Documente Cultură
ADVANTAGE KARNATAKA
DISTURBANCES
• VAST IMPROVEMENT IN GRID PARAMETERS
BLR VOLTAGE
• LOSSES REDUCED
TECHNICAL LOSS
OPTIMAL RESERVOIR UTILISATION
SHARAVATHY IN KARNATAKA
THE COST OF GENERATION AT SHARAVATHY IS LESS THAN 20 Ps /UNIT
AVERAGE SELLING UI RATE OF KARNATAKA IS 372 Ps/UNIT
Rs. Rs.
Rs.
Rs.
Rs.
Rs.
Rs. Rs.
PLANT OPERATORS AT
SHARAVATHY THINK OF THE
RESERVOIR LEVEL IN RUPEES
Rs. RATHER THAN IN FEET!!!
Rs. Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
SHARAVATHI GENERATION – TYPICAL DAY
1000 50.40
900
FREQ 50.20
GENERATION IN MW --->
800
50.00
700
FREQ IN HZ--->
49.80
600
500 49.60
400
49.40
300
49.20
200
MW 49.00
100
0 48.80
0 2 4 6 8 10 12 14 16 18 20 22 0
HOURS ---->
UI SUMMARY – 116 WKS
FROM 01/JAN/03 TO 20/03/05)
STATE ---> AP KAR KER TN PON
Average rate of UI in
204 186 173 291 188
paise/unit
INTER-REGIONAL EXCHANGES DETAILS
UPTO 116 WKS (Till 20-MAR-05)
WR ER
300 260
247 6
247
250
205 M
200 5 186 U 178
4 1
2 3 1 8 5 146
150 2 2
M 8 2 3 4
4 M
100 U 7 7 6 6
7 U
4 6 M 7
50 M
M M U M
U
U U U
0
AP KAR KER TN
2500 51.5
FREQUENCY IN HZ --->
Capacity
Actual Drawal Charges
1500 50.5
UI
1000 50.0
500 49.5
Schedule
ά
Energy Frequency
0 Charges 49.0
01:15
02:15
04:15
06:15
07:15
08:15
09:15
10:15
11:15
14:15
17:15
22:15
23:15
00:15
03:15
05:15
12:15
13:15
15:15
16:15
18:15
19:15
20:15
21:15
TIME --->
MAJOR AND MINOR DISTURBANCES SINCE 1994
10
8
NUMBER OF DISTURBANCES -------->
4 MAJOR MINOR
0
1994-95
1996-97
1997-98
1995-96
1998-99
1999-00
2000-01
2001-02
2002-03
2003-04
2004-05
NO DISTURBANCES DESPITE
YEAR ->
LOSING ENTIRE SUPER
GENERATING PLANTS LIKE
RAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI,
SHARAVATHY ETC
COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
420
410
400
390
VOLTAGE IN KV --->
380
350
02:05
03:05
04:05
05:05
07:05
08:05
09:05
10:05
11:05
13:05
14:05
18:05
19:05
20:05
23:05
01:05
06:05
12:05
15:05
16:05
17:05
21:05
22:05
TIME IN HRS --->
WATER SUPPLY TO BANGALORE
PUMPING LOSSES REDUCED
ENORMOUS SAVINGS TO THE
STATE
MOTOR BURNING AND
MAINTENANCE COSTS ALSO
CAME DOWN DRASTICALLY
LOAD LOSS LOSS LOAD LOSS LOSS LOAD LOSS LOSS LOAD LOSS LOSS
(MW) (MW) % (MW) (MW) % (MW) (MW) % (MW) (MW) %
AP 6510 408 6.27 5983 264 4.41 7234 311 4.30 7557 279 3.69
KARNATAKA 4078 265 6.50 4609 237 5.14 5158 228 4.42 5285 183 3.46
KERALA 1928 82 4.25 2227 101 4.54 2479 86 3.47 2453 66 2.69
TAMILNADU 6135 224 3.65 6888 240 3.48 7421 198 2.67 7522 216 2.87
CENTRAL
GENERATING
STATION 472 0 0.00 684 0 0.00 538 0.00 121 0 0.00
SOUTHERN 2315
REGION 19123 979 5.12 20391 842 4.13 22830 823 3.60 3 744 3.21
•*Source : Report of System Studies conducted for Accessing Shunt Compensation requirement in Southern
Region – March 2004 and March 2005 - SREB ,CEA
•** Projected figures