C&F agents, suppliers& vendors considering
constraints. Dynamically match supply & demand
Perform what if analysis.
Optimized Planning & Scheduling of production facilities taking into
account of the availability of parameters like resource capacity and
component material etc.
Carry out Order Fulfillment though location and product substitution.
7
SAP APO Components
Demand Planning
Demand Planning is used in the creation of forecast towards
generation of a Demand Plan
Interactive Demand Planning is used to provide an user interface to
access/edit and manage data towards creation of a demand plan
through use of planning book
Other functionalities include Statistical Forecasting, Lifecycle,
Promotion Planning and Collaborative Planning.
Supply Network Planning
Supply Network Planning is used to create a tactical sourcing plan
based on the demand and supply situation
SNP uses the demand plan to determine a supply plan in the short
to medium-term based on constraints and penalties.
A single global consistent model of the supply chain is the key
towards an effective sourcing, production and distribution plan.
8
SAP APO Components
9
SAP APO Components
Global Availability to Promise
Enhancement of basic ATP functionality in ECC to include Capable-
to-Promise (CTP), Multi-level ATP, Rules-based ATP, Correlation
Calculation
CTP and Multilevel ATP check calls PP/DS to cover the
requirement, while in Rules-based ATP check, substitutions can
be checked to confirm the requirement based on pre-defined rules
Transportation Planning / Vehicle Scheduling
Component to plan and optimize shipments for orders and
deliveries.
Tightly integrated with SAP ECC Logistics Execution, SAP BW to
evaluate transportation management process and SAP Event
Management to monitor transportation execution.
Optimization tool available assigning orders to vehicles in a cost-
effective manner considering hard and soft constraints.
10
Agenda
Business Issues in Supply Chain
Summary
11
SAP APO Planning Capabilities
Strategic
Demand Planning Long-term
Tactical
Supply Network Planning Medium to Long-term
12
Typical Demand Planning Process
6. Review
7. Incorporate Transfer to ECC
Forecast with
Marketing Demand
Marketing
Input Management
(SKU Level)
1. Set-up
2. Evaluate 3. Generate 8. Consolidate 9. Hold Consensus Unconstrained
and
Demand Statistical & Distribute Demand Planning Demand
Maintain DP
History Forecast Demand Plan Meeting Plan
Structure
14. Manage
Weekly/Daily Exceptions
13
Typical Supply Planning Process
1. Set-up
2. Generate 10. Convert
and 8. Production 9. Transfer Orders
Supply Plan to Purchase Reqs.
Maintain SNP Planning (PPDS) to OLTP system
match Forecast to Purchase Orders
Structure
14. Execution of
Production Orders
Monthly / Weekly in OLTP system
Weekly/Daily
14
SAP APO with SAP ECC
SAPECC
ECC SAP APO
APO SAP
SAP BW
BW
Customer
Production
Orders Planning and
Detailed Supply Key
Production Global
Scheduling Network Performance
Control ATP
Planning Indicators
Inventory ( KPIs )
Management TP / VS
Transportation
Processing Collaboration & Optimization
15
Agenda
Business Issues in Supply Chain
Summary
16
Complete SAP SCM Solution
Measure
Supply Chain Performance Management
Plan
Customer
Customer
Vendor
Dyn. Supply Chain Cooperation
Partner
Monitor
17
Training Structure
Introduction SAP & BW
to SAP and Basic PC Detailed
Literacy Navigation Role Specific Learner
Business Skills Process Transactional Competency
Process Training Training
Training Training Assessment
overview (as required)
(e-learning)
18
Systems Landscape
Legacy ERP
& APO
7 6
SUMI
9
Demand & Supply Plans
Transaction
RS Stock
8
Distribution
s
1 SAP 4
Historical Data
2 Forecasting
•Plant •Location
•Material •Product
Master Data: Periodic (Daily •Contract/ Info CIF •Transportation
Record Lane
Background Job) •Work Center
Periodic •Resource
•Routing & BOM Integration •Production Data
Structure
(Prod. Version) model •Product &
•Product &
Customer Customer
Hierarchy Hierarchy
ECC APO
ECC Transaction APO Transaction
Data Data
•Storage Location •Storage Location
Stocks/Intransit Stocks/Intransit
Stocks CIF Stocks
•Sales Order
Transactional Data: Real-Time •Process Order Real-Time •Sales Order
•Process Order
•Purchase Integration •Purchase
Requisitions
•Purchase Orders
model Requisitions
•Purchase Orders
•Planned Orders •Planned Orders
•Sales History* •Sales History*
* Sales History is transferred from ECC to BW & then to APO every week & not on real time basis
DP Process
Set-up DP master data
(mainly Characteristic Value Combinations [CVCs] for new products)
Generate Proportional Factors (where the disaggregation values used to break higher
level forecast down to the lowest level are updated)
automated
Capture Events
21
DP Process (continued)
Release AUD & Split Total Demand to SNP, BW, SUMI , ECC
automated
(Weekly on Friday night)
22
APO DP Terminology
InfoCube
Data storage for historical information used for forecasting or to store planning results.
Characteristics
are the objects by which you plan, aggregate, disaggregate and report on business data.
Key Figure
is a numerical value that is either a quantity or a monetary amount.
Planning Book
defines the content and layout of the interactive planning screen. It enables you to integrate
people from different departments into the forecasting process.
Macro
user-defined formulas that can be executed within the grid of a planning book. It provides
23
APO DP Terminology
Planning Area
defines the time bucket in which data based on a given planning area is saved in DP or
SNP
Select Variant / Profile
Characteristics
Key Figures
26
Key Information
Planning Object Structure
Planning Object Structure stores the Characteristic Value Combinations (CVC’s) for
demand planning defining the characteristics for the planning areas.
Characteristic are objects by which you aggregate, disaggregate and evaluate
business data.
The Planning Object Structure is divided into three dimensions namely:
• Product Dimension.
• Customer Dimension
• Location Dimension
Product Type and Country has been defined as a Navigation Attributes and these can
act like characteristics but are not a part of the data tables. For Example in addition to
the product number we need what its color and as such color further describes a
product number.
27
27
DP Planning Levels - Product
C2 D01146 EGYPT
C3 D01146 EGYPT
29
Planning Object Structure – POS 1
Characteristics
Product &
Customer
Related Only
30
Planning Object Structure – POS 2
Characteristics:
Product &
Location Related
Only
31
Planning Object Structure – POS 3
Characteristics:
Product, Customer
& Location Related
32
Key Information
Planning Area
A Planning Area is the central data structure of Demand Planning and groups the
parameters that define the scope of the planning activities. The planning area
determines where and how the planning results are to be stored in respect to live
Cache.
There would be one planning area for demand planning purpose for the whole region to
allow displaying and managing planning data across countries including all necessary
key figures to support the demand planning processes such as baseline generation and
event forecasting.
33
33
Planning Area 1
34
Planning Area 2
35
Planning Area 3
36
Maintain Master Data and Planning Parameters
• Planning Books are planning tables in which users display and change data interactively. It is
based on a planning area. Planning Books are common for all countries. They will be defined
separately for each process (like Baseline and Event Forecasting) and in some cases for
different users (demand planner, category and customer manager) due to the fact that different
users must have authorization to different books. In a data view you choose your planning
books and planning views. For e.g. Data View “Add Incremental Event Volume-Demand
Planner” or “ Add Incremental Event Volume-Category
• Key Figures
• Characteristics
• Macros
38
38
Maintain Master Data and Planning Parameters
39
Maintain Master Data and Planning Parameters
• Forecasting Profiles will determine how the statistical forecast for a CVC will be calculated. It
contains forecast parameters like forecast model, horizon, forecast and history key figures etc.
The regional defaults for statistical models are:
• Linear Regression
• Seasonal Linear Regression
• There are two key figures to store system generated baseline: ‘Stat Forecast 1’ and ‘Stat
Forecast 2.’ Stat Forecast 1 can be either Linear Regression or Seasonal Linear Regression.
For Stat Forecast 2, any model can be selected.
• The criteria for measuring forecast error is set to “Mean Absolute Percentage Error (MAPE) as
the regional default for statistical model performance measure.
40
40
Forecasting Profiles
41
Maintain Master Data and Planning Parameters
• Selection Profile defines the set of CVCs assigned to a user for demand planning purposes. It
is a combination of characteristic values used for selecting data in planning books. Sales
Organization will be mandatory at the selection screen.
• There will not be any fixed selection profiles. Demand Planners need to set selection profiles
for their product range i.e. product and customer groups for which they are responsible.
• Regional naming standard has been defined which must be followed by demand planners.
42
42
Maintain Master Data and Planning Parameters
43
Maintain Master Data and Planning Parameters
• Like Profile allows to create demand forecast of a product using the historical input data of a
product or products whose demand behavior is the same or similar. The Like Profile can be
used for New Products or for products with insufficient historical data.
• Phase In Profile is used to represent the product during the launch or phase in stage. A phase
in profile changes in demand history or demand forecast of a product by a given percentage
during a specific period. The aim is to have the forecast mimic the upward sales curve that you
expect the product to display during the phase in stage.
• Phase Out Profile represents the product during the phase out or discontinuation stage. A
phase out profile changes in demand history or demand forecast of a product by a given
percentage during a specific period. The aim is to have the forecast mimic the downward sales
curve that you expect the product to display during the phase out stage.
44
44
Maintain Master Data and Planning Parameters
Roles
Who
Demand Planner
When
Before Executing the Forecast Run.
45
45
Rules & Guidelines
Standard rules and guidelines related to manage Maintain Master Data and
Planning Parameters are recommended for proper control and management of
data and processes.
Rules
The Obsolete Characteristics are deleted by the Help Desk to ensure no performance
issues.
Maintenance of Selection Profile and following standard naming convention ensuring
traceability while loading selection profile
Guidelines
Cleaning up of history data to get a good quality baseline forecast.
Maintenance of forecast profiles as per forecast methods and parameters
recommended.
46
46
System Demonstration & Hands-On Practice
A system demonstration will be performed for all
the transactions listed below, followed by a
hands-on practice of the transactions. A system
demonstration on how create Maintain Master
Data and Planning Parameters will be conducted.
47
47
Key Learning Points
This is a summary of the key learning points of this training session.
o The Characteristic Value Combinations (CVC’s) are available in the
Planning Object Structure and are Master Data for Demand Planning.
o The Planning Area includes all the necessary key figures to support
the demand planning processes.
48
48
How to Log on ?
49
Standard Menu
50
SAP Overview
SAP ECC
SAP ECC is a client server model, using 3-tiered architecture. The three layers are:
Presentation Layer- Presentation Layer allows user to interact with the system. eg.- SAP GUI
Application Layer-In this layer business logic is executed. The application layer can be installed
on one machine, or it can be distributed among more than one system.
Database layer- The database layer holds the data.SAP supports any RDBMS. The database
layer must be installed on one machine or system.
51
Glossary of terms
SAP ECC (Enterprise Core Component) – SAP’s main transactional processing system.
Formerly called SAP ECC and SAP ERP.
SAP APO (Advanced Planner & Optimizer) – SAP’s planning module
SAP BW (Business Warehouse) – SAP’s data warehouse
SUMI (Sourcing Unit Managed Inventory) – Unilever’s 3rd party, web-based, regional sourcing
management tool
BPCS (Business Planning and Control System) – Legacy transaction processing system or
ERP used in most of Asia
SAP ICH (Inventory Collaboration Hub), also called SAP SNC – SAP’s module for customer
collaboration/VMI and supplier collaboration/SMI
SAP SCM (Supply Chain Management) – group of SAP modules that includes APO and ICH,
etc.
SAP MDM (Master Data Management) – SAP’s module for managing single version of Master
Data across multiple systems
SAP BI-IP (Business Intelligence-Integrated Planning) – SAP’s module for Financial Planning.
Formerly called SAP SEM.
CIF (Core Interface Function) – SAP native integration tool used to transfer data between
SAP’s modules such as APO with ECC and ECC with BW and APO with BW
52
Questions & Answers
Questions…
53