OTC-28236-MS
Mobile Water Injection Facilities: Case Study of Brownfield
Redevelopment Strategy
Jit Sen Lim and Dayang Amalina Azyyati Awang Bakar, PETRONAS
Internal
Slide 2
D Field Background
OBJECTIVE B. Water Injection Facility (WIF)
To enhance oil recovery through water injection system, thus • Water Injection System facilities
increasing production rate.
• Mobile Platform
A. Infill Drilling and Associated Platform Modification
C. Flexible Pipelines Installation
• New wells : infill oil production (OP) wells + water
• 1 WI pipeline from D-A to D-B
injection (WI) wells
• 1 WI pipeline from D-A to D-C
• Platform modifications:
o D-B: deck extension for new conductor slots, solar panel
and WI piping
o D-C: deck extension for solar panel and WI piping
o D-A: deck extension for WI piping network and WIF bridge
landing deck.
Internal
Slide 3
D DEVELOPMENT PROJECT
Internal
Slide 4
Flexibility
of operation Potential
utilisation for
other fields
Internal
Slide 5
Water Injection Facilities Process
Polyelectrolyte
Sodium Hypo
Submersible Pump
Internal
Slide 6
2 Coarse filters
Internal
Slide 7
Smart Completion with inflow control valves (ICV) and online well data
• Well data accessible in office for WI analysis, monitoring & Surveillance via
pressure downhole gauges (PDG)
• Downhole ICV reduces well intervention (wireline)
Improved efficiency
Internal
Slide 8
Baseline Sustainability
Improved baseline production
Production levels improved and
from 2016
maintained due to higher uptime
Efficiency
Improved unplanned deferment
due to higher uptime after WIF is
installed – higher productivity
with manning
WIF installed