BULLET TRAIN

RISK MANAGEMENT PLAN


Sebastian I Siddharth I Sneha I Sri Harsha I Srinivasan
MPE 23
RAILWAYS
Route length of 67,368 kms   Route length of 2,764.6 kms
Avg. speed: 50.6 kmph Max speed: 180 kmph Avg. speed: 100 kmph Max speed: 320 kmph
Safety: ~1000 passenger fatalities over 4 years Safety: Zero incidents since inception

2
INTRODUCTION

The Mumbai Ahmedabad High Speed Rail


(MAHSR) is proposed between Mumbai
and Ahmedabad. The total distance is 506
kms with 12 stations; 4 in Maharashtra
and 8 in Gujarat. The estimated budget is
1.1 lakh crores and the targeted
completion date is August 2023.
A Special Purpose Vehicle (SPV) has been
created with participation from Ministry of
Railways and state governments of Gujarat
and Maharashtra.

3
WHY RISK MANAGEMENT

High Speed Train projects are exposed to


risks of different natures and if not
addressed properly can become real
problems. In the case of MAHSR project, the
uncertainty elements are: Social, Politics,
Environment, Land Acquisition and
Technology. This study presents a
framework for categorizing risks and
propose mitigation plans.

4
PROJECT
DELAY
RISKS

5
PROJECT DELAY RISKS

RISK EVENT IMPACT


The project can be delayed due to following: The project can be impacted due to following:

• Litigation by land owners • Revenue Impact


• Delay in land acquisition • Project Feasibility
• Delay in execution • Break-even Impact
• Delayed financial closure

6
FINANCIAL
RISKS

7
FINANCIAL RISKS

RISK EVENT IMPACT


The project can be delayed due to following: The project can be impacted due to following:

• Low occupancy • Revenue impact


• Low Demand • Project feasibility
• Cost overrun • Break-even impact

8
OPERATIONAL &
ENVIRONMENT
AL
RISKS

9
OPERATIONAL & ENVIRONMENTAL RISK

RISK EVENT TOPIC 02


The project can be delayed due to following: The project can be impacted due to following:

• Breakdown due to technology failure • High cost of operation


• Loss of green cover • Agitation & Criticism
• Agitation/ litigation by • Damage to environment
environmentalists

10
HEAT MAP

11
HEAT MAP
Almost Certain Delay in Execution Environmental Joint Venture Technology failure

Likely Delay Costs Government Safety Delay in Land acquisition


LIKELYHOOD

Possible Design System Integration Construction Delayed financial closure

Unlikely Low Demand Litigation by Land owners Project Feasibility

Rare Technology Transfer Cost Overrun Funding Moderate


Minor
Insignificant Minor Moderate Major Critical
Major
CONSEQUENCE Critical

12
COMMUNICATION

13
COMMUNICATION

INTERNAL Interim statutory audit report, submitted to


Japan
Debt & Remittances reports (published in leading
Project Status Reports (PSR) between Gujarat dailies)
and Maharashtra Governments
Certified project status reports, published by
Joint completion status reports of the two state Railways in the compendium & made available in
Governments to Indian Railways railway journal
Application of funds reports from State Regular/ periodic press briefings held by Railways
Governments to Railways to update the status of the project

EXTERNAL

14
THANK YOU !