Rate Analysis

Rate Analysis of Local Materials


(Typical Example)

Collection of stone and transportation (for 1 cubic meter)


Rate
S.N. Description unit Qty Amount
(Rs)
Collection of stone
1 m-d 1.4 300 420
(Unskilled)
2 Transportation m-d 1 300 300
Sub-total       720
Miscellaneous @ 5%       36
Total 756
Aggregate preparation/ collection & transportation (1 cubic meter)
S.N. Description unit Qty Rate (Rs) Amount
Aggregate preparation
1 (Unskilled) m-d 2.6 300 780
2 Transportation m-d 1 300 300
Sub-total       1080
Miscellaneous @ 5%       54
Total       1134

Sand collection/ washing & transportation (1 cubic meter)


S.N. Description
Rate
unit Qty. Amount
(Rs)
1 Labour (Unskilled) m-d 3.1 300 930
2 Transportation m-d 1 300 300
Sub-total       1230
Miscellaneous @ 5%       61.5
Total       1291.5
Trench excavation in boulder mixed soil
(for 1 cubic meter)
Rate
S.N. Description unit Qty Amount
(Rs)
Labour
1 m-d 1.6 300 480
(Unskilled)
Sub-total       480
Miscellaneous @ 5%       24
Total       504
Rate Analysis (Typical Example)
Trech excvation in boulder mixed soil
(for 1 cubic meter)
S.N. Description of works unit Quantity Rate (Rs) Amount
1 Labour (Unskilled) m-d 1.6 300 480
Sub-total 480
Miscellaneous @ 5% 24
Total 504

Trech excvation (under water) in boulder mixed soil


(for 1 cubic meter)
Rate
S.N. Description of work unit Quantity Amount
(Rs)
1 Agrrigate preparation (Unskilled) m-d 3.2 300 960
Sub-total 960
Miscellaneous @ 5% 48
Total 1008
Rate Analysis (Typical Example)
Earthwork in backfilling boulder mix soil
(1 cubic meter)
Rate
S.N. Description of works unit Quantity Amount
(Rs)
1 Labour (Unskilled) m-d 1.6 300 480
Sub-total 480
Miscellaneous @ 5% 24
Total 504
Stone Solling (1 cubic meter)
S.N. Description unit Quantity Rate (Rs) Amount
1 Labour (Semi-skilled) m-d 0.5 400 200
2 Labour (Unskilled) m-d 1.5 300 450
3 Material stone m3 1.1 741.6 816
Sub-total 1466
Miscellaneous @ 5% 73
Total 1539
Rate Analysis (Typical Example)
Rubble Stone masonry 1:6 Cement sand mortar
(1 cubic meter)
Rate
S.N. Description of works unit Quantity Amount
(Rs)
1 Labour (Skilled) m-d 1.5 500 750
2 Labour (Unskilled) m-d 4.2 300 1260
Material
3 Cement (at site) Bag 2.12 1600 3392
4 Sand m3 0.47 1292 607
5 Block stone m3 1 741.6 742
Sub-total 6751
Miscellaneous @ 5% 338
Total 7088
Rate Analysis (Typical Example)
Plain Cement Concrete (PCC) 1:2:4
(1 cubic meter)
S.N. Description of works unit Quantity Rate (Rs) Amount
1 Labour (Skilled) m-d 1 500 500
2 Labour (Unskilled) m-d 4 300 1200
Marerials
3 Cement (at site) Bag 6.4 1600 10240
4 Aggregate 40mm m3 0.85 1134 964
5 Aggregate 10mm m3 0.15 1134 170
6 Sand m3 0.445 1292 575
Sub-total 13649
Miscellaneous @ 5% 682
Total 14331
Rate Analysis (Typical Example)
Reinforce Cement Concrete (RCC) 1:2:4
(1 cubic meter)
Rate
S.N. Description of works unit Quantity Amount
(Rs)
1 Labour (Skilled) m-d 1 500 500
2 Labour (Unskilled) m-d 4 300 1200
4 Cement (at site) Bag 6.4 1600 10240
5 Aggregate (40mm) m3 0.85 1134 963.9
6 Aggregate (10mm) m3 0.15 1134 170.1
7 Sand m3 0.445 1292 575
8 Rod (at site) kg 60 125 7500
Sub-total 21149
Miscellaneous @ 5% 1057
Total 22206
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
INTAKE/ WEIR STRUCTURE
S.N. Description of works Unit Quantity Rate Amount
1 Site Clearance L.S. ..... ..... .....
2 Excavation under shallow water m3 ..... ..... .....
3 Dry stone masonry m3 ..... ..... .....
4 Stone masonry (1:4) m3 ..... ..... .....
5 Gabion work m3 ..... ..... .....
6 Concrete (PCC) m3 ..... ..... .....
7 RCC m3 ..... ..... .....
8 Trashrack Kgs ..... ..... .....
......... ..... ..... ..... .....
TOTAL
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
HEADRACE CANAL LENGTH ......m
S.N. Description of works Unit Quantity Rate Amount
1 Site Clearance L.S. ..... ..... .....
2 Excavatiion works in ordinary soilm3 ..... ..... .....
3 Excavatiion works in soft rock m3 ..... ..... .....
4 Excavatiion works in mixed soil m3 ..... ..... .....
5 Stone Soling m3 ..... ..... .....
6 Concrete (PCC) (1:2:4) m3 ..... ..... .....
7 RCC (1:2:4) m3 ..... ..... .....
8 Stone masonry (1:4) m3 ..... ..... .....
9 Plastering works 12mm (1:4) m2
10 Gabion works ..... ..... ..... .....
......... ..... ..... ..... .....
TOTAL ..... ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
GRAVEL TRAP WITH SPILLWAY
S.N. Description of works Unit Quantity Rate Amount
1 Site Clearance L.S. ..... ..... .....
2 Excavatiion works in ordinary soilm3 ..... ..... .....
3 Stone Soling m3 ..... ..... .....
4 Concrete (PCC) (1:2:4) m3 ..... ..... .....
5 RCC (1:2:4) m3 ..... ..... .....
6 Stone masonry (1:4) m3 ..... ..... .....
7 Plastering works 12mm (1:4) m2
8 Sluice gate/ Flushing cone Nos ..... ..... .....
......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
SETTLING BASIN
S.N. Description of works Unit Quantity Rate Amount
1 Site Clearance L.S. ..... ..... .....
2 Excavatiion works in ordinary soilm3 ..... ..... .....
3 Stone Soling m3 ..... ..... .....
4 Concrete (PCC) (1:2:4) m3 ..... ..... .....
5 RCC (1:2:4) m3 ..... ..... .....
6 Stone masonry (1:4) m3 ..... ..... .....
7 Plastering works 12mm (1:4) m2 ..... ..... .....
8 Sluice gate Nos ..... ..... .....
.. ......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
FOREBAY
S.N. Description of works Unit Quantity Rate Amount
1 Site Clearance L.S. ..... ..... .....
2 Excavatiion works in ordinary soilm3 ..... ..... .....
3 Stone Soling m3 ..... ..... .....
4 Concrete (PCC) (1:2:4) m3 ..... ..... .....
5 RCC (1:2:4) m3 ..... ..... .....
6 Stone masonry (1:4) m3 ..... ..... .....
7 Plastering works 12mm (1:4) m2
8 Fine Trashrack Set
9 Sluice gate/ Flushing cone Nos ..... ..... .....
.. ......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
ANCHOR BLOCK
S.N. Description of works Unit Quantity Rate Amount
1 Excavatiion works m3 ..... ..... .....
2 Stone Soling m3 ..... ..... .....
3 Concrete (PCC) (1:3:6) m3 ..... ..... .....
4 Reinforced Steel Kgs ..... ..... .....
5 Stone masonry (1:4) m3 ..... ..... .....
.. ......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
SUPPORT PIER
S.N. Description of works Unit Quantity Rate Amount
1 Excavatiion works m3 ..... ..... .....
2 Stone Soling m3 ..... ..... .....
3 Stone masonry (1:6) m3
4 Concrete (PCC) (1:3:6) m3 ..... ..... .....
5 C- clamp with nut & bolts set Nos ..... ..... .....
6 Base plate Nos ..... ..... .....
.. ......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
POWERHOUSE BUILDING
S.N. Description of works Unit Quantity Rate Amount
1 Site Clearance L.S. ..... ..... .....
2 Excavatiion works m3 ..... ..... .....
3 Stone Soling m3 ..... ..... .....
4 Stone masonry in mud mortar m3 ..... ..... .....
5 Concrete (PCC) (1:2:4) m3 ..... ..... .....
6 Wooden Door & Frame m3 ..... ..... .....
7 Wooden Windows & Frame m3 ..... ..... .....
8 Wooden Roofing truss m2 ..... ..... .....
9 26 Gauge CGI roofing m2 ..... ..... .....
10 Plastering m2 ..... ..... .....
11 Painting m2 ..... ..... .....
12 Hinge, nail, washer, lock L.S.
.. ......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Civil works
TAILRACE & MACHINE FOUNDATION
S.N. Description of works Unit Quantity Rate Amount
1 Excavatiion works m3 ..... ..... .....
2 Stone Soling m3 ..... ..... .....
3 Concrete (PCC) (1:2:4) m3 ..... ..... .....
4 RCC (1:2:4) m3 ..... ..... .....
5 Stone masonry (1:4) m3 ..... ..... .....
6 Plastering 12 mm (1:4) m2 ..... ..... .....
7 Base Frame Set ..... ..... .....
8 Anchor bolts & nut set Set ..... ..... .....
.. ......... ..... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Mechanical works
Mechanical items
S.N. Description of works Unit Quantity Rate Amount
Turbine (Crossflow/ Pelton),
set ..... ..... .....
..Size ........kW complete set
Turbine base frame set ..... ..... .....
1
Adapter set ..... ..... .....
Fondation bolt & nut set ..... ..... .....
Valve .. size ... dia .. set ..... ..... .....
Power Transmission set ..... ..... .....
Pulley .... size on Turnibe set ..... ..... .....
2
Pulley .... size on Generator set ..... ..... .....
Belts/ Coupling set ..... ..... .....
Penstock pipe
MS /HDPE... size,... dia.... m ..... ..... .....
Expansion Joint, size... dia. set ..... ..... .....
3 Vent pipe size... dia.... nos ..... ..... .....
Nut & Bolts Penstock fitting nos ..... ..... .....
O-ring / Gasket nos ..... ..... .....
Paints m2 ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Electrical works
Electrical items
S.N. Description of works Unit Quantity Rate Amount
Generator (Type...., ......Phase,
.......Hz) Size ........KVA set ..... ..... .....
complete set
1
Generator base frame Nos ..... ..... .....
Generator mountings Nos ..... ..... .....
Fondation bolt & nut Nos ..... ..... .....
Protection & Control System ..... ..... .....
ELC/IGC, Capacity ........ kW set ..... ..... .....
Balast Unit Capacity ........ kW set ..... ..... .....
Control Panel with accessories set ..... ..... .....
Main switch ..... Amp, ..... phase
MCCB ..... ..... .....
2
Insullation tape Roll ..... ..... .....
Earthing plate ......... size set ..... ..... .....
Earthing wire, m ..... ..... .....
Lightining Arrestors Nos ..... ..... .....
Salt Kg ..... ..... .....
Coal Kg ..... ..... .....
Bill of Quantity (BOQ)
Electrical items
Wiring ..... ..... .....
PH wiring L.S. ..... ..... .....
3
Cable, Size..... Roll ..... ..... .....
Armored Cable, Type...., Size ..., m ..... ..... .....
Conductors ..... ..... .....
Dog m ..... ..... .....
Rabbit m ..... ..... .....
4
Weaseal m ..... ..... .....
......... ..... ..... ..... .....
Service wire type... size.... ..... ..... .....
Fittings ..... ..... ..... .....
D-iron, nut bolts set ..... ..... .....
5 Pin Insulator & fitting set ..... ..... .....
Disc Insulator & fitting set ..... ..... .....
Stay & Stay wire size..... dia.. set ..... ..... .....
Pole Type / size... Nos ..... ..... .....
6 Cross arm & fitting set ..... ..... .....
Bitumen paint ltr ..... ..... .....
Transformer kVA... Phase .... set ..... ..... .....
7
Transformer kVA... Phase .... set ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Tools & Spare
Tools and Spare items
S.N. Description of works Unit Quantity Rate Amount
1 Turbine bearings Set ..... ..... .....
2 Belts Set ..... ..... .....
3 Nut bolts Nos ..... ..... .....
4 Gasket Set ..... ..... .....
5 Panel meter Nos ..... ..... .....
6 Generator Rectifiers Nos ..... ..... .....
7 Fuses Nos ..... ..... .....
8 Insulator set ..... ..... .....
9 Conductors m ..... ..... .....
General Maintenance
10 ..... ..... .....
Tools set set
,, ....... ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Transportation works
Transportation Items
S.N. Description of works Unit Quantity Rate Amount
Preparation &
1 L.S. ..... ..... .....
Packing
2 By porter Kgs ..... ..... .....
3 By Horse/ Mule Kgs ..... ..... .....
4 By Truck Kgs ..... ..... .....
5 By Helicopter Kgs ..... ..... .....
6 Load unload LS. ..... ..... .....
TOTAL ..... ..... .....
Bill of Quantity (BOQ)

Bill of Quantity for Training, Testing & Commissioning works


Training & Testing Items
S.N. Description of works Unit Quantity Rate Amount
1 Training for Operator m.d ..... ..... .....
Test/ Commissioning of Mechanical
2 m.d ..... ..... .....
Components
Test/ Commissioning of Civil
3 m.d ..... ..... .....
Components
Test/ Commissioning of Electrical
4 m.d ..... ..... .....
Components
TOTAL ..... ..... .....
Bill of Quantity (BOQ)
Bill of Quantity for Installation works
Installation Items
S.N. Description of works Unit Quantity Rate Amount
Installation of Mechanical components
Labour m.d ..... ..... .....
1
Technical m.d ..... ..... .....
Supervision m.d ..... ..... .....
Installation of Mechanical components
Labour m.d ..... ..... .....
2
Technical m.d ..... ..... .....
Supervision m.d ..... ..... .....
Construction of Civil components
3
Supervision m.d ..... ..... .....
TOTAL ..... ..... .....
Total Project Cost Estimate
Cost Summary
S.N. Description of works Amount
1 Civil Works .........
Intake /weir .....
Gravel trap/ spillway .....
Headrace .....
Settling basin .....
Forebay .....
Anchor block/ Support Piers .....
Powerhouse .....
Machine foundation/ Tailrace .....
2 Mechanical Works ......
Turbine .....
Power Transmission .....
Penstock pipe .....
3 Electrical Works ......
Generator .....
Protection & Control System .....
Conductors .....
Poles & Fittings .....
Transforment .....
4 Tools and Spere Parts ......
5 Transportation ......
6 Installation ......
7 Training ......
8 Testing & Commissioning ......
TOTAL ......