INTRODUCTION
1. Regionalization
2. Pre Planning Consideration
3. Need assessment
4. Plot ratio
5. Design for flexibility and expandability
6. Fulfill the demand function
7. Emphasize on patients focused hospital
8. Focus on energy conservation
9. Intelligent Building
10. Create a healing architecture
11. Hospital architecture
12. Go Green
Healing Architecture: Architecture and design can promote the
healing process by giving patients a psychological and physical
lift.
Intelligent Building: A building that integrates technology and
process to create a facility that is safer, more comfortable and
productive for its occupants, and more operationally efficient for
its owners
Advanced technology: combined with improved processes for
design, construction and operations—provide a superior indoor
environment that improves occupant comfort and productivity
while reducing energy consumption and operations staffing.
Go Green :is a widely used term that can mean something
different to everyone. Going green is simply taking steps to
"conserve energy, reduce pollution and save money."
IMPACTING FACTOR
3. Local regulations
4. Source of finance
5. Choice of technology
6. Climatic Zone
HOSPITAL DESIGNING
1.The main guideline while designing hospital is FORM
FOLLOWS FUNCTION
1. Environment
2. Screened Window
3. 3-4 Separate entrance
4. Exit Point
5. Attractive entrance
6. Traffic flow
7. Corridors
8. Visitors Control
9. Running Physical Part
10. Fire Escape
PLANNING TEAM
1.Hospital Administrator
2.Specialists from various clinical branches
3.Nursing Adviser
4. HR Manager
5.Civil and Electrical Engineers
6.Represntative of local body
7.Senior architect
OBJECTIVE OF PLANNING TEAM
B.NEED ASSESMENT :
1.What is the type of health need
2. For which vulnerable group (Old ,Children ,Women)
3. Economic status and sources of earning
4.Extent of utilization of present health care facilities
5.Level of leadership and motivation among people
6.Housing and education facility for hospital staff family
Bed Planning :
Population =A X S X 100/365 X PO
Where
E. AVAILABILITY OF ELECTRICITY :
1.Electric sub station in close vicinity
2.Availability of three phase electric supply
3.Dedicated electric supply line
4.Standby generator
F. WATER SUPPLY AND SANITATION :
1.Availability deep table subsoil water
2.Adequate water supply (400 Liters/bed/day )
3.Good maintained sewerage system (400 Liters/bed/day )
4.Easy access to sewerage treatment plant
5.Facility for Bio medical waste disposal near by
G.TRANSPORT AND COMMUNICATION :
1.Batter to have close access to Rail head or Bus stand
2.24 Hours public transport and private taxies available
3.Nearby telephone exchange /Line with adequate number of
pairs
4.Easy access to transmission towers for uninterrupted
communication
PROJECT PLANNING AND IMPLEMENTATION
A.PROJECT OUTLINE:
1.Why to undertake the project
2.Justify with statistics
3.Hoe people are going to benefit
4.Acceptance of project by local people
5.Minimum size of project
A.PROJECT OUTLINE:
1.Why to undertake the project
2.Justify with statistics
3.Hoe people are going to benefit
4.Acceptance of project by local people
5.Minimum size of project