Sunteți pe pagina 1din 13

Presentation on solar re

mote

1
Contents

• Problem Statement
• Parameters of Remote Control
• Objective
• Block Diagram
• Schematic Diagram
• Explanation of schematic

2
PROBLEM STATEMENT

 If the room is dark we cannot find the Remote Control , so to


overcome this problem and to find the remote control easily
we are inculcating a LED in it.

3
PARAMETERS OF REMOTE CONTROL

 Remote control by using Solar Panel.


 Detection of Remote Control by using IOT/GSM.
 ON/OFF of Remote control using timer.
 Remote control using LED.

4
OBJECTIVE

The basic objective of developing the Television


Remote Control is as follows:
 By using Solar Panel re-usable cells can be
inculcated so that, cells can store energy using
sun rays i.e.Solar Energy.
By using LED in the remote control i.e.when
electric light is not there than LED glows as
soon as light is generated then turns off.
5
BLOCK DIAGRAM

6
Schematic Diagram

Output to
batteries

7
8
EXPLANATION OF SCHEMATIC

 Role of SPDT switch is that, it has two positions , on


e position allows for the 5 volts to run to the 3.3volta
ge regulator.
 That position should be used to charge the batteries i
n direct sunlight and the other position is what we call
as bypass, it simply skips the regulator and goes right
to the batteries, this position shouldn’t be used in dir
ect sunlight because the 5 volts will go straight to the
batteries which in some cases might not be good .

9
(Conti)
 Role of a diode is, it plays a rather important role, it do
esn’t let the batteries discharge back into the solar pan
el which could be damagind to the panel.
 Now to avoid the exceptional components like PCB, an
d addional space we prefer to built the circuitary on the
motherboard of remote itself.
 An important step to quit the risk of short in the circuit
is, the batteries in remote are connected in series means
both batteries are connected in one spot and its importa
nt to find the right connections on the remote.
 The negative and positive connection that lead to the re
mote circuit board not two connections that join the batt
eries together.

10
Remote after implementation of schematic circuitary.
11
PROJECT PLANNING

 Rechargeable cells using using solar energy by the


use of solar panel 5.5Volts.
 ON/OFF of LED if the room is dark.
 Detection of Remote Control using IOT/GSM

12
13

S-ar putea să vă placă și