DWP FOR PIPING ENGINEERING DEPARTMENT

BỘ PHẬN SOẠN THẢO: PHÒNG THIẾT KẾ PIPING


SOẠN THẢO KIỂM TRA PHÊ DUYỆT

TRƯƠNG NGỌC MINH NGUYỄN HỮU TRƯỜNG TRẦN ĐĂNG KHOA


PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

CONTENTS
1. OBJECTIVE

2. SCOPE OF APPLICATION

DWP FOR 3. REFERENCE DOCUMENT


PIPING
ENGINEERING
DEPARTMENT
4. ABBREVIATIONS

5. ORGANIZATION

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

CONTENTS
6. TASKS AND RESPONSIBILITIES

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


DWP FOR
PIPING
ENGINEERING
8. DESIGN CONTROL
DEPARTMENT

9. DOCUMENT AND DATA CONTROL

10. IMPLEMENTATION AND DISTRIBUTION

ATTACHMENT 1: PIPING EXECUTION PLAN

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

1. OBJECTIVE

This document defines the organization, tasks, preparation of documents,


drawings & specific working procedures adopted in the Piping Department.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

2. SCOPE OF APPLICATION

 The Piping Department Working Procedure (DWP) shall apply to all jobs
performed by Piping Department.

 If there is a need to modify the Project Piping Execution Plan (PEP) (Refer to
Attachment 1) to suit Project needs, prior agreement is to be agreed between
Piping Department Manager and Project Manager.

 The requirements stipulate herein may be tailor to meet specific project


requirements in a form of “Piping Department Quality Control Plan”.

 This procedure does not cover work of personnel contracted out to work within
other organization.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

3. REFERENCE DOCUMENT

ISO 9001 : 2008 Quality Management Systems – Requirements


PVE-DEC-GE-P-01 Procedure Development and Issue
PVE-DEC-GE-P-02 Engineering Inter Discipline Check Procedure
PVE-DEC-GE-P-03 Engineering Document Control Procedure
PVE-DEC-GE-P-04 Design change control procedure
PVE-DEC-GE-P-05 Vendor data review and vendor data incorporation
Procedure
PVE-DEC-GE-P-06 Design control Procedure
PVE-DEC-GE-P-16 Development Of Deliverables Procedure
PVE-DEC-GE-P-11 Checking, Review and Approval of Engineering
Deliverables Procedure
PVE-DEC-GE-P-14 Document, data control and handling Procedure

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

4. ABBREVIATIONS

General definitions are available in the Corporate Quality Manual.

3D CAD Three (3) Dimensional Computer Aided Design Software


AFCApproved for Construction
A/G Above Ground
BOM Bill of Material
C&S Civil & Structural
CADD Computer Aided Design & Drafting
Cat. Category
DNC Design Change Notice
E&I Electrical & Instrumentation
Dwg. Drawing
EFD Engineering Flow Diagram
EPC Engineering Procurement & Construction
FDM Form of Design Modification

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

4. ABBREVIATIONS

GA General Arrangement Drawing


GL Working Guidelines
IDC Inter-Discipline Check
IFR Issued for Review
IFD Issued for Detail Design
IFA Issued for Approval
IFC Issued for Construction
IFI Issued for Inquiry
IFP Issued for Purchase
IOMInternal Office Memo
ISO Isometric
ITB Invitaion To Bid
JSD Job Specification Design
JSS Job Specification Supply
KPI Key Performance Indicator
MR Material Requisition
MTO Material Take-Off

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

4. ABBREVIATIONS

NB Nota Bene
NDE Non Destructive Examination
P&ID Piping and Instrumentation Diagram
PEP Project Execution Plan
PFD Process Flow Diagram
PDMS Plant Design Management System
PDS Plant Design System
PQP Project Quality Plan
PS Pipe Support
QAR Quality Assurance Representative
SK Sketch
SP Specialty (Item)
SPEC Specification
SP Mat SmartPlant® Material
SPS Special Pipe Support
STD Piping Standard (Design)
STC Piping Standard (Construction)

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

4. ABBREVIATIONS

TBT Technical Bid Tabulation


U/G Underground
UID Utility and Instrumentation Diagram
UFDUtility Flow Diagram
VDI Vendor Data Incorporation
VDR Vendor Data Review
WI Work Instructions
WP Working Procedure

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

5. ORGANIZATION

2.1. General
Piping Department is a part of Design engineering and consulting center (DEC) of
the Company (PVE). Piping Department is managed by Piping Department
Manager. Piping Department Manager reports directly to the deputy director of
DEC and director of DEC.

2.2. Piping department organization chart


 The Piping Organization comprises of the following:
 Deputy Director of DEC
 Piping Department Manager
 Piping Department Secretary
 Piping Expert
 Piping Engineering Team
 Piping Stress Analysis & Pipe Support Team
 Piping Design & Layout Team
 3D Administration Team
Refer to Figure 1 on the next page.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

5. PIPING DEPARTMENT ORGANIZATION CHART

PIPING DEPARTMENT ORGANIZATION CHART

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

5. ORGANIZATION

2.3 Piping organization chart on major projects


Piping Project Organization Chart is defined according to the requirements of
projects or proposals. The hierarchy is determined by the Piping Department
Manager. This is shown as in Figure 2.
Piping Lead to be appointed by Piping Department Manager.

The Team includes: (Refer Figure 2 next page).


Lead Piping Engineer
Senior Piping Material Engineer
Senior Piping Designer
Senior Piping Stress Engineer
3D Administrator
Piping Material Engineer
Piping Designer
Piping Stress Engineer
Pipe Support Designer
Draftman
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

5. PIPING ORGANIZATION ON MAJOR PROJECTS

PIPING ORGANIZATION CHART ON MAJOR PROJECTS

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1. Piping department organization chart


All Tasks assign to each post below are subject to change by Piping
Department Manager.
6.1.1. Piping department manager

The Piping Department Manager is responsible for all the organization,


management and performances of this department.

He is also in charge of Department’s future planning, career path and yearly


appraisals of all of his staffs.

Piping Department Manager has the rights to delegate any tasks to any of his
staffs, whomever he deems fit to deliver the job.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.2. Piping Expert

The Piping Expert will be part of the Piping Department. They are responsible for
the tasks as listed below:
Assist and guide other Piping Seniors on all projects as instructed by Piping
Department Manager.

Assist Piping Department Manager to clear any issues arising from project.

Conduct Piping Internal Design Review (aka 3rd party review) as instructed by
Piping Department Manager.

Assist in Department’s Proposal Preparation as instructed by Piping Department


Manager.

Assist in Department’s Training as instructed by Piping Department Manager.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.3. All piping Team – common responsibilities

 The following lists are common tasks and responsibilities of every Teams:
 Prepare his Team Manpower Planning.
 Assist Piping Department Manager in the Department’s Resources
Management (i.e. appraisal, training, promotion and etcetera).
 Perform all internal activities as instructed by the Piping Department
Manager.
 Ensure Flow of General Information for all personnel under his responsibility.
 Manager assignments of all personnel under his Team to relevant projects. In
particular, he ensures that all activities are performed by staff with adequate
technical capabilities.
 Monitor the usage of budget, schedule and quality given to him the projects.
 Nominate Lead form his Team to work on projects.
 Provide additional Staffs to projects (if the need arises) during the critical
phases of the Projects.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6. TASKS AND RESPONSIBILITIES

3.1.3. All piping Team – common responsibilities

 Guide and assists any staff reporting under him if required.


 Assist Piping QAR, WP, Training and Proposal Team in preparing
Department's Yearly Training Plan.
 Assist Piping QAR, WP, Training and Proposal Team in preparing
Department's Design Guidelines, Standards, Work Procedures, Checklist and
etcetera that is relevant to the Section.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.3. All piping Team – common responsibilities

Assist Piping QAR, WP, Training and Proposal Team in preparing Department's
Proposal Preparation.
 Manage continuous improvement of knowledge level in his Team.
 Follow-up of methods and production tools used outside the
company to propose improvements.
 Ensure that all the latest and relevant International Regulations and Standards
is used on all projects that his Team is involved in.
 Monitor the Application of method and procedures relevant to his Team.
 Manage the validation and follow-on of software's used by his Team.
 Conduct Piping Internal Design Review (aka 3rd party review) (see para 8.6)
as instructed by Piping Department Manager.
 Perform Yearly appraisals of his Team.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.4. Piping Design & Layout Team

The Design & Layout Team is responsible for:


 Verify input data from project board, client and relevant parties.
 Prepare plot-plans, equipment layouts and all piping design activities for
proposals.
 Assist Piping Lead for their technical tasks if there is a need.
 Monitor all Design and Support team under him.
 Ensure that standard pipe supports are adequate to the particularities of each
project.
 Conduct site survey and gathering information to serve for design.
 Prepare engineering master documents register (EMDR)
 Model all piping systems by 3D software.
 Prepare piping layout plan, elevations and section drawings.
 Prepare Piping Isometric Drawings for all lines.
 Prepare and update all piping as-built drawings.
 Build databases for Piping Department / DEC
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.5. Piping EngineeringTeam


The Piping Engineering Team is responsible for:
 Review Client’s documentation and ensure they are implemented on the
project.
 Select applicate standards, codes and specification and incorporate them in
job specification.
 Prepare summary of piping class
 Establish piping material specifications and piping standard assemblies
 Provide data for piping components to 3D Administrator
 Prepare valve datasheet and special item datasheets.
 Prepare Material Requisition (MR)
 Prepare Technical Bid Tabulation (TBT)
 Review vendor data document and drawings.
 Prepare job specification for piping fafrication, inspection and testing.
 Follow-up on new piping materials available in the market.
 Provide mechanical data for line list and supervises all MTO activities. This
includes piping insulation, painting, pressure & NDE testing requirements.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.6. Piping Stress analysis and Pipe Support Team

The Piping Stress analysis and Pipe Support Team is responsible for:
 Interface with IT Department with regards to Piping Stress Analysis Software,
CAESAR II on the licensing and usage.
 Prepare and approve Piping Stress Analysis job specification.
 Prepare and approve piping Stress Analysis Report
 Prepare and approve all piping support documents and drawings.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart


6.1.7. 3D Administration Team
The 3D administration Team is responsible for:
 Prepare piping and equipment database/library/specification for 3D Model.
 Perform Piping and equipment clash checking.
 Prepare piping clash report
 Prepare 3D implementation procedure.
 Perform Equipment, Piping and pipe support 3D modeling.
 Conduct Client Model review.
 Interdiscipline modeling and coordination.
 Extract relevant report/document/drawing from 3D system.
 Maintain stability of 3D system.
 Report to piping department manager about license situation: expired date,
how many users used…
 Study all software module to prepare the guide to training, guide for piping
designer
 Study and apply software utilities.
 Study and apply new design software.
 Build databases for Piping Department / DEC
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.1 Piping Department Organization Chart

6.1.8. Secretary
The Secretary reports directly to Piping Department Manager and is responsible
for:
 Manage all administrative works for all Piping Department Staff (e.g. annual
leaves, medical leaves, travel request, time-sheets, claims, and etc.).
 Manage dispatch and filing of correspondence.
 Prepare correspondence relating to department general activities.
 Prepare correspondence relating to projects not organized in task forces.
 In charge of the filing for general documents.
 NB: For projects organized in task forces, the Project Team shall provide the
secretarial resources needed by the Project Piping Team.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2. Piping Organization Chart on major project


6.2. 1 Piping lead Engineer
He reports directly to Piping Department Manager.
He is responsible to the Project Team for all tasks performed by the Piping Project
Team (including Material and Stress, where coordination is concerned) relating to
the project scope of work.
He is the focal point of contact and coordination within the Project Team (Please
refer to Figure 2). He shall assist the Project Manager and Project Engineer to
furnish them with the latest Piping Progress and Input.
He assumes the technical responsibility of all piping design and piping support
activities for his project.
In the case of Stress and Material engineering activities, Stress and Material Lead
Engineers shall take responsibility for their technical aspects. They shall liaise with
the Piping Lead for scope and schedule related activities as well as co-ordination
with Project Team and Client.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2. 1 Piping lead Engineer


He shall undertake the following responsibilities:

Budget, planning & schedule


 Develop Piping Manpower & Man hour Planning with Deliverable List in
coordination with Planning and Piping Department Manager at the early stage
of the Project.
 Review Project Level 2 and 3 schedules. Then, provide feedback to Project or
Planning Team if requested.
 Prepare and identify Project Progress Milestones based on the Schedules
given by Project team.
 Perform the Periodic Piping Progress Measurement.
 Endorse the timesheets and request for leave of his piping team
(OPTIONAL).
 Review Project Contract (Require contract from Project to summarize all
Piping Deliverables).

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2. 1 Piping lead Engineer


Work execution
 Review Project scope documents and arrange for access or issue copy of
relevant documents to his piping team for reference and implementation. Any
subsequent revisions are duly circulated his piping team.
 Prepare and review Job Specifications, Piping Standards (Design and
Construction), Design Instruction and other relevant documents (with the help
of Piping Material and Piping Stress Lead) to be in line with Project
Deliverable List.
 Issue Work Instructions specifically for the project. This is to be distributed to
all of his Piping Member.
 Develop Piping Isometrics Checking, & IFC Issue Schedule based on Level 3
schedule. Following that, he shall establish Weekly Isometric Progress
Tracking System.
 Review all Vendor Data in Piping Job Scope.
 Ensure the Project Document Distribution Matrix is relevant for the activities
of piping team.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2. 1 Piping lead Engineer


Work execution
 Review Project scope documents and arrange for access or issue copy of
relevant documents to his piping team for reference and implementation. Any
subsequent revisions are duly circulated his piping team.
 Prepare and review Job Specifications, Piping Standards (Design and
Construction), Design Instruction and other relevant documents (with the help
of Piping Material and Piping Stress Lead) to be in line with Project
Deliverable List.
 Issue Work Instructions specifically for the project. This is to be distributed to
all of his Piping Member.
 Develop Piping Isometrics Checking, & IFC Issue Schedule based on Level 3
schedule. Following that, he shall establish Weekly Isometric Progress
Tracking System.
 Review all Vendor Data in Piping Job Scope.
 Ensure the Project Document Distribution Matrix is relevant for the activities
of piping team.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2. 1 Piping lead Engineer


Work execution
 Conduct Progress Meetings at regular intervals with his piping member.
 Prepare Progress Reports input as required by the Project Team.
 Attend Project Coordination Meetings and Client Review Meetings when
required.
 Coordinate with Sub-Contracting Department to provide Piping MTO and
necessary Job Specification for Fabrication and Construction contract
 Prepare Internal and Client Scope Change Requests and issue to Project Team
for approval.
 Raise or review DCNs or FDMs of key documents.
 Provide clarifications to Field Engineering Queries and arrange for 'As-Builts'
isometrics where it is required.
 Liaise with his Piping member on issue which requires technical expertise,
updated methods and procedure.
 Review and approve all documents and drawings issued by the Piping Design
and Pipe Support Members.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2.1. Piping lead Engineer


Work execution
 Develop key plans for his area/unit/module.
 Execute the tasks relevant such as: Progress follow-up, task assignment,
planning, coordination with other disciplines.
 Organize internal design and model reviews at regular intervals for his
area/unit/module (i.e. weekly) in preparation for the formal model reviews by
the Project Team.
 Ensure the targets are achieved as planned (e.g., Equipment Layout Issue
Date, Isometrics issuance based on latest P&ID's, 30%, 60% & 90% Model
Review and etc.).
 Submit all documents to be issued for review and signatures prior to official
issue.
 Ensure that all technical issue progressed are solved consistently and aligned
with the project requirements.
 Supervise the work of Piping Designers under his team in terms of progress,
consistency of work and provide guidance if needed.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2.1. Piping lead Engineer


Work execution
 Verify technical documents relevant to his team (e.g. ITB assessment and etc.)
 Ensure of VDR & VDI completion for his project.
 Prepare Hand over to all documents to be issued for review and signature
prior issuing to the Project.
 Verify all IFC isometrics issues are as per the latest revision of P&IDs issued
at that moment of time.
 Ensure that relevant information are cascaded to Piping Designers assigned to
him
 Answer to site queries whenever required.
 Ensure that the documents are archived in accordance with the procedures.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project

6.2.1. Piping lead Engineer


Quality and HSE
 Issue the Piping Discipline PQP (if required by Project Team). He has to
maintain the quality of work is produced as stated in Piping DWP and by the
COMPANY.
 Distribute all correspondence within the piping member.
 With regards to filing, please refer to para IX.7.
3D Model reviews
 Assist Project Team (if required) and attend all 3D Model Reviews organized
by Project Team.
Archiving & close-out report
 Archive of project documents after the job completion.
 Compile all project statistics on matters relating to Piping progress and
deliverables from the start of the project, with regards to man hour spent vs.
budget including all design change orders, material summary report final
weight vs. budget and other salient features of the project.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.2. Senior Piping material Engineer
He reports directly to the Piping Lead for all his piping material activities on a
project.
He supervises and provides technical guidance to all pipe material engineers
reporting to him and is responsible for all technical aspects such as:
 Review Client's documentation and ensure they are implemented on the
project.
 Review the Project Document Distribution Matrix.
 Analyze the Project Procurement & Construction requirements.
 Select applicable standards, codes and specifications and incorporate them in
job specifications.
 Prepare summary of piping classes.
 Establish piping material specifications (piping classes) and piping standard
assemblies.
 Provide data for piping components to 3D Administrator.
 Propose any deviations to the project (technical, cost and delivery).
 Prepare valve data sheets and special item datasheets.
 Prepare Material Requisition (MR).
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.2. Senior Piping material Engineer
 Prepare Job Specifications for Supply (JSS) based on project requirements.
 Prepare Technical Bid Tabulation (TBT).
 Review vendor data documents and drawings.
 Provide mechanical data for Line List and supervises all MTO activities. This
includes piping insulation, painting, pressure & NDE testing requirements.
 Lead and guide a team of piping material engineer and possess excellent
interpersonal communication and writing skills.
 Review and check all works done by Pipe Material Engineers reporting under
him.
 Able to guide Pipe Material Engineers on all matters of Pipe Material.
 Prepare job specifications for piping fabrication, inspection and testing (where
Client specifications are not available).
 Provide data for Project close-out report.
He liaises with the Project Team and Procurement & Vendors where necessary for
all these matters, and copies all correspondence to the Piping Lead.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.3. Senior piping designer
He reports directly to Piping Lead.
Senior Piping Designer shall be able to guide other Piping Designer with good
Piping Design knowledge.
Senior Piping Designer shall route and consider the equipment and piping design
modeled meets the objectives and is accordance with the relevant document
requirements.
His responsibilities shall include but not limited to the following:
 Determining and coordinating interfaces, tie-ins, liaising with client, site
personnel and other engineering disciplines to facilitate design activities.
 Supervising and managing of personnel, piping design activities, planning and
preparing of contract documentation.
 Reviewing and checking of documentation, ensuring deliverables are
produced on time and within job constraints.
 Achieving schedule and producing a quality product, meeting or exceeding
project expectations.
 Answering queries, supporting construction team, resolving construction
issues and field clashes.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.3. Senior piping designer
 Preparing 3D model and performing piping study for all equipment, based on
the followings:
o Make sure latest inputs of Equipment Vendor Data, Equipment Layouts,
Equipment List, Plot Plans, and etc is implemented.
o Maintain conformity with Project Specifications and Requirements, and
with respect to accessibility, operability and maintainability of equipment
e.g. nozzle orientation, equipment elevations, orientation and adequacy
of ladders, service platforms, PSV lines, outlet fire water network for
hydrants, monitors and deluge valves and etc.
o Coordinate closely with Mechanical Equipment Engineer to ensure that
the vendor data are available for all equipment and highlight any missing
data for equipment to the Mechanical Equipment Engineer.
o Perform pipe routing study and modeling of all lines > 2"
o Maintain conformity to P&ID and Line List. He shall ensure that
specific process requirements such as slope, free flow and no pockets etc.
are incorporated.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.3. Senior piping designer
 Preparing 3D model and performing piping study for all equipment, based on
the followings:
o Maintain conformity with JSD for Piping Design, Workplace Design
Specification and Working Instruction.
o Perform incorporation of Stress Calculation Notes into his Piping
Design.
o Consider for Pipe Spacing (insulation thickness, guide and stopper).
o Consider pipe flexibility for stress lines category 1, 2 and 3 in his piping
design activities.
o Prepare adequate operation and maintenance space such as ladders,
stairs and service platforms and etc for valves, flanges, joints and
instruments.
o Perform study, identify and propose pipe support locations, span. Then,
prepare pipe support attachments for issuance to Stress team.
o Prepare reserve volume for equipment removable space model.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6. TASKS AND RESPONSIBILITIES


6.2.3. Senior piping designer
 Preparing 3D model and performing piping study for all equipment, based on
the followings:
o Transfer all changes and mark-up from personal copy onto the Piping
Master Copy (P&ID, Equipment layouts and etc.).
o Responsible to correctly fill in all the model attributes.
o Line attributes to be validated only if the level of maturity is acceptable.
o Solicit advice from either Piping Lead or Piping Checker or
Area/Module/Unit Lead if there is any Piping Design Concerns.
o Ensure 3D Models designed are clash free via coordination with various
disciplines such as E&l, Structural and etc.
o Model Piping Standard Support in 3D Model.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.3. Senior Piping stress Engineer
He reports directly to the Piping Lead for all his stress activities on a project.
He supervise and provide technical guidance to all pipe stress engineers reporting
to him and is responsible for all technical aspects such as:
 Prepare and/ or review Project Job Specification for Pipe Stress Analysis.
 Review and Check all works done by Pipe Stress Engineer under him.
 Provide technical guidance and advice to stress engineers.
 Review the Project Document Distribution Matrix.
 Prepare and/ or review Stress Calculation Notes.
 Prepare and/ or review Project Critical Line List.
 Assist in the preparation of project man-hour estimates and project's manning
requirements, if required.
 Ensure that all work produced by project's Stress Member are adequately
reviewed and checked as per International Codes & Standards (referred by the
Project), PVE's HSE's & QA's requirements, Client's Specifications and the
Project's Requirement.
 Provide inputs to Pipe Support Construction Standards, where necessary.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.3. Senior Piping stress Engineer
 Review Pipe Support Span Chart (prepared by Pipe Support member in the
absence of Client specification).
 Liaise and/ or advise with Piping Designer on matters of pipe routing to
achieve the requirements of a satisfactory pipe stress analysis. This may
include recommendation on position and selection of various support types
(anchors, guides, springs, sliding plates, etc.) for acceptable stress levels and
satisfactory support loads.
 Ensure all critical piping systems are adequately supported and where
necessary, specify spring, sliding plates or other special pipe supports.
 Liaise with Piping Designer on matters of pipe routing to achieve the
requirements of a satisfactory pipe stress analysis. This may include
recommendation on position and selection of various support types (anchors,
guides, springs, sliding plates, etc.) for acceptable stress levels and
satisfactory support loads.
 Ensure that all piping systems are adequately supported and where necessary,
specify spring, sliding plates and other special pipe supports.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.3. Senior Piping stress Engineer
 Liaise with Mechanical Engineers for all matters concerning nozzle loads on
equipment.
 Prepare and/ or review specification, data sheets, MR's, TBT's for special
support items like spring supports, rigid struts, sliding plates, etc; and other
special units like bellows and expansion joints.
 Ensure that he is up-to-date on relevant developments in the field of pipe
stress analysis and flexibility analysis.
 Maintain up-to-date on relevant developments in the field of pipe stress
analysis and flexibility analysis.
 Review the support types and location indicated on the IFC Isometrics in
accordance with approved Stress IFC Isometrics.
 Assist Stress member in preparing updated or improved Stress Section's
standards, procedures and guidelines.
 Delegate any of his own functions or duties to his subordinates to meet
Project's Schedule, when appropriate.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.4. Senior Piping stress Engineer
 Review and prepare assessment of performance of Stress Engineers reporting
under him and make necessary corrective and improvement measures if
necessary.
 Provide data for Project close-out report, when required.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.5. 3D Administrator
 Set-up and maintain 3D project.
 Create, customize and maintain Piping Specs and Component data in 3D.
 Develop and manage 3D project procedures.
 Manage Orthographic Drawing and Isometric deliverables from 3D.
 Create, customize and maintain 3D reports and MTO’s.
 Prepare 3D model reviews for client reviews using Navisworks, AVEVA
Review.
 Preapre piping clash report.
 Act as the focal point for all discipline related 3D enhancements and support
requirements.
 Providing day to day 3D related technical support to engineers and 3D
designers.
 Assist in 3D project closeout activities.
 Customisation of systems and 3D macro writing (PML).
 Managing 3D piping class bolt tables.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.5. 3D Administrator
 Assist the Project Engineering Managers in ensuring that the 3D model is
consistent, easy to navigate and clash free.
 Extract material take-offs from 3D model for uploading to company material
management system.
 Create and set-up 3D drawing borders.
 Set-up ISODRAFT module for generating isometrics as per company and
client standards/procedures. Resolve and trouble shoot isometric errors.
 Set-up and update model review files in NAVISWORKS format at intervals
defined by project requirements.
 Generate Weight and CoG data from 3D model.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.6. Piping material engineer
He reports to Piping Material Lead. His work scope covers but not limited to the
following:
 Select applicable standard, codes and specification and incorporate them in
the job specification.
 Prepare summary of piping classes.
 Establish Piping Material Specification and piping standard assemblies.
 Provide data for piping components to 3D Coordinator.
 Prepare valve datasheets and specialty items datasheets.
 Prepare Material Requisitions (MR).
 Prepare Job Specification for Supply (JSS) based on the project requirements.
 Prepare Technical Bid Tabulation (TBT).
 Review vendor data documents and drawings.
 Provide mechanical data for Line List and supervises all MTO activities. This
includes piping insulation, painting, pressures NDE testing requirements.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.7. Piping designer
He reports to Piping Lead, Piping Deputy Lead and his/her respective
Area/Unit/Module Lead.
Piping Designer shall route and consider the equipment and piping design modeled
meets the objectives and is accordance with the relevant document requirements.
His responsibilities shall include but not limited to the following:
 Prepare 3D model and perform piping study for all equipment, base on the
followings:
o Make sure latest inputs of Equipment Vendor Data, Equipment Layouts,
Equipment List, Plot Plans, and etc is implemented.
o Maintain conformity with Project Specifications and Requirements, and
with respect to accessibility, operability and maintainability of
equipments e.g nozzle orientation, equipment elevations, orientation and
adequacy of ladders, service platforms, PSV lines, outlet fire water
network for hydrants, monitors and deluge valves and etc.
o Coordinate closely with Mechanical Equipment Engineer to ensure that
the vendor data are available for all equipment and highlight any missing
data for equipment to the Mechanical Equipment Engineer.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.7. Piping designer
o Perform pipe routing study and modeling of all lines > 2"
o Maintain conformity to P&ID and Line List, Designer shall ensure that
specific process requirements such as slope, free flow and no pockets etc.
are incorporated.
o Maintain conformity with JSD for Piping Design, Workplace Design
Specification and Working Instruction.
o Perform incorporation of Stress Calculation Notes into his Piping
Design.
o Consider for Pipe Spacing (insulation thickness, guide and stopper).
o Consider on pipe flexibility for stress lines category 1, 2 and 3.
o Prepare adequate operation and maintenance space such as ladders,
stairs and service platforms and etc for valves, flanges, joints and
instruments.
o Perform study, identify and propose pipe support locations, span. Then,
prepare pipe support attachments for issuance to Stress team.
o Prepare reserve volume for equipment removable space model.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.7. Piping designer
o Transfer all changes and mark-up from personal copy onto the Piping
Master Copy (P&ID, Equipment layouts and etc.).
o Responsible to correctly fill in all the model attributes.
o Line attributes to be validated only if the level of maturity is acceptable.
o Solicit advice from either Piping Lead or Piping Checker or
Area/Module/Unit Lead if there is any Piping Design Concerns.
o Ensure 3D Models designed are clash free via coordination with various
disciplines such as E&l, Structural and etc.
o Model Piping Standard Support in 3D Model.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.8. Piping stress engineer
He reports directly to the Senior Piping Stress Engineer (on Projects he is assigned
to) for all stress activities on a project for all tasks pertaining to adequacy of pipe
stress and flexibility analysis, and related piping design activities, and
administration matters.
His responsibilities shall include the following but not limited to:
 Prepare the Job Specification for Stress Analysis.
 Ensure that all work produced are adequately reviewed and checked as per
International Codes & Standards (referred by the Project), PVE's HSE's &
QA's requirements, Client's Specifications and the Project's Requirement.
 Prepare list of critical lines.
 Prepare Stress Calculation Notes.
 Liaise with Piping Designer on matters of pipe routing to achieve the
requirements of a satisfactory pipe stress analysis. This may include
recommendation on position and selection of various support types (anchors,
guides, springs, sliding plates, etc.) for acceptable stress levels and
satisfactory support loads.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.8. Piping stress engineer
 Ensure that all piping systems are adequately supported and where necessary,
specify spring, sliding plates and other special pipe supports.
 Advise his Lead, should there be a need of expansion joints, bellows and other
similar special units.
 Liaise with Mechanical Engineers for ail matters concerning nozzle loads on
equipment.
 Prepare specification, data sheets, MR's TBT's for the supply of Vendor-
supplied special support items like spring supports, rigid struts, sliding plates,
etc; and other special units like bellows an expansion joints.
 Assist in the man-hour estimates for the project and advises the lead Stress
Engineer of the need to amend the project manning requirements, when
required.
 Maintain up-to-date on relevant developments in the field of pipe stress
analysis and flexibility analysis.
 Prepare updates or improved Stress Section Section's standards, procedures or
guidelines, if requested by Stress Team.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.8. Piping stress engineer
 Review the support types and location indicated on the IFC isometric in
accordance with approved Stress isometrics.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.9. Piping support designer
He reports directly to the Senior Piping Designer for all his pipe support activities
on a project.
His responsibilities shall include but not limited to the following:
 Review and identify the pipe support location for all lines.
 Advise Senior Piping Designer on additional required structure such as
trimmer beam and etc.
 Model Piping Special Support in 3D Model.
 Prepare Pipe Support Standard.
 Prepare Pipe Support Job Specification.
 Prepare Pipe Support Span Chart (where Client specification is not
available) with assistance from Piping Stress as necessary.
 Responsible in advising status and progress of Pipe Support activity to
Senior Piping Designer.
 Responsible for validation of Piping Standard support and Piping Special
support.
 Select and identify the pipe supports type and code bases on information
from Stress.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.9. Piping support designer
 Prepare and maintain special pipe support tag list.
 Discuss with structural on the additional beam required such as trimmer
beam if it is required for pipe support design.
 Prepare Vessel Clip Location complete with Force and Moment and
submitted it to Mechanical for further action.
 Ensure all pipe support design refers to the latest codes & Standards and
also follows all Clients requirement.
 Prepare Datasheets for Sliding Plate, Spring Support, Tie Rod & Rigid
Strut and Cold Shoes in collaboration with Piping Stress.
 Identify the anchor location for non-critical lines.
 Assist Piping Designers in the selection of standard supports, if the need
arises.
 Assist Pipe Support Designers in the design of special support, if the need
arises.
 Act as the focal point for the transmission of piping loads to Civil or
Structural

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.9. Piping support designer
 Ensure that the Pipe Support, restraint type and location of Category 3
Piping (stress critical lines) comply with the approved stress isometrics
issued.
 Implement Stress Engineers recommendations on category 2 lines for type
and location of supports and restraints.
 Implement Pipe Support Span Chart for category 1 & 2 lines.
 Prepare MTO for pipe support bulk material.
 In case of Structural Special support, a sketch shall be produced,
completed with loads and provided to Structural for their further action.
 In case of Piping Standard support, ensure the structural steel is available
and suitable for it to be installed.
 In case of Piping Special Support, he needs to design and prepare Piping
Special support book.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

6.2 Piping Organization Chart on Major Project


6.2.10. Piping draftsman
He reports to Senior Piping Designer that he is assigned to and his
responsibilities shall include but not limited to the following:
 Produce 2D drawings with Piping Designer inputs.
 Uphold PVE standards of quality, applicable codes and project & industry
standards and practices.
 Apply PVE's standards of CAD software used.
 Require precise input and validation on all isometrics and drawings
produced.
 Produce sketches autonomously and may coach more junior draftsmen.
 Deliver work to suit Project Schedule.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.1. List of documents / drawings under department responsibility
7.1.1. General
 Job Specifications
 Design Instructions (Internal document)
 Piping Design and Construction Standards

7.1.2. Line List


 Add specific piping information such as: stress category number, piping
insulation, painting details, piping fabrication/inspection details such as
pressure testing, NDE testing to the Process Line List to suit Pipe Stress
Works.
N.B.: Preparation of line list is under the responsibility of Process Department.

7.1.3. Plot Plans


 Overall plot plan
 General plot plan
 Equipment location plan

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.1. List of documents / drawings under department responsibility
7.1.4. Studies
 Piping Routing
 Equipment Piping Studies
 Steam Tracing (when applicable)
 Isometric sketches with support location for Stress Analysis and Process
review

7.1.5. General Arrangement Drawings


 Key plan
 General Arrangement (G.A's)
 Battery limit interface drawings

7.1.6. Isometric Drawings


 Isometric drawings are issued with Piping B.O.M. and support indication.
N.B. : Isometrics are not produced for off-site piping on pipe-racks or
sleepers, on 2D CAD and manual design project unless otherwise specified in
the project scope.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.1. List of documents / drawings under department responsibility
7.1.7. Pipe Supports
 Standard Supports Book
 Special Support Drawings (including Spring Supports, Rigid Struts, Sliding Plates,
Cold Shoes (where necessary)
 Clips on Vessels (clip schedule)
 Pipe Support Location drawings (when it is not shown on Isometrics)
7.1.8. Materials
 Piping Class Summary
 Piping Classes Specification
 Valve and Special Item Datasheets
 Piping Standard Assemblies
 Material Take-off and Summaries (for all A/G piping and U/G pressurized piping)
 Material Requisitions (MR's)
 Technical Bid Tabulations (TBT's)
 Vendor Data Review (VDR's)
 Details of piping quantities and fabrication/inspection testing specifications for
fabrication/construction sub-contract.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.1. List of documents / drawings under department responsibility
7.1.9. Stress Analysis
 List of critical lines
 Calculation reports
 Specifications, datasheets, MR, TBT, VDR for:
o Expansion joints
o Spring and Rod hangers
o Rigid struts
o Sliding plates
o Cold Shoes

7.1.10. Documents particular to Revamping Projects


 Tie-in List
 Demolition drawings
 Site Survey Reports

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.1. List of documents / drawings under department responsibility
7.1.11. Documents particular to Off-Shore Projects
 Hook-Up Datasheets
 Weight Control Reports
 N.B. : When required on a project, the fabrication of a Plastic Model is sub-
contracted, under Piping Department control.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.2. 3D Modeling
3D Modeling of Plant Layout and Piping shall commence after the Plot Plan and
Equipment Location Plan drawings have been issued.
The main tasks associated with 3D modeling are:
 Equipment modeling shall include maintenance envelopes.
 Piping modeling.
 Pipe support (primary & secondary) modeling.
 Clash checking and approval of clashes.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

7. ACTIVITIES PERFORMED BY THE DEPARTMENT


7.3. Numbering system
7.3. 1. Technical Document
The numbering system is defined for each Project in the relevant Project Working
Procedure.
In case the client does not have its own procedure, the numbering system shall be in
accordance with General Working Procedure PVE-DEC-QLDA-M-07 "Manual for
Project Document and Drawing Numbering".

7.3. 2. Correspondence
Refer to General Working Procedure PVE-DEC-GE-P-14 "Document, Data Control and
Handling Procedure ".

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

8. DESIGN CONTROL
8.1. General
The Design Control is described in the General Working Procedure PVE-DEC-GE-P-06
"Design Control Procedure ".
In particular for Piping department, the following shall apply.

8.2. Design and development planning


Piping Lead of each project shall be in charge of this for his project, with reference to
General Working Procedure PVE-DEC-GE-P-06 " Design Control Procedure ".

8.3. Piping execution plan and interfaces


Refer to Work Flow Charts in Attachment 1.
8.4. Input data / Main activities / Deliverables
The input data required by the Piping Department to perform its activities and produce its
contractual deliverables at the various stages of the projects are shown in General
Working Procedure PVE-DEC-GE-P-02 " Engineering Inter Discipline Check
Procedure".
For 3D-CAD systems refer the following General Working Procedure:
 3D Procedure (Implementation Procedure for 3D 3D Design & Modelling).
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

8. DESIGN CONTROL
8.5. Design review
Project Design Review Procedure is defined in the General Working Procedure PVE-
DEC-GE-P-11 "Checking, Review and Approval of Engineering Deliverables Procedure".
During the all stages of Design Review, it is the responsibility of all three (3) Piping
Teams (Design, Stress and Material) with the assistance of Project Piping Lead to review
the major documents/drawings produced by the Department. If he is not able to perform
this task, he shall delegate this to Specialist or Senior Piping Engineer/Designer.

8.5.1. Design
 Job specifications and Design and Construction standards (including support
standards)
 Plot-Plans/Equipment location plans
 Major piping studies
 3D Design Models

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

8. DESIGN CONTROL
8.5. Design review
8.5.2.Material
 Piping class summary
 Piping material class specification
 MTO Summary Management Report
 List of Material Requisitions
 Any one of the MR
8.5.3. Stress
 Job specification
 List of critical lines
 Stress calculations of critical lines
 List of Material Requisitions
 Any one of the MR

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

8. DESIGN CONTROL
8.6. Design verification
With reference to General Working Procedure PVE-DEC-GE-P-06 "Design control
Procedure", the design verification processes are assessed by the following:
All technical software used by the Piping Department are delivered by licensed suppliers.
 Design
o AUTOCAD
o PDMS
o SmartPlant 3D
o Cadworx Plant
 Material Management
o SP MATERIAL
o Office
 Stress Analysis
o CAESAR II
o office
 3D Model review
o Aveva Review
o Naviswork
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

9. DOCUMENT AND DATA CONTROL


Document and data control is govern by the procedure General Working Procedure PVE-
DEC-GE-P-03 "Engineering Document Control Procedure". Other detail procedures as
indicated hereafter.
9.1. Approval and issue
Refer to General Working Procedure PVE-DEC-GE-P-03 "Engineering Document
Control Procedure".

9.2. Checking
 Refer to General Working Procedure PVE-DEC-GE-P-03 "Engineering Document
Control Procedure", for the assignment, qualification and responsibility of the
checker and originator.
 Guidelines for review and checking of piping documents/ drawings are given in the
Department Working Procedures PVE-DEC-PI-P-02 "Design Engineering Control
Procedure for Piping".

9.3. Changes
 For revision status and change identification on documents/drawings, refer to
General Working Procedure PVE-DEC-GE-P-04 "Design change control procedure”.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

9. DOCUMENT AND DATA CONTROL


9.4. Electronic data control
Refer to General Working Procedure PVE-DEC-GE-P-14 "Document, data control
and handling Procedure".

9.5. Numbering system


Refer to General Working Procedure PVE-DEC-GE-M-04 "Manual for project
document and drawing numbering”.

9.6. Filing and archiving


1. Project documentation
 Refer to General Working Procedure PVE-DEC-GE-P-14 " Document, data
control and handling Procedure” for general understanding.
2. Department documentation
 This scope falls under the responsibility of the Piping Department Secretary.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

10. IMPLEMENTATION AND DISTRIBUTION


10.1. Implementation
This DWP comes into force on the date of issue without retroactive effect. The
Department Manager, Department QAR and all three (4) Piping Teams shall
ensure that it is effectively implemented in the department.
10.2. Distribution
This procedure is distributed under controlled conditions to authorized personnel
under the supervision of the PVE Corporate QA Manager.
10.3. Procedure filing
The original copy of this procedure is file with QA Department.
A master copy of the original is kept by the Piping Department QAR. He shall
up-date it constantly with all required modifications (if any) before the original is
revised again and issued in the next revision, if necessary.
10.4. Revision
Each revision of the present procedure shall be written, checked, approved and
distributed under the same conditions as the initial issue.
10.5. Information security
This DWP is classified as "Class B-Confidential" which means it shall not be
disclosed to non-PVE personnel without prior authorization.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

(The Piping Execution Plan (PEP) shall be used on all projects involving Piping.
For customization of this PEP to suit Project needs, see para 2.0)

I. DEFINITIONS OF PHASES
Piping & Layout activities can be split into three phases:
• (After Phase 0 : Feasibility & Basic design, normally before contract
signature)
• Phase I Basic Design Phase: Design specification, standards and plot plan) for
Client's approval, Piping Preliminary Studies development. All equipment
based on preliminary information is located and major process piping routing
incorporated in drawings/3D design models.
• Phase II Detailed Design Phase: Design of piping models and deliverables
based on P&IDs issued IFD by modeling all large bore process lines and
utility lines and taking into account IFD engineering drawings/models of other
disciplines and preliminary selected Vendor's drawings/information.
• Phase III Issued for Construction IFC: Completion of design models and
issuance of IFC deliverables.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

I. DEFINITIONS OF PHASES
Each engineering phase has the following steps:
1. Design and modeling (Phases I through III)
The engineering disciplines work together to complete all work defined for a
specific step as per the required milestones date.
2. Design Review (Phases I through III)
The design developed in each phases is reviewed to ensure that all required
work is complete (and/or pending points clearly identified), that it meets all
contractual requirements and that the Layout is in accordance with good
engineering practices.
3. Interference Check (Phases II and III)
Upon completion of the design review incorporating comments, a complete
interference check shall be performed on the integrated 3D design models.
The interferences shall be validated by resolving all 'hard' clashes
simultaneously approving some of the 'soft' clashes as outlined in the model
review procedure..

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

II. TASKS, DELIVERABLES AND MILESTONES


1. Phase I: Basic design phase
The following engineering design and modeling activities shall be carried out
during Phase I. The deliverables listed below shall be produced as a result of Phase
I activities.
Layout & Piping
Design and Engineering
• Review of BASIC/FEED Stage documents, endorse & amend if needed.
• Review P&IDs/UIDs and line list.
• Review piping tie-in list (at interfaces with others).
• Review piping specialty items list.
• Review general specifications - Inform other disciplines if Client's specific
requirements concern those other disciplines.
• Review piping classes & piping specifications.
• Review plot plan.
• Define the location of the plant reference benchmark(s) with reference
coordinates X, Y & Z.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

• Develop studies and pipe routing for pipe rack.


• Design of major equipment nozzle orientation and platforms, comment vessel
engineering drawings, define vessel clip locations for piping.
• Develop stress criteria and identify stress critical lines (Category 3) to be
calculated.
• Develop stress analysis of critical lines.
• Transmit loads on pipe racks and structures.
• Comment general layout of underground networks.
• Perform and validate the 1st MTO.
• Prepare MR and specification piping packages for purchase of piping bulk
(pipe, fittings, flanges and valves)
• Develop piping technical inquiry package (pipe, fittings, flanges and valves)
• Evaluate piping technical bids (pipe, fittings, flanges and valves)

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

Modeling
• Configure the reference database of the selected 3D system in accordance
with Client's requirements and taking into account the final documentation
files to be transferred to the Client.
• Input piping classes database in 3D System.
• Develop preliminary equipment models.
• Define safety and maintenance access envelopes based on ergonomics.
• Initiate modeling on pipe rack.
• Start modeling main process critical lines and utility lines (> DN150) with
generic piping classes if project piping classes are yet to be established.
• Model all equipment maintenance with Safety/Egress access and drop zones.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

Deliverables
• Job specifications.
• Design standards (piping, support, tracing).
• Constructions standards (piping, support, tracing).
• Piping classes & piping specifications IFD.
• Plot plans IDC (issued for inter discipline checks).
• Plot plans IFD (issued for design) IFA (issued for approval).
• Routing of pipe rack (with loads) (internal document between Civil/Structural
and piping groups).
• Studies (pipe routes for main process lines and utility headers, validated by
stress analysis).
• Stress/Process isometrics (internal document)
• 1st MTO
• U/G MTO
• Piping specifications / requisitions issued for inquiry (IFI) (pipe, fittings,
flanges and valves)
• Piping specialty item list
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

Major Milestones
• Issue of Plot Plan / Equipment arrangement drawings IFD
• Perform 30% model review
• Issue 1st MTO

Inter-Discipline Coordination Check List and Input / Output Data


For details, refer to document General Working Procedure PVE-DEC-GE-P-02
"Engineering Inter Discipline Check Procedure".

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

II. TASKS, DELIVERABLES AND MILESTONES


2. Phase II
The following engineering design and modeling activities shall be planned during
Phase II. The deliverables listed below shall be produced as a result of Phase II
activities.
Layout & Piping
Design & Engineering
• Comment on P&IDs/UIDs and line list (and intelligent P&IDs, if any).
• Prepare complete piping deliverables (at EPC interfaces); validate tie-ins
locations after site survey.
• Update piping classes & piping specifications.
• Maintain Plot plan, equipment location layouts.
• Update studies whenever major revisions occur in PID Rev B (layout changes
affecting other disciplines).
• Comment engineering drawings (vessels).
• Comment guide drawings (civil, steel structure), transmit last data of
loads/efforts on structure.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

• Comment civil installation drawings, defining interface with underground


networks, transmit major data of loads on paving (supports requiring
foundations).
• Comment Vendor's drawings.
• Perform continuation of stress analysis of critical lines.
• Develop complete critical lines stress load data to concrete/steel structures for
design.
• Design main support sketches to C&S for design.
• Develop & validate the 2nd MTO.
• Develop piping technical inquiry package based on 2nd MTO.
• Evaluate piping technical bids.
• Develop specifications for specialty items.
• Prepare piping valve / specialty items specification packages for purchase.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

Modeling
• Update equipment models to based on Vendor data (code 2 or 3 as a
minimum).
• Update all maintenance and safety accesses and drop zones based on vendor
data.
• Route all process lines according to PIDs Rev B, with support locations as
per stress calculations.
• Develop complete routing of all main utilities lines with support locations.

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

Deliverables
• Plot plan issued for construction (IFC).
• Major supports sketches to C&S for design.
• Vessel clip schedule.
• 2nd MTO.
• U/G MTO (revision).
• Revision of requisitions based on 2nd MTO.
• Specialty items issued for design & inquiry, purchasing.
• Complete stress analysis of all category 3 lines.
• Expansion joints inquiry/purchase package.
• Special supports (spring hangers, sliding plates, rigid struts and etc.)
inquiry/purchase package.
• Cold supports inquiry/purchase package.
Major Milestones
• Issue of Plot Plan/Equipment arrangement drawing IFC.
• Perform 60% Model Review.
• Issue 2nd MTO.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)

II. TASKS, DELIVERABLES AND MILESTONES


3. Phase III
Following engineering design and modeling activities shall be planned during
Phase III. The deliverables listed below shall be produced as a result of the Phase
III activities.
Layout & Piping
Design & Engineering
• Perform extraction of 'Check isometrics' and issue progressively for design,
stress, support and MTO checking and validation and update the model.
• Develop complete the routing of all lines.
• Comment miscellaneous platform and ladder design for C&S.
• Comment Vendor drawings. Prepare final stress analysis and preparation of
Calculation Notes (stress reports).
• Design and route all field run lines (including steam tracing/condensate return
headers).
• Develop miscellaneous supports.
• Develop 3rd MTO from IFC isometrics and update MRs as necessary.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

ATTACHMENT 1 (PIPING EXECUTION PLAN)


Deliverables (issued for construction)
• Piping isometrics, including vessel trims.
• Piping drawings (piping orthographic drawings, GA's).
• Piping deliverables associated to revamped zones (pre-shutdown phase &
shutdown phase).
• 3rd MTO.
• Updated of requisitions for pipe, fittings, flanges, valves and etc.
• Updated of requisitions for specialty items.
• Updated of requisitions for (spring hangers, sliding plates, rigid struts,
snubbers, expansion joints and etc.).
• Updated of requisitions for cold supports.
Major Milestones
• 90% Model Review (3rd Review).
• Issue IFC Isometrics.
• Issue IFC Piping GA drawings.
• Issue IFC Pipe Support drawings (including specials).
• Complete 3rd MTO.
• Issue 3rd MTO & Update MRS.
Designed by Trương Ngọc Minh
PETROVIE
PIPING DEPARTMENT
PETRO VIETNAM
PETRO VIETNAM ENGINEERING
ENGINEERING J.S.C
J.S.C

Designed by Trương Ngọc Minh


PETROVIE
PIPING DEPARTMENT

S-ar putea să vă placă și