Sunteți pe pagina 1din 20

TEAM BSCL:

URBAN LEARNING EXPERIENCE ASISH KUMAR CHOUDHURY UMG18004


K ROHITH BHARADWAJ UMG18008
A PRESENTATION ON MITRA BHANU SATAPATHY UMG18011
PANKAJ MITTAL UMG18016
BHUBANESWAR SMART CITY LTD. RIDHISHA AGARWAL UMG18022
SHREYANSH TANDON UMG18028
CONTENTS

INTRODUCING BHUBANESWAR
BHUBANESWAR’s SMART VISION
INTRODUCTING BSCL
ORGANIZATION STRUCTURE
BSCL INTERFACING WITH OTHER AGENCIES
PROJECTS & FUNDS
PROJECT SUMMARY
SMART TRAFFIC MANAGEMENT SYSTEM
COMMON PAYMENT CARD SYSTEM
SMART WI-FI
ACHIEVEMENTS OF SMART CITY BHUBANESWAR
REFERENCES

BSCL, XUMG (18-20), XUB 2


INTRODUCING BHUBANESWAR

BSCL, XUMG (18-20), XUB 3


BHUBANESWAR’s SMART VISION

"People- Centric" Planning & Design

TRANSIT CHILD- REGIONAL


ORIENTED LIVABLE ECONOMIC
FRIENDLY ECO-CITY
CITY CITY CENTRE
CITY Resilient, clean,
Compact urban Range of housing green and healthy Knowledge based
while enhancing Accessible, safe,
form and environment enterprises and
its heritage inclusive public
sustainable sustainable
places
mobility choices tourism

BSCL, XUMG (18-20), XUB 4


INTRODUCING BSCL
OBJECTIVES:
Launched by Govt. of Odisha on 23/02/2016
E-Governance

Special Purpose vehicle (SPV) under Company’s Act 2013


Sustainable City

Details of SPV Remarks Better Health & Education


Date of Establishment of SPV 08/03/2016
Total Authorized Capital of SPV Rs 500 Crores
Total Paid up Capital of SPV Rs 250 Crores Assured Electric supply

Safety & Security of


citizens
Basic Infrastructure
Urban transport

Smart Adequate water supply


Better Quality of Life
Solutions
BSCL, XUMG (18-20), XUB 5
ORGANIZATION STRUCTURE OF BSCL

Saroj Kumar Swain (OAS) Bijay Sahu


Addl. Charge G.M. (E&T)

BSCL, XUMG (18-20), XUB 6


BSCL INTERFACING WITH OTHER AGENCIES

Project Initiation Project Conclusion


(Tendering, Bidding Project Implementation (maintenance,
process, by collaborating with operations) by the
Procurements) by specified organization specified agency only
BSCL (CRUT, BDA, BMC etc)

Smart Project Initiated by BSCL Operated and maintained by BDA Smart Poles project initiated by BSCL
in collaboration with BMC
BSCL, XUMG (18-20), XUB 7
PROJECTS AND FUNDS
Area Based Developments Pan City Smart Solutions Social Smartness
Project Kutumb Common Payment Card System I Am Bhubaneswar
Integrated Public Service Centre Intelligent Traffic Control System Socially Smart Bhubaneswar
Integrated Infrastructure Improvement Bhubaneswar One
BMC Headquarter Smart Solutions
Street Vendors Improvement Project
Smart Janpath
Smart Park
Affordable Housing Project
Multilevel Car Parking RajMahal
Multilevel Car Parking Saheed Nagar

BSCL, XUMG (18-20), XUB 8


PROJECT SUMMARY
TENDERED COST /
SL.NO Project Name STATUS
WORK ORDER VALUE (CR.)
1 Smart Solutions - ICOMC 733 Work in Progress
2 Adaptive Traffic Signal Control System 14.69 Completed
3 Common Payment Card (PPP Project) 19.19 Work in Progress
4 Solar City Roof Top 20.00 Work in Progress
5 Smart Janpath 79.56 Work in Progress
6 Raj Mahal MLCP 43.85 Work in Progress
7 Saheed Nagar MLCP 28.87 Work in Progress
8 Social Equity Centre 5.4 Work in Progress
9 Integrated Public services centre 2.99 Work in Progress
10 ICOMC + BMC Building Complex 57.39 Tender Under Process
11 Smart Parks 1.8 Completed
12 Sensory Park 0.99 Work Started
13 3I – Integrated Infrastructure Improvement 370.00 Technical DPR Ready
14 Railway Station Multimodal Hub 840.00 Design consultant appointed
15 Lake Neutral 50.90 Tender Under Process
Master Plan completed. Under
16 Satya Nagar Institutional Core XXX
approvals
17 Mission Awaas – Shanti Nagar EPC project 59.35 Work in Progress
18 Mission Awaas - Shanti Nagar PPP project 358.74 Work in Progress
19 Socially Smart 1.06 Work In Progress
Source: BSCL

BSCL, XUMG (18-20), XUB 9


SMART TRAFFIC MANAGEMENT SYSTEM SMART SOLUTIONS

Previous Scenario Project Time Period Area of Development


• Manual Violation Detection Implementation – 15 Months
• Manual Challans 58 Intersections
Op & Maintenance – 84 Months
• Accident Information through FIR

14 Pelicans
Traffic System
Mode of Implementation
Turnkey contract
5 Blinkers

Cost of Project
Benefits
14.69 Crores
• Improved travel time
• Reduced Traffic Congestion

Implementing Agency • Safety & Air quality


• Traffic updates to citizens
Envoys Electronics Pvt. Ltd. • Coordinated management

BSCL, XUMG (18-20), XUB 10


SMART TRAFFIC MANAGEMENT SYSTEM SMART SOLUTIONS

Smart Traffic Gaps


Management System
• ATTCC is having a speed
limit of 20 KMPH -120
Traffic Violation Detection KMPH
System • The person who is not
wearing a helmet
• Using of Cycle path for
ATCC System
parking and driving as
well
• Driving the vehicle ANPR System DMS System
Public Address System without Proper License
• Driving on the wrong
way on footpath. ANPR
Dynamic Message Signboard

E-Challan

TVDS System

DMS System

BSCL, XUMG (18-20), XUB 11


COMMON PAYMENT CARD SYSTEM SMART SOLUTIONS

Project Implemented under PPP mode

Dual Interface Point of Sale (POS) Devices


TOTAL COST (PPP)- 19.19
Cr.
Agreement signed with ICICI
325 (CPCS Card Design)

POS access points


Bank on 4th July 2018.

Card design is finalised. Phase I to


be rolled out by August 2018.
500,000
Smart cards
BSCL, XUMG (18-20), XUB 12
COMMON PAYMENT CARD SYSTEM SMART SOLUTIONS

Working procedure of CPCS

BSCL, XUMG (18-20), XUB 13


COMMON PAYMENT CARD SYSTEM SMART SOLUTIONS

GAPS

• Lack of promotion
1

• Reluctance to Change
2

• Lack of co-ordination
3

BSCL, XUMG (18-20), XUB 14


SMART WI-FI SMART SOLUTIONS

Free access BhubaneswarMe Wi-Fi


to e-
governance project

High
speed City Self
sustainable
communic Wi-Fi revenue 500 WI-FI
250 MB OF WIRELESS SERVICE
FREE DATA BANDWITH PROVIDER –
ation project generation HOT SPOTS WI-FI SPEED
ACCESS PER OF 2.4GHz RAILTEL
ACROSS @ 2 MBPS
network THE CITY
DAY PER & 5GHz CORP.OF
USER PROVIDED INDIA

Reliable
&
scalable

City Wi-Fi zone at Saheed Salient features of city wide Wi-Fi


nagar Objective of City wide Wi-Fi project

BSCL, XUMG (18-20), XUB 15


SMART WI-FI SMART SOLUTIONS

Architectural components of city


Wi-Fi project Wi-Fi modules
located on
telephone and
flood light poles
Associated with access
Wireless point networks
Access Wireless active &
Wi-Fi servers management
passive
points controllers system
infrastructure

Junction boxes Smart pole consisting of traffic Wireless management system cabinets
lights, Wi-Fi modules & CCTVs. and associated components
BSCL, XUMG (18-20), XUB 16
SMART WI-FI SMART SOLUTIONS

Observed
speed of
2.03 Mbps

Speed test of BhubaneswarMe


Frequent Range of
offline Observatio connectivity Wi-Fi
access n was
points 45metres
Better
marketing
techniques

Non Unauthorized digging of cables


fluctuating Better inter affecting the aesthetic value of
connectivity access point Better luring
between schemes the surrounding
Access points
connectivity Scope of
Improvements

Conserving Maintenance
the aesthetic down-time
scenery reduction
17
BSCL, XUMG (18-20), XUB
SMART CITY BHUBANESWAR

ACHIEVEMENTS

BSCL, XUMG (18-20), XUB 18


REFERENCES

Bhubaneswar Municipal Corporation . (n.d.). Retrieved from http://bmc.gov.in/About.aspx


Ministry of Housing and Urban Affairs. (n.d.). Retrieved from http://mohua.gov.in/
Smart City Bhubaneswar. (n.d.). Retrieved from https://www.smartcitybhubaneswar.gov.in
MSI-RFP-BBSR Implementation of Smart City Projects
Image sources: Survey

BSCL, XUMG (18-20), XUB 19


THANK YOU

BSCL, XUMG (18-20), XUB 20

S-ar putea să vă placă și