NHA is custodian of the Highway assets of Pakistan¶s


road network committed to provide a safe, modern and
efficient transportation system. As the cornerstone of
tomorrow¶s Highway network, National Highways function
as the backbone of Pakistan¶s transportation system, play
an important role in the development of micro and macro
economy and also enhance the national integration by
increasing the social and economic dependence between
the Provinces.
Ô   
á   
 
Ô á

National highway improvement program was started to address the


increasing degradation of Pakistan's national highway system by
Government of Pakistan with assistance of World bank providing
74% funds
þontinue..
This program aimed to achieve following objectives.

4 The rehabilitation and improvement of about 550 km


of highways
4 The resurfacing of 306 km of highways
4 Safety improvements at some 15-20 locations
4 Tree planting along the project corridors
4 Improvements in budgeting and road maintenance
policies, streamlining of business processes and
corporate strengthening of NHA.
 Ô á
4 Ñverall objectives of the project were to advance the policy
reform in Pakistan so as to create an enabling environment for
the efficient and sustainable development of the national
highway network.

4 support growth in trade by improving the regional connectivity on


the Asian Highway Network thereby contributing to economic
growth and poverty reduction.

4 Aim of the project was to facilitate the preparation and adoption


of cross border agreements
?
  

Improvement of Pakistan's highways network will not only facilitate
easier access to ports and encourage commercial growth, it will
also play a major role in the Government's efforts to improve the
physical infrastructure so critical for the overall development of
the country. Pakistan's National Highways Improvement
Program, of which this Bank assisted project forms a part, will
also help decrease road user costs by 5%, resulting in a saving
of about Rs189 billion (approx US $3.2 billion) over a six year
period.
Kalsoom Katib
‰ V 


‰ ‰ 
‰  
(         (  
      ( 
    
   
   
     
  !   "


# $ ? %    
&    ?    & 
'     "%  (("


( )  *    ' 


(  *     (+, 
((    !    ("


( -       ( "




( Ô      ( 




Natural Granular Sub


þleaning &
Ground Earthwork Base
Grubbing
þompaction

Tack þoat Asphaltic Aggregate


Prime þoat
Base þourse Base þourse

Asphaltic
þat Eyes &
Wearing Lane Marking
Sign Boards
þourse
?  ?.
? *
4 åollowing are the characteristics of this project.
4 It is a part of National highway N-5.
4 N-5 carries 60 % of entire traffic of the country.
4 It is the life line of Pakistan.
4 80 % of economic activity is being carried out through it.
4 It is a development of trade routes between Punjab and
Khyber pakhtoon khwa.
4 It is built:
þontinue«

Y To provide a safe, modern and efficient


transportation system.

Y To lower the transportation costs.

Y To accommodate the increasing volume of traffic.

Y To provide time efficient access to the central


Punjab.
þost Analysis
Moazma Naseer
Natasha Zahid
PERT Analysis

‡ Ñptimistic time: 1421 days

‡ Expected Time: 1557.33 days

‡ Pessimistic Time: 1662 days


! ?
Risk Assessment/ Key Environmental Issues

4 Resettling of squatters and vulnerable encroachers presently


operating business within the proposed construction limit of the
project corridor
4 Appropriately locating temporary construction camps, asphalt
plants and waste disposal sites and the Environmental impact of
operating these facilities
4 Borrowing of earth-fill and soil erosion
4 Impact of noise generated by vehicles, plants and equipment
during construction and operation.
þontinue«

4 Minimizing the impacts on cultural sites or structures


and community-owned assets during construction
and operation.

4 Ensuring pedestrian and traffic safety during


construction and operation

4 Relocation of squatters from within the proposed


construction limit.
þontrolling

Government of Pakistan has created National Highway


Board for monitoring the development, evaluation and
maintenance of these federalized roads by provincial
Highway Departments.
!  ? 


4 Traffic management problem due to heavy volume of


traffic.
4 Progress on EDR projects have suffered due to abnormal
rainfall giving rise to massive land slides.
4 The damages due to slides increased the quantum of
work on þ-17.
4 The EDR have to be kept open for traffic as diversions
cannot be constructed due to limited space constraints