While the re-construction of a seawall progresses and should be accelerated…

Can we do it with better Integration?


CURRENT | PLANNED ACCESSIBILITY

Sunda Kelapa – Ancol as an


Integrated showcase !?

1 : 20.000
0 200 400 1000 M

Slide
SUNDA KELAPA PORT AREA REDEVELOPMENT
26|02|2019
3
Coastal Flood safety Still
required:
1:1000 norm – LWS 4.8m +
strength and adaptive design
Flood Safety Now Less than 1:10
Polder situation (Macro)

Currently in Pluit Polder and Sentiong?


Future: Pluit Polder and Sentiong?

2 pumps
- Pluit
- Pintu Air Sunda Kelapa

Rivers/drains
- Ciliwung
- Kali Krukut / Muara Angke?
Current Conditions
Wet feet due to seepage, rob Religious / Heritage / Tourism Unclear status of
and/or poor (functioning of) sites in unattractive flooded Defunct polder Coastal Defense
drainage systems and dirty surroundings Upgrade Stage A

Sea wall as a barrier


/ hurdle
CURRENT | CONDITION

1 : 2.500
0 25 50 125 M

Slide

Luar Batang – Kampung Aqurium AREA REDEVELOPMENT 7


Current Dike Setting
Current Dike Setting
Current Dike Setting
Current Dike Setting
Why Showcase of Integrated development approach:

• Speed of implementation flood safety components (faster)


• Dikes and coastal defenses as catalyzer of more live-able areas
• Socio-economic benefits and revenues vs cost balance (integrated)
• Access to additional funding and financing sources
• Stakeholder commitment to development options (DKI, Communities,
PUPR, Major Land Owners)
• Lift on actual development inputs and fund commitments of parties
• Bigger contributions to overall urban and economic development
Objective: value added improvement of
coastal defense upgrade in Sunda Kelapa Area
• Develop flood safety with added value which can be used as an additional financing / funding source to
APBN/APBD and has key stakeholder support
• Added values = additional funds and financing facilities:
• Land development / reclamation = potential revenues for cross subsidization + revitalization of local economies (community
based improvements)
• Use dike development for area upgrade (pro-poor dikes) and tap into funds / financing for slum improvement, social
housing, resilience (climate change)
• Options for social housing and area upgrades
• Options for improving the drainage / sanitation of adjacent areas
• Improvement resilience of exposed communities
• Use coastal defense upgrade for improving tourism / heritage locations and tap into funds for improving tourism facilities
• Apply innovative financing and procurement schemes to the flood safety infrastructure of dikes, flood gates, pumps, canals…

• Can we identify the value added technical integration options?!


• Urban water management and dikes, retention areas and pumps
• Housing and dikes?
• Area upgrade / greenification, environmental upgrades and recreation
• Dikes and heritage / tourism locations
Solve the barrier impact

Components of the ‘wall’

Solve the barrier impact


of the ‘wall’ + friendly
interface with kampung
(pro- poor dike)

Solve the barrier impact


of the ‘wall’ + integrate
design of dike with
kampung container

Drainage, sewerage and


waste solutions

Reservoir retention

Heritage upgrade

Walk bridge crossing

Tourism / leisure zone

Commercial / High end

Residential
$ Stage Potential Money flows
E-A dikes
$ Land and coastal

$
development

$$$

$ Tourism
development
Flood defences Inland space use

Dike Concrete Sheetpile Concrete L-shape

Size: Size: Size:


16

Price: Price: Price:


Key Issues: Urban Kampong
Improvement
WATERFRONT CORRIDOR AND SOCIAL CENTRE

A multi-use sustainable social centre is proposed as one


of the main aspect of the Kampung Improvement Program in
Kampung Luar Batang. The space is proposed to be alocated
adjacent to the dike as a showcase to the community of how
the dike could also functioned as a social space, apart from its
main function as flood protection. The space should
embodies several of public features that was currently lacking
in the kampung, such as children playground, sport area,
small stage for performace or public meeting, etc.
Community involvement in the design process is highly
encourage to capture the needs and aspiration of the
community regarding public facilities that could upgrade their
quality of life. The space should also be design in such a way
so it could be a time-share multi-use facilities.
22|04|2019
WATERFRONT CORRIDOR

Slide
22|04|2019 SUNDA KELAPA PORT AREA DEVELOPMENT 19
WATERFRONT CORRIDOR

THE WATERFRONT CORRIDOR spans along the dike from the


kampung Luar Batang to the north side of the site planning area. The
main idea is to create a walkable public corridor. This public waterfront
corridor should also able to host other activities to promote a more
livable vibrant space (commercial, sport activities, recreation, etc) and
create economic opportunities for the community.
Along the approx 2km corridor, there should be a public hubs
functioned as a transition space to enhance the corridor’s walkability.
Integrated MASTER PLAN
Development
Urban Design
Strategies:
Bayfront Development
Pedestrian and
Bicycle Bridge
Sunda Kelapa

Bicycle Snake, Copenhagen


04 VISIONING MASTER PLAN
Section: Waterfront Commercial
Area
Waterfront Commercial
Development

Kalvebod Waves, Copenhagen

S-ar putea să vă placă și