PRE TENDER
1
* THIS SLIDE CAN BE REMOVED *
STANDARD OPERATING PROCEDURE –
PRE TENDER
13.0 Scope of Works
13.1 Infrastructure
13.1.1 - Site Clearance, Earthworks, Road, Drainage, Sewer, Sewerage
Treatment Plant,Water Supply
13.2 Structural
13.2.1 - Building Works
13.2.2 - Marine Works – Jetty, Ramp, Pontoon, Light Beacon
13.2.4 - Bridge
13.3 Reclamation Works, Slope Protection i.e. Stone Revetment
13.4 Dredging Works
13.5 Highway/Road Works
13.6 Structural Repair
13.7 Mechanical and Electrical Works
14.0 Establish Design Concept - (Prepared/Checked/Approved Process -
Discussion and Presentation / Client Approval)
14.1 - Conceptual Plan/Design Loading/ Compile Calculation/Assumption
14.2 - Estimated Project cost/Preliminaries Detail Abstract (PDA)
2
* THIS SLIDE CAN BE REMOVED *
STANDARD OPERATING PROCEDURE –
PRE TENDER
3
* THIS SLIDE CAN BE REMOVED *
MAIN CLIENT
LOGO
PROJECT TITLE
REPORT/DOCUMENT TITLE
COVER
PARTNER LOGO
(if any)
Ref No: ACE/XXXX-XX(X) ppt XX rev XX
dd/mm/yy
MAIN CLIENT Document Control Slide
LOGO
Project Title: Project Ref:
Document Title:
Client: Client’s Representative:
Classification
Yes/No Open
Yes/No Internal
Yes/No Proprietary
No. Of Copies
Distribution:
Soft Copy Hard Copy
This document, and information or advice which it contains, is provided by Arsea Consulting Engineers Sdn Bhd solely for internal use and reliance by its Client in performance of Arsea Consulting Engineers Sdn Bhd duties and liabilities under its contract with the Client. Any advice, opinions, or recommendations
within this report should be read and relied upon only in the context of the report as a whole. The advice and opinions in this report are based upon the information made available to Arsea Consulting Engineers Sdn Bhd at the date of this report and on current standards, codes, technology and construction
practices as at the date of this report. Following final delivery of this report to the Client, Arsea Consulting Engineers Sdn Bhd will have no further obligations or duty to advise the Client on any matters, including development affecting the information or advice provided in this report. This report has been prepared
by Arsea Consulting Engineers Sdn Bhd in their professional capacity as Consulting Engineers. The contents of the report do not, in any way, purport to include any manner of legal advice or opinion.This report is prepared in accordance with the terms and conditions of Arsea Consulting Engineers Sdn Bhd’s
contract with the Client. Regard should be had to those terms and conditions when considering and/or placing any reliance on this report. Should the Client wish to release this report to a Third Party for that party’s reliance, Arsea Consulting Engineers Sdn Bhd may, at its discretion, agree to such release
provided that:
(a) Arsea Consulting Engineers Sdn Bhd’s written agreement is obtained prior to such release, and
(b) By release of the report to the Third Party, that Third Party does not acquire any rights, contractual or otherwise, whatsoever against Arsea Consulting Engineers Sdn Bhd and Arsea Consulting Engineers Sdn Bhd, accordingly, assume no duties, liabilities or obligations to that Third Party, and
(c) Arsea Consulting Engineers accepts no responsibility for any loss or damage incurred by the Client or for any conflict of Arsea Consulting Engineers Sdn Bhd interests arising out of the Client’s release of this report to the Third Party.
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
SEPERATOR TITLE
PARTNER LOGO
(if any)
MAIN CLIENT
CLICK TO ADD SLIDE TITLE
LOGO
SLIDE CONTENT
images, description, drawings etc
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO PROJECT INFORMATION
Project Title
Contract Contract
Number Period
Contract Sum
Site Completion
Possession Date
LAD
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
CLIENT
CLIENT’SORGANISATION
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
LIST OF CONSULTANT
ARCHITECT
M&E LOGO
LOGO
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
LIST OF APPOINTED EXTERNAL DESIGNER
DESIGNER’S DESIGNER’S
LOGO LOGO
DESIGNER’S DESIGNER’S
LOGO LOGO
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
LIST OF APPOINTED DESIGN AUDITORS
DESIGNER DESIGNER
AUDITOR’S AUDITOR’S
LOGO LOGO
DESIGNER DESIGNER
AUDITOR’S AUDITOR’S
LOGO LOGO
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
LOCAL AUTHORITIES
LOCAL
AUTHORITY LOCAL
(EARTHWORK) AUTHORITY
LOGO (ROAD) LOGO
LOCAL LOCAL
AUTHORITY AUTHORITY
(SEWER) (WATER)
LOGO LOGO
DESIGNER NAME DESIGNER NAME
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
CONTRACTOR
CONTRACTOR
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
LIST OF SUPPLIER
SUPPLIER SUPPLIER
LOGO LOGO
SUPPLIER
SUPPLIER
LOGO
LOGO
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
SCOPE OF WORK
To describe :-
PARTNER LOGO
(if any)
MAIN CLIENT
LOGO
PROGRESS PHOTO
1. Structure
o Building
o Marine Structure, jetty, etc
o Foundation / piling
2. Infrastructure
o Earthwork
o Roadwork
o Drainage (OSD, etc)
o Sewerage (STP, septic tank, etc)
o Water Supply ( Elevated Water Tank, Suction Tank, pump house)
PARTNER LOGO
(if any)
Background Option
18
19
20
21
22
23
24
25
26
27
28
29
30
* To get info from ARSEA Database/ Project Diary
ARSEA ‘S ORGANIZATION CHART 31
TOPOGRAPHICAL/ BATHYMETRIC/ PIPELINE ROUTE SURVEY AND DETECTION OF
EXISTING SERVICES
(Referance Made Admiralty Chart/Topographic Map/Satelite Photograph)
SURVEY WORKS 32
SCOPE OF WORKS: -
o List of SI Contractor
o Government Project
o Private project
o Scope of Works
o Field Works - Borehole No. / Lab Testing
o Mackintosh Probe
o Term Of Referance (TOR)
o Bill Of Quantities
o Quotation
o Evaluation
o Estimate and Duration - Client Approval
o Recommendation
PCA
REPORT PREPARE
(DCS) CLAIM
FINANCE
ENGINEER
)
CS
PY r, D
CO ette
AL
erL I TI
ov IN
(C P
A M
ST CLAIM To Sign By
Ir. (Resource)
NO CLAIM
RECORD RECORD
PROJECT FILE PROJECT DESPATCH DOCUMENT
(COVER) SERVER (Cover Letter, DCS Report)
-REPORT ARCHIVE LIBRARY- (DCS/REPORT)
ADMIN (SOFT / HARD)
LOGISTIC PROJECT
MANAGER
YES
NO
DRAWING TRANSMITAL RECORD
(DTR) FLOW CHART
PREPARE CHECK
DECISION DRAWING DRAWING
TO DRAW
DRAUGHTPERSON
ENGINEER ENGINEER
DRAWING
DRAWING APPROVAL
DRAWING RECORD
(A4 / DTR) STORAGE
ENQUIRE
LOCATION IR. / PROJECT
LOGISTIC MANAGER
DRAUGHTING
(TECHNICAL)
(SOFT / HARD)
DIRECTOR
(4) (5)
REGISTER PDF SUBMITTED
DRAWING/DESIGN DRAWING/DESIGN
(SUBMISSION) -PROJECT
-PROJECT MONITORING MONITORING
-AUTHORITY SUBMISSION -AUTHORITY
ENGINEER SUBMISSION
ENGINEER/IT/ADMIN
LOCATION TEMPLATE FILE
SUBMISSION
\\192.168.1.8\admin\ARSEA
TECHNICAL\ARSEA (9)
Projects\CONFIRMED (6) REVISED
PROJECTS\”NEGERI”\”PROJECT PDF RECEIVED SUBMISSION
CODE SUBMISSION REPLY DOCUMENT
FOLDER”\02.TECHNICAL\PROJECT
MONITORING\AUTHORITY ENGINEER/IT/ADMIN DIRECTOR
SUBMISSION
(7)
REGISTER REPLY
FILL IN SKP -PROJECT
MONITORING
YES
-AUTHORITY
NO SUBMISSION
ENGINEER/LOGISTIC
SOFTWARE : e.g. (Mesh)
AUTHORITY SUBMISSION : (Lulus / Tidak Lulus)
TOTAL DEVELOPMENT AREA : e.g. (30 acres)
EIA APPROVAL : Ref. No.
STATUS DESIGN STAGE : e.g. (30%)
INFRASTRUCTURE - EARTHWORK 43
SOFTWARE : e.g. (Mesh)
AUTHORITY SUBMISSION : (Lulus / Tidak Lulus)
ON SITE DETENTION POND AREA: Length x width x depth
PRE AND POST VOLUME: Cubic meter
TYPE OF OSD: Dry or Wet Pond
STATUS DESIGN STAGE : e.g. (30%)
INFRASTRUCTURE - DRAINAGE 47
SOFTWARE : e.g. Mesh
AUTHORITY SUBMISSION : (Lulus / Tidak Lulus)
SEWER PIPE TYPE : e.g. VCP
MIN./MAX PIPE SIZE : e.g. 225mm/300mm
STP TYPE : e.g. Centralized/BI-ACT SCABA
POPULATION EQUIVALENT : 4000PE
LAND REQUIREMENT : Acres
STATUS DESIGN STAGE : e.g. (30%)
INFRASTRUCTURE - SEWERAGE 48
SOFTWARE : e.g. Mesh
AUTHORITY SUBMISSION : (Lulus / Tidak Lulus)
WATER DEMAND : gpd
SUCTION TANK : 1/3
ELEVATED WATER TANK : 2/’3
REQUIRED RESIDUAL PRESSURE : e.g. 8 meter
AVAILABLE PRESSURE HEAD : e.g. 15 meter
PIPE MATERIAL - INCOMING : e.g. M.S. Pipe
- DISTRIBUTION : e.g. HDPE
PUMPING SYSTEM : Capacity
STATUS DESIGN STAGE : e.g. (30%)
BRIDGE WORKS 55
SOFTWARE : e.g. Mesh
AUTHORITY SUBMISSION : (Lulus / Tidak Lulus)
TIDAL RANGE HAT/LAT : --- m/ ----- m, CD/LSD
AREA OF RECLAMATION : Acres
VERTICAL DRAIN SPACING : e.g Square Pattern @ 1m c/c
TOTAL FILL VOLUME : Cubic meter
STATUS DESIGN STAGE : e.g. (30%)
RECLAMATION WORKS 56
SOFTWARE : e.g. Slope W
AUTHORITY SUBMISSION : (Lulus / Tidak Lulus)
TIDAL RANGE HAT/LAT : --- m/ ----- m, CD/LSD
SLOPE ANGLE/SLOPE RATIO: e.g. 2 : 1
DESIGN WAVE HEIGHT : e.g 1.5m
ARMOUR LAYER/SECONDARY LAYER : e.g. 200 to 250kg/20 to 25kg
TOTAL LENGTH : e.g 1500m
STATUS DESIGN STAGE : e.g. (30%)
DREDGING WORKS 58
* Insert description and PDF drawings*
STRUCTURAL REPAIR 59
SCOPE OF WORKS
STATUS DESIGN STAGE : e.g. (30%)
DRAFTING
• To get info from ATP: -
.. Standard Quality Plan 1. DESIGN STANDARD QUALITY PLAN 06. SECTION 5- CHRONO
AUTHORITY SUBMISSION AND LOG RECORDS
PARTNER LOGO
(if any)
• To get info from ATP: -
.. Standard Quality Plan 1. DESIGN STANDARD QUALITY PLAN 06. SECTION 5- CHRONO
AUTHORITY SUBMISSION AND LOG RECORDS
CHRONOLOGY : CORRESPONDENCE 65
MAIN CLIENT
LOGO
CHRONOLOGY : CORRESPONDENCE
No Title Reference No. Date Received Remarks
PARTNER LOGO
(if any)
• To get info from ATP: -
.. Standard Quality Plan 1. DESIGN STANDARD QUALITY PLAN 06. SECTION 5- CHRONO
AUTHORITY SUBMISSION AND LOG RECORDS
PARTNER LOGO
(if any)
• To get info from ATP: -
.. Standard Quality Plan 1. DESIGN STANDARD QUALITY PLAN 06. SECTION 5- CHRONO
AUTHORITY SUBMISSION AND LOG RECORDS
PARTNER LOGO
(if any)
• To get info from ATP: -
PARTNER LOGO
(if any)
• To get info from ATP: -
PARTNER LOGO
(if any)
• To get info from ATP: -
PARTNER LOGO
(if any)
o Environmental Impact Assessment Guidelines For Coastal And Land
Reclamation
o A Handbook of Environmental Impact Assessment Guidelines
o Environmental Impact Assessment Guidelines For Fishing Harbour
and/or Land Based Aquaculture Projects
o Department Of Environment Ministry Of Science, Technology and
Environment Malaysia – Dec. 1998
o Department Of Environment Ministry Of Science, Technology and
Environment Malaysia
o Department Of Environment Ministry Of Science, Technology and
Environment Malaysia – sep. 1995
o Preliminary EIA
o Detail EIA
o Micro EIA – Sensitivity Area
Class 1 – Class 4 (Slope/Area/Land Development/ Reclamation)
o Term Of Referance (TOR) – JAS Approval
o List of EIA Consultant – Registered With JAS
o Cost Estimate and Duration - Client Approval
DRAINAGE REFERENCE 80
o The geometric design will follow
o Pavement design
o Traffic Control Devices and Road side Furniture such as directional signs
and pavement markings
o Reinforced box culverts
o Arahan Teknik (Jalan) 8/86
o A Guide to Geometric Design Of Roads’ and Road Eng. Association Of
Malaysia (Ream)– GL 2/2002
o Standard Road Specification JKR/SPJ/1988 and Arahan Teknik (Jalan) 5/85
o JKR Arahan Teknik (Jalan) 2A185, 28/85, 20/85 and 2E/87
o BS 8110 &loading BS 5400:Part 2
ROADWORKS REFERENCES 81
o Survey drawing – Topography/ Bathymetric
o Detection of Existing Services
o Soil Investigation Report
o Conceptual plan/Preliminary design / Assumption/ Architech layout plan/ EIA
Report/ Boundary/Building Set back/ Cut and Fill/ Soil Improvement/ Vertical drain/
Surcharge
o Slope
– Natural by gradient/Treatment/ Retaining structures
– R.C retaining wall, Key stone, Crib R.C. Wall, Gabion, Soil nailing
o Erosion Sedimentation Control Plan (ESCP) Report – JPS Approval
o Catchment Area/Washthrough/Silt Trap/Earth Drain/Silt Fence/Check Dam/ Cut and
Fill etc./ EMP program
o Road Geometric – Urban/Rural/Road structure – No of carriageway, Sub grade, Sub
base, Base, Binder coarse, Wearing coarse/ Gradient / Junction Improvement –
accelaration/ deceleration lane
o Material i.e. ACW, Premix, Reinforced concrete, Interlocking/ Road furniture –
signages and kerbs
o Prepared/Checked/Approved Process – Discussion and Presentation / Client
Approval
o Submission Process /Majlis/One Stop Centre (OSC)/ JPS approval / Format/
Contribution fee
PASSENGER
NO. BERTH
OVERALL GROSS DESIGN
CAPACITY
BEAM
APPROACH LENGTH REGISTERED DRAFT
BERTH BERTH NO. B
VESSEL L.O.A TONNAGE D
(m)
(m) (GRT) Tonnes (m)
1 GEMINI
CLASS 163.8 22.5 19, 093 5.4 788
NORTH BERTH
INNER
2
BERTH
MAX. DES.
1 ROYAL 140 21.0 12, 000 6.4 -
SOUTH BERTH NAVY
2, 260
41 guests plus
QUEEN MARY 2 345 (45m including 151, 400 10
bridge wings) 1, 253
crews
PERSHING 50 16 4 - 1.2 -
ROYAL DENSHIP
24.99 6.45 - 1.5 -
82
RAMP REFERENCES 98
o Topographical/ Bathymetric survey/ List of Surveyor/Scope of Works/Limit of
boundary survey i.e. Hydraulic Study/ Term Of Referance (TOR)/Bill Of
Quantities/Quotation/ Evaluation/ Recommendation/ Cost Estimate and
Duration - Client Approval / Admiralty Chart/Topographic Map/Satelite
Photograph/ Tide Table – ACD/LSD
o Surveyor Company name/Contact person/Address/ Telefon no./Fax
No./Mobile/E-mail
o List of SI Contractor/Government Project/ Private project/ Scope of
Works/Borehole/ Term Of Referance (TOR)/Bill Of Quantities/Quotation/
Evaluation/ Recommendation/ Cost Estimate and Duration - Client Approval
o SI Contractor Company name/Contact person/Address/ Telefon no./Fax
No./Mobile/E-mail
o EIA report/ Environmental Management Plan /Hydraulic study presented and
approved by JPS/ Planner submission – Jabatan Mineral dan Geology and
Jabatan Perancang Bandar dan Desa (JPBD)
o Conceptual plan/Preliminary design / Assumption/ Target boat/ship data/
Berthing type – parallel, pependicular/ Approach bridge, Jetty head, covered
both approach and jetty head/ Reinforced Concrete structure/Steel structure/
Conventional design/ IBS design/ IBS calculation / Selection of foundation –
piled foundation, pre boring, bored pile, micro pile/ Spun piles/ Steel pipe piles
RAMP 100
o Admiralty Chart/ Topographic Map/ Satelite Photograph/ Tide Table (Tidal) –
ACD/LSD /Taman laut clearance/ permission
o Conceptual drawing from `Lembaga Dius, Jabatan Laut/ On land/ On top of
boulder/ bed level
o Preliminary design / Assumption/ Target boat/ship data/ Reinforced Concrete
structure/ Steel structure/ Conventional design/ Precast / Selection of
foundation – piled foundation, pre boring, bored pile, micro pile/ Spun piles/
Steel pipe piles
o Dimensions are determined based - On considering tide range
Beacon range and location – determined & confirmed by Lembaga Dius, JL
o Lighbeacon structure /Foundation/Tie beam/ Lower column/ Intermediate
platform/ Main column with marine grade colour paint/ Top platform/ railing
o Accessories – Stainless steel cat ladder at landing point and attached at main
column/ Stainless steel lantern base/ Stainless steel lightning arrestor base
and lightning arrestor – copper strip down conductor in uPVC class D FRP
pigmented coloured daymark /Danger mark/ Survey point detail/ Brass plaque/
o Loading specification – dead load, live load, wind load, seismic load, berthing
load , tractive force/ concrete grade/ cover
o Specification /Preamble/Bill Of Quantities/ Tender document
o Prepared/ Checked/ Approved Process – Discussion and Presentation – Client
Approval
o Submission Process / Client signature/ Format
* THIS SLIDE CAN BE REMOVED *
LIGHT BEACON REFERENCE 101
THANK YOU
PREPARED BY:
ARSEA CONSULTING ENGINEERS SDN. BHD.