BRIDGE JOB CONTROL

FORMS
Prepared by: Engr. Victor J. Santos (Engineer III)
DPWH Bureau of Construction
Outline

 Test Pile Data


 Summary of Bearing Pile Data
 Pile Driving Log
 Bored Pile Drilling Log
 Bored Pile Pouring Data
 Bar Cutting List / Diagram
 Pouring Permit
Location: ____________________________ Hammer Used: _______________
Pile No. & Location: ___________________ Weight of Ram: _______________
Required Bearing Capacity: _____________ Date Driven: _________________
Cut-Off Elevation: _____________________ WHERE:

Test Pile Data


Ground Elevation: _____________________ Ra. = Bearing Capacity (KN)
Computed Casting Length after Driving: ___ W = Wt. Of Ram/Hammer (KN)
Pile Tip Elevation after Driving: __________ S = Ave. Height of Penetration (MM)
Type of Test Pile: _____________________ H = Height of Fall of Ram (MM)
Dimension: __________________________ K = Constant: 10 mm
Weight of Pile: ________________________ Wp = Weight of Pile (KN)
FS = Factor of Safety

FORMULA USED: [ 2WH (W)]


Ra. = [ (S+K) (W+Wp)] FS

GROUND TIP NUMBER AVERAGE FALL BEARING


PENETRATION ELEVATION OF BLOWS PENETRATION OF RAM CAPACITY
(M) (M) (MM/BLOW) (MM) (KN)

Recommended Length = ___________________________________________


= _____________________________________________

SUBMITTED BY: CHECKED BY: APPROVED BY ;

______________ __________________ __________________


Project Manager Project Engineer District Engiineer
Contractor DPWH Regional Director
PMO-Project Director
Summary of Bearing Pile Data
SUMMARY OF BEARING PILE DATA

Project Title/Location : ___________________


Type of Pile: ______________
Recorded by: ____________
REQUIRED BEARING POWER TYPE OF FORMULA :
REQUIRED TIP ELEVATION, MIN.
CUT-OFF ELEVATION
CASTING LENGTH OF REGULAR PILE
SIZE OF PILE
LOCATION

TOTAL
TOTAL AVE. COMPUTED PAY FINAL
MARK OF GROUND DATE PENETRATION FALL OF FINAL TIP
PENETRATION PENETRATION BEARING LENGTH BUTT
PILE ELEV. (M) DRIVEN FOR LAST 20 RAM (mm) ELEV. (M)
(M) (MM/BLOW) POWER, (KN) L.M. ELEV.(M)
BLOWS (mm)

SUBMITTED BY: CHECKED BY: APPROVED BY:

___________________ ______________________ _________________________


Project Manager Project Engineer District Engineer
Contractor DPWH Regional Director
PMO-Project Director
TEST PILE DATA

Project: Construction of Mabolo Bridge Province: Camarines Sur


Location: Naga City Hammer Used: M-23

Sample
Pile No. & Location: Pile Bent # 20-D Weight of Ram: 22.57 KN
Required Bearing Capacity: 344 KN Date Driven: 01-15-03
Cut-Off Elevation: (+) 1.53 m WHERE:
Ground Elevation: (+) 0.53 m Ra. = Bearing Capacity (KN)

Test Pile Data


Computed Casting Length after Driving: 19.00 m W = Wt. Of Ram/Hammer (KN)
Pile Tip Elevation after Driving: (-) 16.47 m S = Ave. Height of Penetration (MM)
Type of Test Pile: RC Pile H = Height of Fall of Ram (MM)
Dimension: 0.40m. x 0.40m. x 20.00 m K = Constant: 10 mm
Weight of Pile: 23.357 Kn Wp = Weight of Pile (KN)
FS = Factor of Safety

FORMULA USED: [ 2WH (W)]


Ra. = [ (S+K) (W+Wp)] FS

GROUND TIP NUMBER AVERAGE FALL BEARING


PENETRATION ELEVATION OF BLOWS PENETRATION OF RAM CAPACITY
(M) (M) (MM/BLOW) (MM) (KN)
0.00 0.53
0.30 0.23 0.00 0.00 0.00 0.00
1.20 -0.67 4.00 225.00 500.00 17.00
2.00 -1.47 5.00 160.00 900.00 42.31
3.00 -2.47 6.00 166.67 1,300.00 58.80
4.00 -3.47 14.00 71.43 1,500.00 147.21
5.00 -4.47 18.00 55.56 1,500.00 182.85
6.00 -5.47 23.00 43.48 1,500.00 224.14
7.00 -6.47 21.00 47.62 1,500.00 208.03
8.00 -7.47 18.00 55.56 1,500.00 182.85
9.00 -8.47 15.00 66.67 1,500.00 156.35
10.00 -9.47 14.00 71.43 1,500.00 128.46
11.00 -10.47 16.00 62.50 1,500.00 144.28
12.00 -11.47 19.00 52.63 1,500.00 167.01
13.00 -12.47 28.00 35.71 1,500.00 228.82
14.00 -13.47 32.00 31.25 1,500.00 253.58
15.00 -14.47 45.00 22.22 1,500.00 324.63
16.00 -15.47 48.00 20.83 1,500.00 339.25
17.00 -16.47 50.00 20.00 1,500.00 348.68

Recommended Length = from Elev 1.53 m. to Elev. -16.47 m. plus 1 meter


= 19 meters

SUBMITTED BY: CHECKED BY: APPROVED BY ;

NOEL G. ZAMORA OSCAR C. VILLANUEVA CARLITO L. NACIONAL


Project Manager Project Engineer Engineer V
CIRIACO CORPORATION Project Manager I, BOC PAD-I, Bureau of Construction
Sample Summary of Bearing Pile Data
SUMMARY OF BEARING PILE DATA
Project: Mabulo By-Pass Bridge Naga, City
Type of Pile: H-Pile, 79.02 kg/m
Recorded by: Severino B. Plurad, Jr.

REQUIRED BEARING POWER : 344 KN TYPE OF FORMULA :


REQUIRED TIP ELEVATION : (-) 10.47
CUT-OFF ELEVATION : (+) 1.53
CASTING LENGTH OF THE
12 meters plus 12 meters = 24.00
REGULAR PILE : (2WH) x W x 1
B.P. =
LOCATION : PILE BENT # 1 (S + K) x (W + P) x 4
SIZE OF PILE : 12" x 12" x 12 meters

MARK GROUND DATE TOTAL TOTAL AVE. FALL OF COMPUTED FINAL TIP PAY TOP OF
PENETRATION BEARING
OF PENETRATION PENETRATION LENGTH PILE
FOR LAST 20 POWER,
PILE ELEV. (M) DRIVEN (M) BLOWS (mm) (MM/BLOW) RAM (mm) (KN) ELEV. (M) L.M. ELEV.(M)

1-A 1.00 10/25/02 17.47 362 18.08 1,600.00 352.50 -16.47 18.00 1.53

1-B 1.00 10/25/02 17.47 336 16.79 1,500.00 346.40 -16.47 18.00 1.53

1-C 1.00 10/25/02 17.47 336 16.79 1,500.00 346.40 -16.47 18.00 1.53

1-D 1.00 10/25/02 17.47 336 16.79 1,500.00 346.40 -16.47 18.00 1.53

SUBMITTED BY: CHECKED BY: APPROVED BY:

NOEL G. ZAMORA OSCAR C. VILLANUEVA ORLANDO B. ROCES


Project Manager Project Engineer OIC - Regional Director
CIRIACO CORPORATION Project Manager I, BOC Region V
Pile Driving Log
(Test and Regular Piles)

Pile Driving Log


Project Name/Location :
Pile I.D. :
Hammer used :

Note:
1. Submit driving log sheets for all
driven test piles including pile to n9
support the pile data summary
n8
2. Attach sample computation sheets.
Check the applicability of the
3.
formula. n7
4. n is number of blows per regular
interval, normally every 1.00 m.
n6

n5

n4

n3

n2

n1
NGL

n0

SUBMITTED BY: CHECKED BY: APPROVED BY:

__________________ ___________________ __________________________


Project Manager Project Engineer District Engineer/ Project Director/
Contractor DPWH Regional Director
BORED PILE DRILLING LOG
NAME OF PROJECT :

Bored Pile
LOCATION :
BORED PILE LOCATION : BORE HOLE DIAMETER :

BORE HOLE
EXCAVATION OF BORE HOLE DEPTH

Drilling Log
Date Started : DEPTH PER DESIGN :
Date Completed : ACTUAL DEPTH :
STEEL CASING
Programmed Length : SCALE :
Actual Length :

+
1
0
.
type and color of soil 0
.
0
0
0
-
1
0
.
0
-
0
2
0
.
0
-
0
3
0
.
0
-
0
4
0
.
0
PREPARED BY : CHECKED BY : 0

Materials Engineer Materials Engineer Quantity Engineer


Contractor DPWH DPWH

REVIEWED BY : APPROVED :

Project Engineer District Engineer/


DPWH Regional Director/
PMO-Project Director
Name of Project
Location

Bored Pile BORED PILE LOCATION


BORED PILE DIAMETER
: ____________________________
: ____________________________
BORED PILE POURING DATA

DEPTH
PILE DEPTH
: ______________________
: ______________________

Pouring Data
CUT-OFF ELEV. : ____________________________ WEATHER : ______________________
THEORITICAL VOL. : ____________________________
ACTUAL VOLUME : ____________________________

TRANSIT TIME WATER WAS TIME OF POURING DEPTH OF HOLE LENGTH OF TREMIE PIPE
MIXER VOLUME (m3) ADDED TO THE REMARKS
NUMBER MIX
STARTED FINISHED DEPTH POURED EMBEDMENT

SUBMITTED BY:
SUBMITTED BY: CHECKED BY: APPROVED BY:

____________________ _________________ __________________________


Project Manager Project Engineer District Engineer/
Contractor DPWH Regional District Engineer/
PMO – Project Director
Sample Bored
Pile Drilling
Log
Sample Bored
Piling Cage Bar
Data
Sample
Bored Pile
Pouring Data
Bar Cutting List/Diagram
Project : Date : Sheet No. :
Location : Client :

BAR CUTTING LIST/DIAGRAM


RECORD OF INSTALLED REBARS AT ______
(Attachments to Pouring Request/Permit)

BAR BAR CUTTING LENGTH COMMERCIAL EQUIVALENT


BAR DESCRIPTION EQUI.
STRUCTURE
MARK SHAPE DIA. A B C D E F G LENGTH QTY. QTY. LENGTH WEIGHT
(KGS)

Unit Weight : 10mm = 0.616/m., 12mm = 0.888/m., 16mm = 1.579/m., 20mm = 2.466/m., 25mm = 3.854/m., 28 = 4.833/m., 32mm = 6.313/m., 36mm
TOTAL WEIGHT
= 7.991/m.,

Submitted by: Checked by: Approved by:

(Contractor
(DPWH Representative) (DPWH Representative)
Representative)
Work Permit No. __________
CONCRETE POURING
(ITEM 405 - STRUCTURAL CONCRETE )

Pouring Permit Date:________________________

PROJECT TITLE/LOCATION :______________________________________________________________________________

Item No.: ______________________ Type of Structure (Location): ________Portion to be Poured: _________


Description: Theoretical Volume : _____________ Actual Volume: __________
__________________________ (cu.m.) (cu.m.)

DESCRIPTION REMARKS PERSON RESPONSIBLE


A. GEOMETRIC CONTROL
1. Lines
2. Grades
B. Pre-requisite Test/Measurement
1. Dimensions
2. RSB, sized and spacing
C. MATERIAL REQUIREMENT
1. Portland Cement, Bags=_______
2. Fine Aggregates, Vol.=________
3. Coarse Aggregates, Vol.=______
4. Water
5. Admixture
6. Batching Plant Capability
7. Cylinder Mold
8. Curing Compound
D. CONSTRUCTION CONTROL
1. EQUIPMENT:
a. Concrete Vibrator
b. Chute, Crane Bucket, etc.
c. Transit Mixer/Bagger Mixer
d. Template
e. Protective covering materials
2. FORMS and SCAFFOLDS (Vertical &
Horizontal)
3. TRAFFIC SIGNS, BARRICADES
Notes:

REQUESTED BY: (Contractor)

Materials Engineer Quantity Engineer Project Engineer

APPROVED/DISAPPROVED: (DPWH)

Materials Engineer Quantity Engineer Project Engineer