“SH&E Strategic Planning: Maturity-
Criticality Approach to Continuous
Improvement”
prioritize initiatives
Maturity-Criticality Rating Scheme design,
EHS initiatives
needed to address
specific business
needs / response to
environmental
drivers
Effective EHS
planning cannot
occur in a vacuum
Understanding the
key drivers that
impact your
business, the
company culture
& the EHS system
are essential!
Gather all the data you can to understand the state of
your EHS systems
◦ Perception surveys (employee attitudes & safety culture)
◦ Hazard & vulnerability assessments
◦ Needs surveys and analyses
◦ Key performance indicators
◦ Audits and reviews
◦ Behavioral observations
◦ Incident exposure ($$$)
◦ Feedback from the community
◦ Interaction with regulatory agencies
◦ Benchmarking
How effective are your systems?
What are the weaknesses and opportunities?
Is your system aligned with stakeholder expectations?
A “Maturity-Criticality
Approach” can be a useful
tool
Maturity Criticality List of Elements
List of key
OUTPUTS EHS
definitions definitions Calcuated ideas for ranked by
& scoring & scoring MC Scores each MC score
elements
system system element & maturity
Create Create
Identify Identify
PROCESS Maturity Criticality Conduct Prioritize EHS
Process Improvement
FLOW Elements
Rating Rating Review
Opportunities
Elements
Scheme Scheme
elements
Consider company culture aspects
Assessing maturity helps to clarify the current
state of your programs and processes
Useful to use a quantifiable measuring stick:
◦ Design a rating system that makes sense for your
organization
◦ Use definitions that are unique/useful for your industry
Be honest in your assessment
Program maturity can improve or deteriorate
Look for gaps between the current state of your
programs and your vision
◦ Gaps can also be “obstructions” to achieving your
vision (organizational, cultural, process) that must be
taken into account
Maturity Maturity Definition
Score Level
1 Introduction System element does not exist or is in early
stage of development. Major gaps exist
between vision/idealized design and current
state.
2 Informal Early stages of a formal system. Moderate
gaps still exist between vision/ idealized
design and present state.
3 Functional Formal system established. Functions in well-
managed and controlled fashion. Minor or no
gaps exist between vision/idealized design
and present state
4 Model Model process that is a benchmark for others.
Rating a program’s maturity
reveals areas that need to be
further developed and
improved; however:
◦ What do we do if we have many
programs at a low maturity level?
What do we work on first?
◦ Which ones pose the most risk to
the organization if not
adequately developed and
controlled?
◦ Which ones will give us the most
impact for our efforts?
Aids in prioritization by introducing risk into the
planning process
◦ What is the impact to the organization if this
program/process is not effectively implemented?
◦ What are the unintended consequences?
Helps us focus on those program elements that
should be addressed first to bridge the most
critical gaps
Design a criticality rating system appropriate for
your organization
must always
Functional (3) 3 15 21
be closely
assessed Informal (2) 2 10 14
regardless of
M
Introduction
tu
yig
s
aIn
re
c
maturity (1)
1 5 7
Increasing Criticality
Example:
Training Aspect SH&E Training Program (M3/C5)
Maturity Rating
Training Needs Analysis M2 (Informal)
Quality of training content M3 (Functional)
Training participation/attendance M3 (Functional)
Use of computer-based modules M1 (Introduction)
Training documentation system M4 (Model)
Evaluation of training effectiveness M2 (Informal)
Identify
constraints
Determine what
will be required to
bridge the gaps
Is it feasible?
Brainstorm
opportunities
Are there
programs that
need to be
discontinued?
Depends on the company’s goal-setting and
budget process
Give yourself enough lead time to gather
moving 30
M1 30
processes 20 M2
20
M1
M2
out of M1 mH
10
M3
M4
10 M3
and M2
n
tsS
E
le
M4
m
nH
S
E
0
ts
le
0
categorie
s
Driven by Year 1 Maturity Distribution Goal
priority
Year-2 Projected Maturity
Distribution
30 30
M1 M1
20 M2 20 M2
10 M3 10 M3
M4 M4
m
m
H
H
S
E
S
E
n
n
ts
le
ts
le
0 0
Projected and actual improvement in scores:
◦ Average cumulative maturity score (all programs or
categories)
◦ Also used for average MC score
Projected Maturity Transition
4.00
3.00
2.00
1.00
S
o
c
iyM
tu
gA
ra
e
v
0.00
Baseline Year-1 Year-2 Year-3
Goal Goal Goal
Consider risk aspects in your planning process
Be objective and critical when evaluating your
programs and processes
Obtain perspectives from other people in the
organization
Take time to identify the needs of the business and
stakeholders
Adjustments may be needed based on business
needs and environmental factors
Mature processes can deteriorate and all processes
can be improved
Anthony Smith (Co-Author)
Shinko Campos (ZymoGenetics – Retired)
Russell Ackoff & James Leemann (Interactive
Planning)
Suggested Reading:
◦ Re-Creating the Corporation: Design of Organizations
for the 21st Century by Russell Ackoff