ON EARTH AND ROCKFILL DAMS

by

Dr.K.Venkatachalam
Consultant EDF
NTPC KOLDAM PROJECT
(HP)
Clay Core #1
TYPICAL CROSS SECTION OF NTPC
KOL DAM PROJECT (HP)
Filter #2, #4, #7
Hard Rockfill #8

Upstream Cofferdam Shell #5,#9


Dr. K. Venkatachalam
Details of zones of the dam

Shell #5

Coarse Filter #4

Fine Filter #2

Clay Core #1
Dr. K. Venkatachalam
GENERAL CONSIDERATIONS

 SAFTEY AND SATISFACTORY


PERFORMANCE REQUIRE :

 COMPETENT AND ADEQUATE SUPERVISION


 CAREFUL INSPECTION
 CONTROL TESTING

Dr. K. Venkatachalam
4
INTERACTION OF RESIDENT ENGINEER
WITH CC
 TO PROVIDE ADDITIONAL DESIGN AND
CONSTRUCTION DETAILS
 TO PROVIDE REQUIRED FIELD SUPERVISION
AND CONTROL
 TO COORDINATE THE WORKS WITH
DESIGNERS
 TO PROVIDE GUIDANCE TO THE CC
IN CASE OF SURPRISES ENCOUNTERED DURING
CONSTRUCTION

Dr. K. Venkatachalam
5
FOUNDATION TREATMENT

Dr. K. Venkatachalam
6
CAVITIES IN THE ABUTMENT
FOUNDATION

Dr. K. Venkatachalam
7
DENTAL CONCRETING/ GROUTING

Dr. K. Venkatachalam
8
INTERACTION OF CONSTRUCTION &
DESIGN ENGINEERS

Dr. K. Venkatachalam
9
IMPORTANCE OF CONSTRUCTION QC

 POOR CONSTRUCTION QC
 POOR MATERIAL QC

CREATED SIGNS OF DISTRESS AND PARTIAL


FAILURES IN EARTH AND ROCKFILL DAMS
CALLED FOR EXPENSIVE REMEDIAL MEASURES

Dr. K. Venkatachalam
10
CLOSE OBSERVATIONS BY GEOTECH.
ENGINEERS/GEOLOGISTS

 EARLY DETECTION OF SEEPAGE PROBLEMS


 OPENING OF FOUNDATIONS
 OPENING OF ABUTMENTS
 OPENING OF BORROW AREAS

Dr. K. Venkatachalam
11
CONT.

 EXCAVATION OPERATIONS
 DEFORMATION OF FOUNDATIONS
 FILL OPERATIONS
 ABUTMENTS

 AROUND INSTRUMENTS

 REST OF THE DAM LENGTH/WIDTHS

 DEFORMATIONS OF FILL MATERIALS

Dr. K. Venkatachalam
12
RESIDENT ENGINEER’S RESPONSIBILITY

 REPORTING OF UNEXPECTED GEOLOGICAL


SURPRISES
 CO-ORDINATION WITH DESIGN ENGINEERS
FOR
 ANY ADDITIONAL DESIGN /MODIFICATIONS
 CONSTRUCTION DETAILS
 TO PROVIDE THE REQUIRED FIELD
SUPERVISION
 TO ENHANCE CONSTRUCTION QC TESTS

Dr. K. Venkatachalam
13
CONT.

 TO PROVIDE GUIDANCE TO THE CC IN CASE


OF SURPRISES ENCOUNTERED
 REVIEW OF CONSTRUCTION PLANS FOR
 QUALITY CONTROL
 DEWATERING
 DRAINING WORK AREAS
 HAUL ROADS
 INSPECTION OF ACTUAL OPERATIONS

Dr. K. Venkatachalam
14
RIGHT BANK ROCK SLIDE

Dr. K. Venkatachalam
15
INTERACTION OF CONSTRUCTION &
DESIGN ENGINEERS

 REASSES THE DESIGN CONCEPT IN THE


LIGHT OF ACTUAL FIELD OBSERVATIONS
 FREQUENT VISITS TO THE PROJECT TO
OBSERVE ACTUAL CONDITIONS/
CONSTRUCTION PROCEDURES
 CONSULTATION WITH SPECILISTS
 ANALYSIS OF COMPACTION CONTROL
RESULTS

Dr. K. Venkatachalam
16
ANALYSIS OF STABILITY CONDITIONS
BASED ON
 RESULTS OF LAB TESTS
 ADDITIONAL FOUNDATION SAMPLES
 PORE WATER PRESSURES
 SETTLEMENT OBSERVATIONS
 LATERAL DEFORMATIONS

HIGH DEGREE OF COORDINATION BETWEEN


DESIGN AND CONSTRUCTION ENGINEERS AND
ALSO SPECIALISTS IS MANDITORY

Dr. K. Venkatachalam
17
CONTINUOUS MONITORING DURING
IMPOUNDING/RESERVOIR OPS.

 BASED ON FILL PIEZOMETERS


 DEVELOPMENT OF PORE PRESSURES(U/S)
 DISSIPATION OF PORE PRESSURE(D/S)
 EVALUATION OF ‘B’PARAMETERS
 INTERPRETATION OF ‘B’ PARAMETERS
 EXISTANCE OF CRACKS
 PERFORMANCE OF FILTER MATERIALS(D/S)
 MIGRATION OF FINES(FACE OF D/S FINE FILTER)
 POSSIBILITY OF PIPING WITHIN CORE ZONE

Dr. K. Venkatachalam
18
CONT.

 BASED ON FOUNDATION PIEZOMETERS


 EFFICIENCY OF GROUT CURTAIN
 PIEZOMETRIC HEAD (U/S TO D/S)
 BASED ON OTHER INSTRUMENTS
 HORIZONTAL MOVEMENT
 SETTLEMENTS (ABSOLUTE/DIFFERENTIAL)
 U/S SLOPE FAILURE
 D/S SLOPE FALIURE
 BASED ON SEEPAGE MEASUREMENT WEIRS
 EVALUATION OF SEEPAGE WATER
 EFFICIENCY OF GROUT CURTAIN

Dr. K. Venkatachalam
19
BASED ON VISUAL INSPECTION ROUTINE

 ALONG GROUTING GALLERIES


 ALONG DRAINAGE GALLERIES
 ALONG DAM CREST
 ALONG D/S FACE OF THE DAM
 WETNESS
 DEPRESSION
 ALONG D/S ABUTMENTS
 WETNESS
 EROSION
 RESERVOIR RIM SLOPE STABILITY (BY
BOAT)

Dr. K. Venkatachalam
20
UNSTABLE RESERVOIR RIM

Dr. K. Venkatachalam
21
IN CASE OF EMERGENT SITUATION

 CONTROLLED RATE OF FILLING (IF


REQUIRED)
 DEPLETION OF RESERVOIR (IF REQUIRED)
 ENHANCED GROUTING ACTIVITIES
 DRILLING OF ADDITIONAL DRAINING
HOLES

Dr. K. Venkatachalam
22
FAILURE OF TETON DAM

Dr. K. Venkatachalam
23
IMPORTANCE OF COMPLETION
REPORT

 NARRATIVE HISTORY OF THE PROJECT


 SCHEDULES OF STARTING AND
COMPLEATING OF VARIOUS PHASES OF
THE PROJECT
 TREATMENT OF UNSUAL CONDITIONS
 CONSTRUCTION METHODS
 QUANTITIES OF MATERIALS INVOLVED

Dr. K. Venkatachalam
24
CONT.

 MAINTAINANCE OF RECORDS OF VARIOUS


QUALITY CONTROL RESULTS
 CONSTRUCTION PHOTOGRAPHS/ VIDEO
PHOTOGRAPHY
 SUMMARY OF FIELD COMPACTION
CONTROL DATA AND LABORATORY TEST
RESULTS
 SUMMARY OF OTHER TESTS RESULTS FOR
ACCEPTANCE CONTROL

Dr. K. Venkatachalam
25
CONT.

 STABILITY ANALYSIS BASED ON


INSTRUMENTATION DURING
 CONSTRUCTION
 IMPOUNDING
 RESERVOIR OPERATIONS
 SUMMARY OF INSTRUMENTATION DATA
 REFERENCES TO
 CONFERENCES
 INSPECTION TO OTHER EXISTING SIMILAR
PROJECTS
RESULTING ACTIONS IMPLEMENTED IN THE
PROJECT

Dr. K. Venkatachalam
26
GLIMPSES OF NTPC KOL DAM HE
PROJECT (HP)

Dr. K. Venkatachalam
27
DIVERSION TUNNELS- LUV & KUSH

Dr. K. Venkatachalam
28
MAIN DAM,DECANTING CHAMBER,
SPILLWAY,etc.

Dr. K. Venkatachalam
29
D/S FACE OF THE DAM (RIP-RAP)

Dr. K. Venkatachalam
30
SYSTEMATIC PLACEMENT OF RIP-RAP
MATERIAL (D/S)

Dr. K. Venkatachalam
31
CONCLUSION

THE DESIGN OF AN EARTH AND ROCKFILL


DAM IS NOT FININSHED UNTIL

 THE CONSTRUCTION IS COMPLETE


 THE RESERVOIR IMPOUNDING IS COMPLETE
 THE DAM IS FUNCTIONING SATISFACTORILY

Dr. K. Venkatachalam
32
THANK YOU