Sunteți pe pagina 1din 155

INJECTION MOULDING

CORPORATE TRAINING AND


PLANNING
Historical Background
• A single-action hydraulic injection machine was
designed in the U.S.A. in 1870 by Hyatt
• Heating-cylinder design was first recognised in a
patent issued to Adam Gastron in 1932.
• Large-scale development of injection moulding
machinery design towards the machines we
know today did not occur until the 1950's in
Germany

CORPORATE TRAINING AND


PLANNING
Injection Moulding Process
– Over View

Solid Wide neck, Flat Product is made


like bucket, cabinets, Automobile &
Industrial parts etc…. by injecting
molten thermoplastic material in to a
closed mould which is relatively cool.

CORPORATE TRAINING AND


PLANNING
Type of Injection Moulding
Machine
• Hand Injection Moulding M/C

• Plunger type Injection Moulding M/C

• Reciprocating Screw Type Injection


Moulding M/C

CORPORATE TRAINING AND


PLANNING
Hand Injection Moulding Machine

vertical machine consists of Barrel, Plunger,


Band Heaters along with energy regulator, Rack
& Pinion system for Injecting the material by the
plunger, a torpedo and nozzle.
CORPORATE TRAINING AND
PLANNING
Plunger Type Injection
Moulding Machine

Vertical & Horizontal Plunger Type Injection Moulding Machine


CORPORATE TRAINING AND
PLANNING
The Reciprocating Screw
• The feeding zone
• The compressing (or transition) zone
• The metering zone

CORPORATE TRAINING AND


PLANNING
Machine components

CORPORATE TRAINING AND


PLANNING
The Injection Process
• Plasticises the material by reciprocating Screw.
• Injects the molten material to a closed mould
– via a channel system of gates and runners.
• Cools the Mould.
• Refills the material for the next cycle.
• Ejects the Product.
• Closes the Mould for further cycle.

CORPORATE TRAINING AND


PLANNING
Injection Moulded Items

CORPORATE TRAINING AND


PLANNING
Injection Moulded Items

CORPORATE TRAINING AND


PLANNING
Injection Moulded Items

CORPORATE TRAINING AND


PLANNING
Advantages of Injection
Moulding Process
• Parts can be produced at high production rates.
• Large volume production is possible.
• Relatively low labour cost per unit is obtainable.
• Process is highly susceptible to automation.
• Parts require little or no finishing.
• Many different surfaces, colours, and finishes are
available.
• Good decoration is possible.
• For many shapes this process is the most economical way
to fabricate.
• Process permits the manufacture of very small parts which
are almost impossible to fabricate in quantities by other
methods.
CORPORATE TRAINING AND
PLANNING
Advantages of Injection
Moulding Process
• Minimal scrap loss result as runners, gates, and rejects
can be reground and reused.
• Same items can be moulded in different materials,
without changing the machine or mould in some cases.
• Close dimensional tolerances can be maintained.
• Parts can be moulded with metallic and non-metallic
inserts.
• Parts can be moulded in a combination of plastic and
such fillers as glass, asbestos, talc and carbon.
• The inherent properties of the material give many
advantages such as high strength-weight rates,
corrosion resistance, strength and clarity.
CORPORATE TRAINING AND
PLANNING
Limitations of Injection Moulding
• Intense industry competition often results in low profit
margins.

• Mould costs are high.

• Moulding machinery and auxiliary equipment costs are


high.

• Lack of knowledge about the fundamentals of the


process causes problems.

• Lack of knowledge about the long term properties of the


materials may result in long-term failures.
CORPORATE TRAINING AND
PLANNING
Machine operation sequence
The mould closes and the screw begins moving forward for
injection.

The cavity fills as the reciprocating screw moves forward, as a


plunger.

CORPORATE TRAINING AND


PLANNING
Machine operation sequence
The cavity is packed as the screw continuously moves forward.

The cavity cools as the gate freezes off and the screw begins to
retract to plasticize material for the next shot.

CORPORATE TRAINING AND


PLANNING
Machine operation sequence
The mould opens for part ejection

The mould closes and the next cycle begins

CORPORATE TRAINING AND


PLANNING
Injection Mould
CORPORATE TRAINING AND
PLANNING
Mould system
A typical (three-plate) moulding system

CORPORATE TRAINING AND


PLANNING
A two-plate mould. A three-plate mould.

The moulded system includes a delivery system and moulded parts.


CORPORATE TRAINING AND
PLANNING
Screw Used in Injection Moulding Machines

The screw has three zones with a ring-plunger assembly. The Feed Zone,
where the plastic first enters the screw and is conveyed along a constant
root diameter; the Transition Zone, where the plastic is conveyed,
compressed and melted along a root diameter that increases with a constant
taper; and the Metering Zone, where the melting of the plastic is completed
and the melt is conveyed forward along a constant root diameter reaching a
temperature and viscosity to form parts.
CORPORATE TRAINING AND
PLANNING
L/D RATIO

• The L/D ratio is the ratio of the flighted length (Effective


Length) of the screw to its outside diameter.

• Most injection screws use a 20:1 L/D ratio. But it may


range from 18:1 to 24:1

• In the case of Thermoset it may range from 12:1 to 16:1.

CORPORATE TRAINING AND


PLANNING
High L/D Ratio results the following ….

• More shear heat can be uniformly generated in the


plastic without degradation;

• Greater the opportunity for mixing, resulting in a better


homogeneity of the melt.

• Greater the residence time of the plastic in the barrel


possibly permitting faster cycles of larger shots.

CORPORATE TRAINING AND


PLANNING
COMPRESSION RATIO (CR)
• The ratio of the first flight depth of feed zone to the last
flight depth of meter zone ,
Or,
• First Channel Volume of feed zone to last channel
volume of metering zone,

• Typically ranges from 1.5:1 to 4.5:1 for most


thermoplastic materials.

• Most injection screws classified as general purpose have


a compression ratio of 2.5:1 to 3.0:1.

• Thermo set screws have a 1:1 ratio.

CORPORATE TRAINING AND


PLANNING
Higher the CR results the following ….

• Greater shear heat imparted to the resin

• Greater heat uniformity of the melt

• High Potential for creating stresses in some


resins

• High energy consumption

CORPORATE TRAINING AND


PLANNING
Back Pressure (Kg/Cm2 or bar)
Back pressure is the amount of pressure
exerted by the material ahead of the screw,
as the screw is pushed back in preparation
for the next shot.

Effect of Back Pressure


• More Homogeneous Mix
• Proper Melting
• More compact
• Sometime leads degradation
CORPORATE TRAINING AND
PLANNING
Injection Speed (cm/Sec)
The injection speed is the forward
speed of the screw during its injection
operation per unit time.

Effect of Injection Speed


• Easy Injection of Material
• Avoid Short-Shot
• Some times leads more orientation & burn
marks
CORPORATE TRAINING AND
PLANNING
Screw Rotation Speed
The screw rotation speed (RPM) is the rate at which the
plasticizing screw rotates.

The faster the screw rotation result the following ..

• Faster the material is compressed by the screw flights

• Increasing the amount of shear heating

• Low residence time, some less melting

CORPORATE TRAINING AND


PLANNING
Cushion
The cushion is the difference in the final forward position
of the screw and its maximum allowable forward
position.

• More Cushion results more residence time, some time


degrades.

• If the screw were allowed to travel its full stroke and stop
mechanically against the nozzle, the cushion would be
zero.

• With zero Cushion no hold on works.

• Typically a cushion of 3 to 6 mm is used.


CORPORATE TRAINING AND
PLANNING
Materials for Injection Moulding
• Acrylonitrile butadiene styrene (ABS)
• Acetal
• Acrylic
• Polycarbonate (PC)
• Polyester
• Polyethylene
• Fluoroplastic
• Polyimide
• Nylon
• Polyphenylene oxide
• Polypropylene (PP) **
• Polystyrene (PS)
• Polysulphone
• Polyvinyl chloride (PVC)
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Molecules lie in a definite fashion or regular arrangement
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Molecules fall in Crystalline & amorphous pattern
CORPORATE TRAINING AND
PLANNING
Amorphous Polymer has

CORPORATE TRAINING AND


PLANNING
CORPORATE TRAINING AND
PLANNING
While flowing in the channel or cavity of the Mould. As the melt
touches the surface of the mould its viscosity increases
because of lowering of melt temperature, So it slides on the
Surface and the Molecules gets oriented
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Non Newtonian Plastics

CORPORATE TRAINING AND


PLANNING
Non Newtonian Plastics

CORPORATE TRAINING AND


PLANNING
CORPORATE TRAINING AND
PLANNING
Newtonian Plastic

CORPORATE TRAINING AND


PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Broad Molecular weight Distribution shows broad
Melting Points
CORPORATE TRAINING AND
PLANNING
Narrow Molecular weight Distribution shows sharp Melting Points
CORPORATE TRAINING AND
PLANNING
Plastic Product Properties can change 10% or more by
changing Process Conditions
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
During Refilling

CORPORATE TRAINING AND


PLANNING
During Injection

CORPORATE TRAINING AND


PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Additive Function Examples
Filler increase bulk density calcium carbonate,
talc, limestone
Plasticizer improve processability, phthalate esters,
reduce product brittleness phosphate esters
Antioxidant prevent polymer oxidation phenols, aromatic
amines
Colorant provide desired part oil-soluble dyes,
application color organic pigments
Flame reduce polymer flammability antimony trioxide
retardant
Stabilizer stabilize polymer against carbon black,
heat or UV light hydroxybenzophenone
Reinforcement improve strength E-glass, S-glass,
carbon, Kevlar fibers

CORPORATE TRAINING AND


PLANNING
TOGGLE TYPE CLAMPING
• A toggle is mechanically device to amplify force.
• In a moulding machine, which consists of two bars
joined, together end to end with a pivot .
• The end of one bar is attached to a stationary platen,
and the other end of a second bar is attached to the
movable platen.
• When the mould is open, the toggle is in the shape of a
V.
• When pressure is applied to the pivot, the two bars form
a straight line.

CORPORATE TRAINING AND


PLANNING
TOGGLE TYPE CLAMPING

CORPORATE TRAINING AND


PLANNING
TOGGLE TYPE CLAMPING

ADVANTAGE

• Low cost and lower horsepower needed to run.


• Positive clamp of the mould

DISADVANTAGE

• Do not read the clamp force.


• Clamping is more difficult.
• Higher maintenance as lubricant is provided.
CORPORATE TRAINING AND
PLANNING
HYDRAULIC CLAMPING
• A clamping unit actuated by hydraulic cylinder, which is
directly connected to the moving, closed the mould. In
this case ram of hydraulic system is attached to moving
platen. There are two halves in hydraulic cylinder, which
is actually inlet and outlet of oil.

• When oil goes to the cylinder with pressure oil pushes


the ram to forward direction by which moving platen
moves and mould closed and when oil comes from the
cylinder the ram come back and mould is open.

CORPORATE TRAINING AND


PLANNING
HYDRAULIC CLAMPING

CORPORATE TRAINING AND


PLANNING
HYDRAULIC CLAMPING
ADVANTAGE

• Clamp speed easily controlled and stopped at any point.


• Direct a read out of clamp force.
• Easy adjustment of clamped force and easy mould set
up.
• Low maintenance as part is self lubricated.

DISADVANTAGE

• It is higher cost and more expensive than toggle


system.
• None positive clamp.
CORPORATE TRAINING AND
PLANNING
TIE-BAR LESS CLAMPING
• Tie-Bar less clamping system is basically Hydraulic
clamping system without any tie bar.

• The platen is moved on a rail system.

• The main advantage of this system there is no limitation


of mould platen size.

• As there is no tie bar so the mould dimension is not so


important.

• Also mounting of the mould is easy and it is very useful


when products eject from the mould is manual.
CORPORATE TRAINING AND
PLANNING
TIE-BAR LESS CLAMPING

CORPORATE TRAINING AND


PLANNING
TIE-BAR LESS CLAMPING
• Much larger mould mounting area.
• Larger stroke compared to the toggle type machines.
• Full machine capacity can be utilised.
• Smaller machines can mould larger components.
• Saves floor space.
• Saves electrical energy because of reduction in the size of machine.
• Has the capacity to reduce weight of the moulded component because tie-
bar stretching is not there.
• Machine becomes very flexible for future modification.
• Easy access to mould cavity's because of the absence of the tie bars.
• Robotic arm movement becomes easy.
• Fewer moving parts so lesser wear and tear so longer life for machines.
• Lower lubrication required.
• Removal of mould plates much simple.
• Greater stability.

CORPORATE TRAINING AND


PLANNING
Theoretical Calculation

CORPORATE TRAINING AND


PLANNING
Example 1: POM has an S.G. of 1.42. It is to be moulded in
an Injection Moulding Machine with a shot weight of 80 gms
(in PS).

This machine has a shot weight of 80 x 1.42 / 1.05 = 108.19


gms of POM.

Example 2: PP has an S.G. of 0.90. It is to be moulded in an


Injection Moulding Machine with a shot weight of 80 gms (in
PS).

This machine has a shot weight of 80 x 0.90 / 1.05 = 68.57


gms of PP.

CORPORATE TRAINING AND


PLANNING
Example 3: Figurines made of UPVC (S.G. 1.38) with a
combined weight of figurine plus runners of 40 gms. are to
be moulded. What size of machine is sufficient?

Shot weight in terms of PS = 40 x 1.05/1.38 = 30.43 gms.

Using the 85% guide line, the machine shot weight needed
= 30.43/0.85 =35.80 gms.

Example 4: The same figurine in example 3 is to be moulded


in a big machine. What is the biggest machine that could be
used?

Using the 35% rule, the biggest machine that could be used
has a shot weight = 30.43/0.35 = 86.94 gms.
CORPORATE TRAINING AND
PLANNING
Determining Projected Area

Projected area is calculated by multiplying


length times width.

CORPORATE TRAINING AND


PLANNING
Determining Clamping Force
(Tonnes)

Projected Area = Length x Width

and multiplying that area by a clamp factor of between 2 and 8. Most


commonly factor 5 is used.

Clamp Force = Projected Area x 5

For every inch of depth the clamp force must be increased by


10%.

CORPORATE TRAINING AND


PLANNING
Example 5: What is the residence time of UPVC (S.G. 1.38) in a machine
with screw diameter of 55 mm, injection stroke of 250 mm, shot weight
(PS) of 567 g, and a cycle time of 10 s moulding shots weighing 260 g?

Volume of melt in the barrel is estimated to be two times the injection


volume = 2 * 3.1416 * 5.5 * 5.5 * 25 / 4 = 1188 cm3
Barrel residence time = 1188 * 1.38 * 10 / 260 = 63 s

Example 6: A GPPS cup of diameter 79 mm is to be moulded. The cup is


0.6 mm at its thinnest section. Find a conservative clamping force which
would be sufficient.

The projected area of the cup (and runner) is 3.1416 * 7.92 / 4 = 49 cm2.

This cup belongs to the thin wall domain. The conservative clamping force
is 0.62 * 49 = 30.4 tonnes.

CORPORATE TRAINING AND


PLANNING
Example 7: The same GPPS cup has a flow path length of 104 mm. Find
a more accurate clamping force needed.

Flow path to thickness ratio (L/T Ratio) = 104 / 0.6 = 173. From Figure 2,
at 0.6 mm wall thickness, the cavity pressure is 550 bar.
1 bar = 1.02 kg/cm2. The clamping force = 550 * 1.02 * 49 = 27,500 kg =
27.5 tonnes.

The above calculation has not accounted for viscosity. It turns out to be
still correct as the viscosity factor for GPPS is 1.0.

Example 8: The same cup as in the above example is to be made out of


ABS. Find the clamping force needed.

Using the viscosity factor of 1.5, the clamping force needed = 1.5 * 27.5
tonnes = 41.3 tonnes.
CORPORATE TRAINING AND
PLANNING
Plastic flow

(a) Simple shear flow. (c) Shear flow in cavity filling.


(b) Simple extensional flow. (d) Extensional flow in cavity filling.
CORPORATE TRAINING AND
PLANNING
where

CORPORATE TRAINING AND


PLANNING
When Plastics flow in the cavity, the pressure decreases along
the delivery system and the cavity
CORPORATE TRAINING AND
PLANNING
Injection pressure as a function of melt viscosity, flow length,
volumetric flow rate, and part thickness
CORPORATE TRAINING AND
PLANNING
Setting Machine Process Conditions
1 Set the melt temperature

2 Set the mold temperature

3 Set the switch-over position

4 Set the screw rotation speed

5 Set the back pressure

6 Set the injection pressure to the machine maximum

7 Set the holding pressure at 0 MPa

8 Set the injection velocity to the machine maximum

9 Set the holding time

10 Set ample remaining cooling time

CORPORATE TRAINING AND


PLANNING
Setting Machine Process Conditions
11 Set the mold open time

12 Mold a short-shot series by increasing injection volume

13 Switch to automatic operation

14 Set the mold opening stroke

15 Set the ejector stroke, start position, and velocity

16 Set the injection volume to 99% mold filled

17 Increase the holding pressure in steps

18 Minimize the holding time

19 Minimize the remaining cooling time

CORPORATE TRAINING AND


PLANNING
Basic Process Factors in Injection
Moulding
• Material Parameters
– Amorphous, Semicrystalline, Blends and Filled Systems
– Pressure-Volume-Temperature (PVT) Behaviour
– Viscosity
• Geometry Parameters
– Wall Thickness of Part
– Number of Gates
– Gate Location
– Gate Thickness and Area
– Type of Gates: Manually or Automatically Trimmed
– Constraints from Ribs, Bosses and Inserts
• Manufacturing Parameters
– Fill Time
– Packing Pressure Level
– Mold Temperature
– Melt Temperature
CORPORATE TRAINING AND
PLANNING
Residual stress

The development of residual flow stresses due to frozen-in molecular


orientation during the filling and packing stages. (1) High cooling, shear,
and orientation zone (2) Low cooling, shear, and orientation zone
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Process Controls
Injection Moulding cycle can be broken down into four
phases:
• Fill,
• Pack,
• Hold, and
• Cooling/plastication
These phases can be controlled by following variables:
• Injection Speed,
• Plastic Temperature,
• Plastic Pressure,
• Cooling Temperature and Time.

CORPORATE TRAINING AND


PLANNING
CORPORATE TRAINING AND
PLANNING
CORPORATE TRAINING AND
PLANNING
Cycle time in injection moulding

CORPORATE TRAINING AND


PLANNING
CORPORATE TRAINING AND
PLANNING
Post Moulding Operation
• Heat inserting
• Chrome Plating
• In Mould Insert Moulding
• Post Mould Inserting
• Drilling
• Polishing
• Assembly

CORPORATE TRAINING AND


PLANNING
Secondary operations
• Bonding
• Welding
• Inserting
• Staking
• Swaging
• Assembling with fasteners

CORPORATE TRAINING AND


PLANNING
Secondary operations
• Appliqué: a surface covering applied by heat and
pressure
• Printing: a process of making a mark or impression onto
a substrate for decorative or informational purposes.
• Painting
• Hard coating
• Metallizing/shielding
• Surface treatment
• Annealing
• Machining

CORPORATE TRAINING AND


PLANNING
Benefits of Post Moulding Operations
• Reduced costs – by carrying out post moulding operations in
house, and utilising lean manufacturing tools, we can greatly reduce
component costs and the complexity of work that our customers
would ordinarily undertake.
• High level of quality – performing post-moulding operations on
products helps ensure that a high level of quality is maintained. By
checking parts from the moment they leave a press, to final
assembly, quality levels can be maintained and ensure that
components are only assembled to the highest standards.
• Reduction of Customer’s stock holding – Assembly of
components will reduce the cost of customers stock holding due to
delivery of an assembly rather than a range of components.
• Reduced production times – post moulding operations mean there
is very little time between the production of components and their
assembly. This means that a great deal of time can be saved when
components would normally be transported, or stored, in between
moulding and assembly operations.

CORPORATE TRAINING AND


PLANNING
Heat inserting is the addition
of inserts into a part
increases the functionality of
a part by which components
can be assembled.

CORPORATE TRAINING AND


PLANNING
Benefits of Heat Inserting
• Increased functionality – by adding inserts to
mouldings the part can more easily be used for its
designed purpose. For example by adding threaded
inserts parts can be easily be screwed to their fixings or
other parts, increasing their functionality.
• Low part degradation – the process of heat inserting
means that the heating/melting of the part is very
localised to where the insert will be pressed in. this
means that parts do not suffer warping, or any other
distortion effects, due to being heated again.
• High level of quality – due to the known challenges
with heat inserting extra measures are taken to ensure
the processes is repeated to as high a level as possible,
meaning part quality is kept very high.

CORPORATE TRAINING AND


PLANNING
Chrome Plating

Due to the chrome plating process requiring the


part to be electrically conductive, a series of steps
are required before the chrome can be deposited
onto the surface of the product.
CORPORATE TRAINING AND
PLANNING
Benefits of Chrome Plating
• Metal finish - Metal finishes can be very popular and, by
coating plastics, advantage can be taken of
characteristics from both materials.
• Wear resistant – as chrome is a metal rather than a
plastic its wear resistance properties are much greater
than those of the plastic it covers. This means for
applications where a part might be handled repeatedly,
such as a shower handset, a chrome finish is likely to
wear better than its plastic counterpart.
• Electrically conductive parts – by chrome or nickel
plating a part it is possible to give a plastic component the
ability to conduct electricity. This gives the advantage of
being able to create electrical components that are light
weight and less costly to produce than completely metal
parts.
• Attractive mouldings – by applying chrome finish to
mouldings a CORPORATE TRAINING AND
PLANNING
In Mould Insert Moulding

In mould insert moulding is the process by


which a metal, or preformed plastic, insert is
incorporated in to the component during the
moulding stage.
CORPORATE TRAINING AND
PLANNING
Benefits Of In Mould Insert Moulding
• Reduced post-moulding operations – With in mould insert moulding the
need for post moulding operations is greatly reduced. This helps with ease
of assembly and reduces the labour necessary for products.
• Increased part consistency – Insert Moulding has major benefits in the
consistency of parts produced. As the inserts are placed in the same
locations in tools for every cycle each of the mouldings produced will be
exactly the same. This helps reduce costs, as rejected parts will be kept to a
minimum.
• Ease of assembly – Due to inserts being incorporated into parts during the
moulding stage this eases the assembly of the part. Instead of having to
place fittings to attach parts fittings can be incorporated during the moulding
stage so that parts can be simply clipped together.
• Reduced production time – when vertical moulding machines, that are
equipped with a rotary table, are used for production there is the opportunity
to have two halves of the lower part of the tool. This means that production
is almost constant with mouldings being formed at the same time as fresh
inserts are being loaded into the second half of the tool. This lowers overall
production times and can also reduce the amount of labour needed.

CORPORATE TRAINING AND


PLANNING
Post Mould Inserting

Post mould inserting is the process by which a


metal, or preformed plastic, insert is
incorporated into a moulding by means of a
secondary process once the component has
already been moulded.
CORPORATE TRAINING AND
PLANNING
Benefits of Post Mould Inserting
• Ease of assembly – by adding inserts to a moulding the ease by
which it can be assembled is greatly increased. Inserts such as clips
or screw bolts can be incorporated into mouldings which greatly
assist assembly operations and subsequent product performance.
• Increased part functionality – besides adding inserts to aid
assembly inserts that improve a parts functionality can also be used.
For example, terminal fittings for wires, or seals to make parts
watertight.
• Increased component value – any second operation carried out on
a part will add value to it. By adding inserts to help assembly or
increase functionality, product value will be raised. This helps to
compensate for the extra time involved in second operations and
ensure products remain cost effective.
• Good part consistency – to carry out post mould inserting jigs are
used to hold mouldings while they are inserted. This means that the
repeatability of the operation is very good and all parts inserted will
be of the same quality.

CORPORATE TRAINING AND


PLANNING
Drilling

The drilling of parts is used to remove any


unnecessary polymer that may have been
necessary in the moulding process. By
removing this extra material in house it
means a ready-to-assemble moulding can
be provided to the customer, or the part can
be assembled with other mouldings.

CORPORATE TRAINING AND


PLANNING
Polishing
For products that have a high quality gloss finish a
post moulding polishing operation is often a useful
extra process. Even though the finish produced by
the moulding tool may be of a very high quality, a
polishing operation to remove any dust from the
product before final packaging gives a part the
high gloss finish that will have been specified..
Polishing operations are carried out on a soft-
polishing wheel with high quality wax to ensure
that a part is polished to a perfect finish without
leaving any marks.
CORPORATE TRAINING AND
PLANNING
Assembly
For products that require assembly we are able to
carry out this operation in our assembly facility. We
can demonstrate examples of assemblies where
we mould all the separate components in house
and assemble the parts either as a whole in the
assembly facility or as a step by step process on
the press as each part is produced. By carrying out
assembly in house we can reduce costs for our
customers while still producing products to a high
standard.

CORPORATE TRAINING AND


PLANNING
Faults & Remedies

CORPORATE TRAINING AND


PLANNING
Sink Marks

Depression in a moulded part caused


by shrinking or collapsing of the resin
during cooling.

CORPORATE TRAINING AND


PLANNING
Sink Marks - Problems
• Resin feed inadequate • Pressure too low.
• Improper mould design. • Mould temperature too low
• Parts cool too rapidly or high
• Rib section in part too wide. • Stock temperature too high
• Temperature of mould • Gate too small
surface opposite rib too hot. • Improper gate location
• Entrapped gas. • Nozzle and metering zone
• Nozzle too restrictive, temperatures too high.
• land length too long. • Excessive cooling time in
mould
• Unbalanced flow pattern.
• Bad check valve.

CORPORATE TRAINING AND


PLANNING
Jetting

Turbulence in the resin melt flow caused


by undersized gate, abrupt change in
cavity volume, or too high injection
pressure.

CORPORATE TRAINING AND


PLANNING
Jetting - Problems
• Excessive injection speed.
• Melt temperature too high.
• Melt temperature too low.
• mould Temperature too low.
• Nozzle opening too small.
• Gate and length too long.
• Sprue, runner, and/or gate size too small.
• Nozzle heating band malfunction.
• Inefficient gate location.

CORPORATE TRAINING AND


PLANNING
Splay Marks (Silver
Streaking, Splash Marks)
Marks or droplet type imperfections
formed on the surface of a finished
part.

CORPORATE TRAINING AND


PLANNING
Splay Marks (Silver Streaking,
Splash Marks) - Problems
• Obstruction in nozzle. • Burr in runner or gate.
• Screw rpm too high. • Cracked mould.
• Back pressure too low. • Trapped volatiles.
• Melt temperature too • Excessive moisture.
high. • Resin contaminated.
• Nozzle too hot. • mould cavity
• Nozzle too small. contamination.
• Gates too small. • Excessive shot size.
• Sprue too small.
• Insufficient venting.

CORPORATE TRAINING AND


PLANNING
Blush

Discoloration generally appearing at gates,


around inserts, or other obstructions
along the flow path. Usually indicates
weak points.

CORPORATE TRAINING AND


PLANNING
Blush - Problems
• mould temperature too cold
• Injection fill speed too fast
• Melt stock temperature too high or too low.
• Improper gate location
• Sprue and nozzle diameter too small.
• Nozzle temperature too low.
• Insufficient cold slug well.
• Sharp Corners in gate area
• Resin excessively moist.
• Inadequate injection pressure.
CORPORATE TRAINING AND
PLANNING
Burn Marks

Black marks or scorch marks on surface


moulded part; usually on the side of the
part opposite the gate or in a deep cavity.

CORPORATE TRAINING AND


PLANNING
Burn Marks - Problems
• Excessive Injection speed • Faulty temperature
• Excessive injection controllers.
pressure. • Frictional burring--gates too
• Inefficient mould small
temperature. • Dead material hung up on
• Excessive amount of screw or nozzle.
volatiles due to improper • Melt stock temperature too
Venting. high or too low.
• Improper gate location • Nozzle diameter too small
• Front zone temperature too • Over-heated heater band
high. • Incorrect screw rpm.
• Screw speed too high.
• Excessive back pressure.
• Compression ratio of screw
too high.

CORPORATE TRAINING AND


PLANNING
Poor Weld Lines (Knit Lines)

Inability of two melt fronts to knit together


in a homogeneous fashion during the
moulding process, resulting in weak areas
in the part of varying severity.

CORPORATE TRAINING AND


PLANNING
Poor Weld Lines - Problems
• Material too cold. • Insufficient mould venting
• Injection speed too slow • Cylinder temperature too
• Entrapment of air at weld low.
line. • Injection back pressure too
• Improper mould design. low.
• Contamination of poorly • Nozzle diameter too small.
dispersed pigments. • Excessive screw flights in
• Core shifting. metering zone.
• mould temperature to low. • Improper gate locations
and/or size.
• Injection speed too slow.
• Distance from gate
• Melt stock temperature to excessive.
low.
• Ineffective flow pattern.
• Injection pressure too low.
• mould release agent (brittle
weld lines).
• Inadequate flow.
CORPORATE TRAINING AND
PLANNING
Voids (Bubbles)

An unfilled space of such size that it


scatters radiant energy such as light.

CORPORATE TRAINING AND


PLANNING
Voids - Problems
• Injection pressure too low
• Packing time too short
• Insufficient feed of material
• mould temperature too low.
• Injection speed too high
• Excessive cushion
• At the side of a rib; rib too thick.
• Runners or gate too small or badly
positioned.

CORPORATE TRAINING AND


PLANNING
Delamination (Skinning)

Surface of the finished part separates or


appears to be composed of layer of
solidified resin. Strata or fish scale type
appearance where the layers may be
separated.
CORPORATE TRAINING AND
PLANNING
Delamination - Problems
• Contamination of resin by additives or other
foreign materials.
• Resin temperature too low.
• Non-uniformity of resin temperature.
• Wrong mould temperature.
• Excessive material moisture.
• Inadequate injection speed.
• Sharp corners at gate.
• Incompatible polymers.

CORPORATE TRAINING AND


PLANNING
Flow Lines and Folds

Mark visible on the finished item that


indicate the direction of flow in the cavity.

CORPORATE TRAINING AND


PLANNING
Flow Lines and Folds - Problems
• Stock temperature too low.
• Runners too small
• Improper gate size and/or location.
• mould temperature too low.
• Inadequate cold slug well.

CORPORATE TRAINING AND


PLANNING
Excessive Warpage/
Shrinkage
Excessive dimensional change in a part
after processing, or the excessive
decrease in dimension in a part through
cooling.

CORPORATE TRAINING AND


PLANNING
Warpage / Shrinkage -Problems
• mould closed time too short. • Parts cool unevenly.
• Inefficient injection forward • Parts underpacked.
time. • Improper gate location.
• Ram speed too high or too • Gate too restrictive
low. • Unequal temperature
• Injection and holding between mould halves.
pressure too high or low. • Non-uniform part ejection.
• Melt temperature • Parts mishandled after
inadequate. ejection.
• Excessive nozzle and • Unbalanced gates on
metering zone temperatures. multiple gated part.
• mould temperature too high • Too many stresses in part.
(for thick wall sections).

CORPORATE TRAINING AND


PLANNING
Black Specks

Particles in the surface of an opaque part


and visible throughout a transparent part.

CORPORATE TRAINING AND


PLANNING
Black Specks - Problems
• Contamination of material.
• Holdup of molten resin moulding machine or mould
runner system.
• Press Contamination.
• Local over-heating in the injection cylinder.
• Defective closure of the nozzle.
• Oxidation by occluded air or inadequate air venting
• mould contains grease.
• Trapped air
• Inefficient injection speed.

CORPORATE TRAINING AND


PLANNING
Brittleness

Tendency of a moulded part to break,


crack, shatter, etc. under conditions which
it would not normally do so.

CORPORATE TRAINING AND


PLANNING
Brittleness - Problems
• mould temperature too high
• Inadequate cooling in gate area
• Gate section of item too thin (gate brittleness)
• Resin too cold.
• Non-uniformity of resin temperature.
• Undried material.
• Contamination.
• Poor part design.
• Material degraded.
• Non-compatible mould release.
• Packing the mould.
• Melt temperature too cold.
• Excessive amounts of regrind.

CORPORATE TRAINING AND


PLANNING
Brittleness - Problems
• Inadequate mould temperature
• Excessive screw rpm
• Excessive back pressure
• Insufficient venting.
• Improper gate location.
• Excessive injection speed.
• Excessive residence timed
• Melt temperature too high.
• Nozzle too hot.
• Injection pressure too low (weld lines).
• Runners and gates in adequate (weld lines).
• Dwell time in the injection cylinder too long (material degraded).
• Material degraded during drying or pre-heating

CORPORATE TRAINING AND


PLANNING
Flash

Excess plastic around the area of the


mould parting line on a moulded
part.

CORPORATE TRAINING AND


PLANNING
Flash - Problems
• mould parting surfaces do not seal properly.
• Injection pressure too high.
• Clamp pressure set too low or projected area
or item too large for clamp pressure of the
machine.
• Injection temperature too high.
• Feed needs adjustment.
• Hold time too long.
• Inadequate mould supports.
• Oversize vents.

CORPORATE TRAINING AND


PLANNING
Blister

Defect on the surface of a moulded part


caused by gases trapped within the part
during curing.

CORPORATE TRAINING AND


PLANNING
Blister - Problems
• Screw rpm too high
• Back pressure too low
• mould temperature too low.
• Gate improperly located
• Insufficient venting.
• Regrind too coarse

CORPORATE TRAINING AND


PLANNING
Crazing

Fine cracks in part surface. May


extend in a network over the surface
or through the part.

CORPORATE TRAINING AND


PLANNING
Crazing - Problems
• Insufficient drying of the material.
• Contamination.
• Injection temperature too high (crazing
accompanied by dis-coloring or yellowing).
• mould surface contaminated
• Inadequate injection speed.
• Inefficient injection forward time.
• Excessive injection pressure.
• mould temperature too low.
• Gate too large.

CORPORATE TRAINING AND


PLANNING
Cracking

Fracture of the plastic material in an


area around a boss, projection, or
moulded insert.

CORPORATE TRAINING AND


PLANNING
Cracking - Problems
• Parts cool too quickly
• moulded-in stress
• Wall thickness too heavy for compound.

CORPORATE TRAINING AND


PLANNING
Low Gloss

Surface roughness resulting from high


speed fill which causes surface wrinkling
as the polymer melt flows along the wall of
the mould.

CORPORATE TRAINING AND


PLANNING
Low Gloss - Problems
• Inadequate polish of mould surface.
• Material or mould too cold.
• Air entrapment.
• Melt index of material too low.
• Improper mould design.
• Wrong injection pressure.
• Excessive injection speed.

CORPORATE TRAINING AND


PLANNING
Low Gloss - Problems
• Inadequate flow.
• Contamination
• Resin excessively moist
• Sprue, runners, and/or gate size too
small.
• Pigment agglomerates.
• Oil or grease on knockout pins.

CORPORATE TRAINING AND


PLANNING
Short Shot

Injection of insufficient material


to fill the mould.

CORPORATE TRAINING AND


PLANNING
Short Shot - Problems
• Insufficient feed, cushion.
• Inadequate injection pressure.
• Inadequate injection speed.
• Insufficient booster or injection high-
pressure time.
• Inefficient screw delay.
• Inadequate injection back pressure.
• Melt temperature too low.
• Cylinder temperature inadequate.
• mould temperature too low.

CORPORATE TRAINING AND


PLANNING
Short Shot - Problems
• Gates, sprues, and/or runners too small.
• Excessive screw flights in metering zone.
• Insufficient venting.
• Improper gate location.
• Melt index of resin too low.
• Excessive clearance between non-return
valve and barrel.
• Screw bridging.
• Injection press of insufficient capacity.

CORPORATE TRAINING AND


PLANNING
THANK YOU

CORPORATE TRAINING AND


PLANNING

S-ar putea să vă placă și