The commissioning of the RNC is performed after the hardware and software are installed. The commissioning ensures that the RNC works properly as designed.

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 2

Upon completion of this course, you will be able to:


Describe the procedure of BSC6810 system commissioning Discuss loading commissioning, local office commissioning, interface and service commissioning

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 3

References
RNC System Description
RNC Architecture and Principle RNC Commissioning Guide

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 4

Chapter 1 System Commissioning Overview


Chapter 2 System Commissioning Chapter 3 Checking RNC Commissioning

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 5

System Commissioning Overview


RNC Commissioning Preparations

This task describes how to obtain the installation software License MML command scripts

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 6

System Commissioning Overview


Main contents of system commissioning
1. Commissioning RNC Equipment 2. Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 3. Handling Alarms During RNC Commissioning 4. Verifying RNC Services 5. Integrating the RNC into the M2000 6. Creating RNC Scheduled Tasks 7. Checking RNC Commissioning Results

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 7

Chapter 1 System Commissioning Overview


Chapter 2 System Commissioning Chapter 3 Checking RNC Commissioning

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 8

Main contents of system commissioning


Chapter 2 System Commissioning
2.1 Commissioning RNC Equipment 2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 2.3 Handling Alarms During RNC Commissioning 2.4 Verifying RNC Services 2.5 Integrating the RNC into the M2000 2.6 Creating RNC Scheduled Tasks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 9

Commissioning BAMs
Obtain the Installation Information of the BAM Software

Administrator password of Windows Server 2003 . Password for the user sa to log in to SQL Server 2000 . Fixed IP addresses of the internal and external networks .
Remotely Logging In to the BAM

Choose Start > Run . The Run dialog box is displayed.


Enter mstsc /console and click OK. The Remote Desktop Connection dialog box is displayed. When entering the mstsc /console, leave a space between mstsc and /console! Enter the external virtual IP address of the BAM for remote login, and then click Connect. Enter the name and password of an administrator-level user of the BAM, and then click OK. You are remotely logged in to the BAM.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 10

Commissioning BAMs
Checklist for BAM Software Settings Performed Before Delivery
Installing Windows Server 2003
Starting the Routing and Remote Access service Starting the Terminal Services service The default password of the administrator of the active and standby BAMs is 11111111. The Routing and Remote Access service is started and Startup Type is set to Automatic. The Terminal Services service is started and Startup Type is set to Automatic. The preset IP addresses of the internal Ethernet adapters are: Creating the internal network team Active BAM: 80.168.3.50 (255.0.0.0) Standby BAM: 80.168.3.60 (255.0.0.0) The preset IP addresses of the external Ethernet adapters are: Creating the external network team Active BAM: 172.121.139.201 (255.255.255.0) Standby BAM: 172.121.139.202 (255.255.255.0) The preset backup channel IP addresses are: Configuring backup channel IP addresses of the active and standby BAMs Active BAM: 192.168.3.50 (255.255.255.0) Standby BAM: 192.168.3.60 (255.255.255.0) The preset commissioning IP addresses are: Configuring commissioning IP addresses of the active and standby BAMs Active BAM: 192.168.6.50 (255.255.255.0) Standby BAM: 192.168.6.60 (255.255.255.0) Installing SQL Server 2000 Installing SQL Server 2000 Service Pack 4 The default password of the sa account is 11111111. The version number is 8.00.2039.

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 11

Commissioning BAMs
Checking BAM Software
Check the version of Windows Server 2003 on the BAM. Check active services on the BAM. Check the version of SQL Server on the BAM. Check the operation of the SQL Server database. Check the login mode of the SQL Server database on the BAM. Check the data sequence of the SQL Server database on the BAM. Check the name consistency between the BAM and SQL Server.

Check and ensure that no BAM has the same name as that of the current BAM in the same subnet.
Check the teaming of the Ethernet adapters on the BAM. Check the teaming modes of the Ethernet adapters on the BAM. Check the system time and time zone of the BAM and ensure that it is consistent with the local time. Check and ensure that the system patron is not installed on BAMs.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12

Commissioning BAMs
Installing the BAM Application in the Active Workspace

For details, refer to Software Installation Slide.


Checking the Operation of the BAM Application
Working Modes of BAM Single-BAM mode Description When the BAM application is installed, State of each service is Started, and Startup Type of each service is Automatic. When the BAM application is installed successfully, For the active BAM, State of each service is Started, and Startup Type of each service is Automatic. Dual-BAM mode For the standby BAM, the State parameter values of SNTP Client, FTP Server, DynMonitor, and FTP Client are Started and the Startup Type parameter values of these services are Automatic. The State parameter values of other services are Stopped and the Startup Type of them are Disabled. If the heartbeat test between the active and standby BAMs succeeds, the status bar displays DSS OK.

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 13

Commissioning the RNC LMT


Checking the RNC LMT Installing the RNC LMT Application Connecting the RNC LMT to the BAM Starting the Local Maintenance Terminal of the RNC

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 14

Loading RNC Software and Data Files


Generating RNC Data Files

The generated subrack loading file is saved in BAM Active Workspace Installation Directory\LoadData. On the MML client, run the SET OFFLINE command , Run the RST DATA command. Running commands in batches. Run the FMT DATA command to set Format type to ALL_SUBRACK(Format all subracks) for formatting all subracks. Run the SET ONLINE.
Setting RNC Loading Modes (Commissioning)

On the MML client, run the SET LODCTRL command to set Board start load control. to LFB (Load from BAM and write flash) .
Starting the RNC Message Tracing (Commissioning). Starting the Loading Progress Window.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 15

Loading RNC Software and Data Files


Loading the RSS Subrack

Switch on the power distribution boxes SW3 and SW6 to power on the RSS subrack. The boards in the RSS subrack automatically load the host software and data file from the BAM. On the MML client, run the RST SUBRACK command to set Subrack No. to 0. A dialog is displayed, asking you whether to proceed. Click Yes. The boards in the RSS subrack automatically load the host software and data file from the BAM. Observe the loading progress of the associated RSS subrack in Progress Management. After the loading of the RSS subrack, click the Device Panel tab in the navigation tree and then double-click the shelf node to be queried. The RSS subrack loading lasts 3 to 5 minutes.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 16

Loading RNC Software and Data Files


Loading the RBS Subrack

Switch on the power distribution box to power on the RBS subrack. On the MML client, run the RST SUBRACK command to set Subrack No. to Number of the RBS to be loaded. Observe the loading progress of the associated RBS subrack in the Progress Management window. After the current RBS subrack is loaded, go to Step 2 to load other RBS subracks until all the RBS subracks of the RNC are loaded. After all the RBS subracks are loaded, click the Device Panel tab in the navigation tree and then double-click the shelf node to be queried. Observe the signaling connection setup on the Iub interface and cell setup in the message tracing window.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 17

Verifying the License


Verifying the License

The license of the local office is in BAM Active Workspace Installation Directory\FTP\License and the file name is license.lic.
Run the LST CFGMODE to query the data configuration of all the subracks. If the subrack is in offline mode, run the SET ONLINE command to set the subrack to the online mode. Run the ACT LICENSE command and set File Name to the name of the specified license to activate the license. Run the DSP LICENSE command and set Query type to SCU (SPU, BAM). The system displays the current configuration of each licensed service.

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 18

Verifying Switchover Between Active and Standby Boards

The RNC supports switchover of boards such as the OMUaSCUa SPUaGCUaAOUaUOIaFG2aGOUaPEUaAEUa POUa After the switchover of boards, the existing standby board becomes the active one. The process lasts 2 to 5 seconds. The existing active board becomes the standby one and is reset. The process lasts 2 to 5 minutes

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 19

Main contents of system commissioning


Chapter 2 System Commissioning
2.1 Commissioning RNC Equipment 2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 2.3 Handling Alarms During RNC Commissioning 2.4 Verifying RNC Services 2.5 Integrating the RNC into the M2000 2.6 Creating RNC Scheduled Tasks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 20

Interface and Service Commissioning


Verifying the Iub Interface
Checking physical link. Checking control plane. Checking user plane. Checking management plane. Checking cell status.
Transport Network Layer Transport Network User Plane Transport Network Control Plane Transport Network User Plane Radio Network Layer

Control Plane Application Protocol

User Plane Data Stream(s)

ALCAP(s)

Signalling Bearer(s)

Signalling Bearer(s)

Data Bearer(s)

Physical Layer

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 21

Interface and Service Commissioning


Verifying the Iu-CS

Iu-PS,Iur Interface
Checking physical links. Checking control plane. Checking user plane.

Radio Network Layer

Control Plane Application Protocol

User Plane Data Stream(s)

Transport Network Layer

Transport Network User Plane

Transport Network Control Plane

Transport Network User Plane

ALCAP(s)

Signalling Bearer(s)

Signalling Bearer(s)

Data Bearer(s)

Physical Layer

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 22

Main contents of system commissioning


Chapter 2 System Commissioning
2.1 Commissioning RNC Equipment 2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 2.3 Handling Alarms During RNC Commissioning 2.4 Verifying RNC Services 2.5 Integrating the RNC into the M2000 2.6 Creating RNC Scheduled Tasks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 23

Handling Alarms During RNC Commissioning


On the main menu of Local Maintenance Terminal, choose

Fault Management > Browse Alarm


Check whether there are alarms in the alarm browse window Handle the alarm according to the suggestions in the Alarm

Handling part
If the alarm cannot be cleared, contact Huawei for technical

support

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 24

Main contents of system commissioning


Chapter 2 System Commissioning
2.1 Commissioning RNC Equipment 2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 2.3 Handling Alarms During RNC Commissioning 2.4 Verifying RNC Services 2.5 Integrating the RNC into the M2000 2.6 Creating RNC Scheduled Tasks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 25

Verifying RNC Services

Start the following RNC message tracing tasks: message tracing over the Uu, Iu, Iub, Iur (Optional. Mandatory in inter-RNC handover), and CDT and REDIRECT serial-port print
Verify the voice service

Verify the CS streaming service


Verify the PS service Verify mobility management Verify OM management Verify HSDPA Verify HSUPA Verify Other Services

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 26

Main contents of system commissioning


Chapter 2 System Commissioning
2.1 Commissioning RNC Equipment 2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 2.3 Handling Alarms During RNC Commissioning 2.4 Verifying RNC Services 2.5 Integrating the RNC into the M2000 2.6 Creating RNC Scheduled Tasks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 27

Integrating the RNC into the M2000


BSC6810 physical connecting

with the operation and maintenance network


Set the route from BSC6810 to

M2000
Add BSC6810 in M2000

Collecting the information of


location and IP address of BSC6810 Add a new network and BSC6810 in M2000

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 28

Main contents of system commissioning


Chapter 2 System Commissioning
2.1 Commissioning RNC Equipment 2.2 Verifying Interface : Iub,Iur,Iu-cs,Iu-ps Interface 2.3 Handling Alarms During RNC Commissioning 2.4 Verifying RNC Services 2.5 Integrating the RNC into the M2000 2.6 Creating RNC Scheduled Tasks

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 29

Creating RNC Scheduled Tasks

Automatically back up the RNC configuration data, performance

data, and alarm data


Automatically back up RNC logs

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 30

Chapter 1 System Commissioning Overview


Chapter 2 System Commissioning Chapter 3 Checking RNC Commissioning

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 31

Checking RNC Commissioning Results


Check RNC commissioning results according to Checklists

for RNC Commissioning


Please refer to the manual about the detailed forms

Action The RSS subrack is loaded. All the RBS subracks are loaded.

Execution

Data Record (End Time, Personnel, Data)/Reason for No Execution

HUAWEI TECHNOLOGIES CO., LTD.

All rights reserved

Page 32