Team Members:
G. Suresh Kumar– General Manager (Mechanical)
Heera Kumar – General Manager (Electrical)
SC Samantaray- DGM (Technical Service & WCM)
RDCW AT A GLANCE
Aditya Cement
Bulk Terminals 05
Vikram
Cement West Bengal Cement Works
UNIT VISION
TO BE RECOGNIZED AS THE “MOST INNOVATIVE COMPANY” IN MEETING
THE CUSTOMER REQUIREMENTS,USE OF RENEWABLE ENERGY &
CONSERVING RESOURCES BY THE YEAR 2015.
UNIT MISSION
4
Management System - Certification
Platinum Award
3250 TPD
+ (Brown Field)
2012-13
Upgraded
Bronze Award 2800 TPD
2002-04
Instituted WCM
Upgraded
2400 TPD 2001 – 02
Installed
1800 TPD capacity
2000 - 01
Capacity 1998
CEMENT MANUFACTURING PROCESS
Plant Unique Features
Energy efficient Roller Energy efficient single drive Micro processor based
ball mill for cement grinding Electronic Packer Captive Thermal Power plant
Press for Pre-Grinding
Cement being an energy intensive sector, has been considered under the PAT
scheme to enhance its energy efficiency.
700 668.97
Better
650
600
Base Line Target 2012-13 2013-14 2014-15
*After Normalization
Specific Heat Consumption - kcal / kg clinker
739
743 734
750
700 665
CII National
650 Better
Benchmark
12-13
600 13-14
550
500
CII National 12-13 13-14 14-15
Benchmark
12-13 – Preheater Upgradation from 4th stage to 5th stage & conventional
cooler replaced by CB cooler thereby reduced 50 kcal/kg clinker .
Specific Power Consumption – kWh/MT Cement
72 72 71
80
60
70
CII National
60
Benchmark
50
12-13
40 Better
30 13-14
20
10 14-15
0
CII National 12-13 13-14 14-15
Benchmark
Flyash %
30
27.79
29
26.81 26.89
28
27
26
Flyash %
25
Better
24
23
22
21
20
12-13 13-14 14-15
Methodology for Identifying Innovative Projects
Innovative Project -1
Objective: To reduce power consumption in PC Firing Blower.
Investment: 36 Lacs
Problem Faced:
High power consumption (65 kW)
High Noise level of existing blower in pyro section is 89 dB.
Lobe element replacement – Every 3 years (Rs 6 Lacs each)
Results:
Industrial waste feeding quantity increased from 50
MT per day to 90 MT per day
Helped to increase the consumption of plastic waste
by 1650 MT per annum.
Enhancement of TPP capacity up to 13 MW
Innovative Project -3
Background : RDCW installed a 12.5 MW captive power plant to cater the power
requirement of cement plant. But due to plant capacity enhancement power
requirement increased up to 14.5 MW which was sourced from EB.
RDCW Team conducted a study along experts to assess the potential of power
generation from TPP. Study report recommended that with minor modification 14
MW can be generated from TPP.
Action Taken:
Fuel Mixed changed (80% Lignite + 20% SA Coal)
Steam pressure reduced from 66 kg/cm2 to 63 kg/cm2 & steam flow increased
from 55 TPH to 60 TPH.
Enhancement of TPP capacity up to 13 MW
Benefits :
Power generation increased up to 13.5 MW
Boiler heat rate reduced from 3490 kcal/kWh to 3470 kcal/kWh
Cost saving: Shifting of 1MW load from EB to TPP will reduce TNEB
consumption 20000 Units/ Day
Net saving is = 20000*2.5 = Rs.50000 Per day
Co-processing of ETP Sludge as an
Alternate Raw Material
Innovative Project -4
Issue – To support sustainable economic growth towards a low carbon future unit
not only focused on AFR but also search for alternate raw material.
The ETP sludge is a hazardous waste material of textile industries. This sludge is
openly dumped which leads to soil, surface water and ground water
contamination.
% on TSR
9.60 9.62
10.00
9.50
9.00
8.34
TSR %
8.50
8.00
7.50
7.00
12-13 13-14 14-15
ENERGY CONSERVATION INITIATIVE
ENERGY SAVING PROJECTS IMPLEMENTED
WITH WITHOUT
PARTICULARS UOM INVESTMENTS INVESTMENTS
12-15 12-15
Total No of Projects
Nos 32 13
implemented
Electrical Savings
Million units 36.97 1.55
achieved
Background: Usually DG set HFO fuel heaters were kept in ON condition to maintain the
temperature for immediate startup of the DG set. These heaters consumed 750 kWh per
day.
Action Taken: To reduce the power consumption, LDO circulation was given to the DG
set in place of HFO circulation. In emergency conditions, DG set can be started initially
with LDO then switched over to HFO in case of continuous operation.
Benefits:
1. Auxiliary consumption reduced by 300 unit per day.
2. DG power cost reduced.
3. Savings /Per Annum: 4.6 lacs
Cooler MFR ID hole modification
AFTER
BEFORE
Benefits:
Benefits:
Savings in unit consumption 10KW*24 = 240 kWh/day
Saving in cost - Rs 3.11 lakhs per annum
Reduction in CO2 = 89 MT per annum
Installation of Energy Efficient Lamps
We replaced HPMV/SV by CFL and LED lamps in plant and Guest house at colony.
Objective: To optimize the operation timing of the air blaster in Pre heater section.
Project Aim : To reduce power consumption.
Action Taken: Modified the program so that whenever the cyclone cone draft
reduce to minimum air blaster will operate.
Benefits:
Reduction in compressor air consumption.
Before Logic modification =6557.35 KW /day
After Logic modification =3945.48 KW /day
Benefits:
1) Renewable form of energy, save huge energy cost and also reduces
carbon foot print on our environment.(Co2 Emission reduced – 6570
Kg/Annum)
2) The maintenance cost to Zero
3) No spares and maintenance
4) Cost Saving Rs 0.095 Lacs /Year
Installation of Turbo Ventilators &
Transparent sheet
Benefits:
Eliminated use of electrical lamps during day time
Cost Saving Rs 5.74 Lacs /Year
ENVIRONMENT
PROJECTS
“As a Group we have always operated and continue to
operate our businesses as Trustees with a deep rooted
obligation to synergise growth with responsibility.”
ECO-Friendly Technological Features
Issue – Ground water with bore well is the only source of water for plant and
colony. Day by day the water table in the vicinity is depleting. In future it may lead
to severe water shortage.
Annual average rain
fall – 627 mm
About 500000m3 of
water is available in
abandoned mines. this
Drip irrigation at Colony & Plant
water started recycling
to power plant after
laying down a pipe line
of 6 km.
On the eve of World Environment Day that fell on June 5, 2015, a Green Walk
has been organised to come to factory and back to colony, thereby avoiding
vehicle usage on that particular day.
Environment Day pledge Green walk from colony Mass tree plantation by
to factory employees
50000
2011-12 2012-13 2013-14 2014-15
45
Reduction in CO2 Emission
kg CO2/MT Cement
610 610
620
560
2011-12 2012-13 2013-14 2014-15
kg CO2/MT Cement
(5*250)
Wind 1854000 7.69 2051093 7.19 1844096 9.78
KW
Solar
photo 100 KW 144000 0.61 144974 0.608 136527 0.548
voltaic
47
INVOLVEMENT OF EMPLOYEES
EXPERT OPTIMISER
49
ENERGY MONITORING & REPORTING SYSTEMS
50
ENERGY MONITORING & REPORTING SYSTEMS
51
INTEGRATED MANAGEMENT SYSTEM CERTIFICATION
ISO : 9001 ISO :14001 ISO :27001 ISO :18001 ISO :50001 2011
CAT2 (Minor) Requirement:- OHSAS Prposed changes to be 03.03.2015 incidence was thoroughly investigated and detailed THE my-sethu system needs coarse correction.
The organization shall establish, implement and maintain a procedure(s) 18001:2007 communicated to safety board . investigation results was submitted to the safety board through incident
for dealing with actual and potential nonconformity(ies) (non-accr.) investigation committee. The format need to revised since our system is
and for taking corrective action and preventive action. The centralised we will send our requisition to our corporate safety board for
procedure(s) shall define requirements for: suitable action
a) identifying and correcting nonconformity(ies) and taking action(s) to
mitigate their OH&S consequences;
Non Conformance:-
For the incident which happened on 03.03.2015, Corrective Actions are
not implemented as per the requirement of the standard.
Evidence: -
(i) Root cause analysis has not been carried out appropriately,
(ii) There is no provision for verification of the effectiveness of the
corrective action in the format for Incident Investigation.
(iii) HIRA has not been reviewed after implementing the corrective
actions.
CAT2 (Minor) Requirement:- OHSAS All the major Change & expasion All the major expanson project EIA assesment is done . How ever same Proactively all the risk and inventory register to be checked before
...For the management of change, the organization shall identify the 18001:2007 project seperate risk assesment was not included in the aspect impact & risk inventory register any new project start up
OH&S hazards and OH&S risks associated with changes in the (non-accr.) wil be done by project cell
organization, the OH&S management system, or its activities, prior to
the introduction of such changes.....
Nonconformance:-
Hazard Identification & Risk Assessment (HIRA) has not been carried for
certain changed or proposed activities before their introduction.
Evidence:-
HIRA has not been carried out for the following:-
(i) New Fly Ash Silo Erection & Commissioning,
(ii) Alternate Limestone Feeding System Erection & Commissioning, and
REPLICATION ARISING OUT OF BEST PRACTICES
THROUGH ASSOCIATES
53
Energy Saving Projects for Next Three Years
FICCI Award received by Mrs. Rajashree Birla Green Award 2012 received by Mr. V Ganesan
from Dr. Man Mohan Singh, Former Honorable from Dr. J. Jayalalithaa, Honorable Chief
Prime Minister of India during the FICCI 80th Minister of Tamilnadu during the award
AGM at New Delhi ceremony in Chennai
AWARDS & ACCOLADES
National Energy Efficient Unit Award by CII (2004 & 2006,2007 , 2008 ,2012 & 2013)
National Excellent Energy Efficient Unit Award by CII – (2009 , 2010 , 2011,2014)
NCCBM Best Electrical Energy Performance Award 2008-09
Frost and Sullivan Green Manufacturing Excellence Award – category - Aspirant
Award (2013), Challenger Award(2014,2015)
Tamil Nadu State Safety Award- Ist Prize under Scheme II (Lowest Weighted Frequency
Rate, Compared with the other Industries.)
Federation of Indian Mineral Industries (FIMI)
It is the small things that make for perfection
And perfection is no small thing
- Shri Aditya Vikram Birla