FORMS
Prepared by: Engr. Victor J. Santos (Engineer III)
DPWH Bureau of Construction
Outline
TOTAL
TOTAL AVE. COMPUTED PAY FINAL
MARK OF GROUND DATE PENETRATION FALL OF FINAL TIP
PENETRATION PENETRATION BEARING LENGTH BUTT
PILE ELEV. (M) DRIVEN FOR LAST 20 RAM (mm) ELEV. (M)
(M) (MM/BLOW) POWER, (KN) L.M. ELEV.(M)
BLOWS (mm)
Sample
Pile No. & Location: Pile Bent # 20-D Weight of Ram: 22.57 KN
Required Bearing Capacity: 344 KN Date Driven: 01-15-03
Cut-Off Elevation: (+) 1.53 m WHERE:
Ground Elevation: (+) 0.53 m Ra. = Bearing Capacity (KN)
MARK GROUND DATE TOTAL TOTAL AVE. FALL OF COMPUTED FINAL TIP PAY TOP OF
PENETRATION BEARING
OF PENETRATION PENETRATION LENGTH PILE
FOR LAST 20 POWER,
PILE ELEV. (M) DRIVEN (M) BLOWS (mm) (MM/BLOW) RAM (mm) (KN) ELEV. (M) L.M. ELEV.(M)
1-A 1.00 10/25/02 17.47 362 18.08 1,600.00 352.50 -16.47 18.00 1.53
1-B 1.00 10/25/02 17.47 336 16.79 1,500.00 346.40 -16.47 18.00 1.53
1-C 1.00 10/25/02 17.47 336 16.79 1,500.00 346.40 -16.47 18.00 1.53
1-D 1.00 10/25/02 17.47 336 16.79 1,500.00 346.40 -16.47 18.00 1.53
Note:
1. Submit driving log sheets for all
driven test piles including pile to n9
support the pile data summary
n8
2. Attach sample computation sheets.
Check the applicability of the
3.
formula. n7
4. n is number of blows per regular
interval, normally every 1.00 m.
n6
n5
n4
n3
n2
n1
NGL
n0
Bored Pile
LOCATION :
BORED PILE LOCATION : BORE HOLE DIAMETER :
BORE HOLE
EXCAVATION OF BORE HOLE DEPTH
Drilling Log
Date Started : DEPTH PER DESIGN :
Date Completed : ACTUAL DEPTH :
STEEL CASING
Programmed Length : SCALE :
Actual Length :
+
1
0
.
type and color of soil 0
.
0
0
0
-
1
0
.
0
-
0
2
0
.
0
-
0
3
0
.
0
-
0
4
0
.
0
PREPARED BY : CHECKED BY : 0
REVIEWED BY : APPROVED :
DEPTH
PILE DEPTH
: ______________________
: ______________________
Pouring Data
CUT-OFF ELEV. : ____________________________ WEATHER : ______________________
THEORITICAL VOL. : ____________________________
ACTUAL VOLUME : ____________________________
TRANSIT TIME WATER WAS TIME OF POURING DEPTH OF HOLE LENGTH OF TREMIE PIPE
MIXER VOLUME (m3) ADDED TO THE REMARKS
NUMBER MIX
STARTED FINISHED DEPTH POURED EMBEDMENT
SUBMITTED BY:
SUBMITTED BY: CHECKED BY: APPROVED BY:
Unit Weight : 10mm = 0.616/m., 12mm = 0.888/m., 16mm = 1.579/m., 20mm = 2.466/m., 25mm = 3.854/m., 28 = 4.833/m., 32mm = 6.313/m., 36mm
TOTAL WEIGHT
= 7.991/m.,
(Contractor
(DPWH Representative) (DPWH Representative)
Representative)
Work Permit No. __________
CONCRETE POURING
(ITEM 405 - STRUCTURAL CONCRETE )
APPROVED/DISAPPROVED: (DPWH)