The commissioning of the RNC is performed after the hardware and software are installed. The commissioning ensures that the RNC works properly as designed.
Page 2
Page 3
References
RNC System Description
RNC Architecture and Principle RNC Commissioning Guide
Page 4
Page 5
This task describes how to obtain the installation software License MML command scripts
Page 6
Page 7
Page 8
Page 9
Commissioning BAMs
Obtain the Installation Information of the BAM Software
Administrator password of Windows Server 2003 . Password for the user sa to log in to SQL Server 2000 . Fixed IP addresses of the internal and external networks .
Remotely Logging In to the BAM
Commissioning BAMs
Checklist for BAM Software Settings Performed Before Delivery
Installing Windows Server 2003
Starting the Routing and Remote Access service Starting the Terminal Services service The default password of the administrator of the active and standby BAMs is 11111111. The Routing and Remote Access service is started and Startup Type is set to Automatic. The Terminal Services service is started and Startup Type is set to Automatic. The preset IP addresses of the internal Ethernet adapters are: Creating the internal network team Active BAM: 80.168.3.50 (255.0.0.0) Standby BAM: 80.168.3.60 (255.0.0.0) The preset IP addresses of the external Ethernet adapters are: Creating the external network team Active BAM: 172.121.139.201 (255.255.255.0) Standby BAM: 172.121.139.202 (255.255.255.0) The preset backup channel IP addresses are: Configuring backup channel IP addresses of the active and standby BAMs Active BAM: 192.168.3.50 (255.255.255.0) Standby BAM: 192.168.3.60 (255.255.255.0) The preset commissioning IP addresses are: Configuring commissioning IP addresses of the active and standby BAMs Active BAM: 192.168.6.50 (255.255.255.0) Standby BAM: 192.168.6.60 (255.255.255.0) Installing SQL Server 2000 Installing SQL Server 2000 Service Pack 4 The default password of the sa account is 11111111. The version number is 8.00.2039.
Page 11
Commissioning BAMs
Checking BAM Software
Check the version of Windows Server 2003 on the BAM. Check active services on the BAM. Check the version of SQL Server on the BAM. Check the operation of the SQL Server database. Check the login mode of the SQL Server database on the BAM. Check the data sequence of the SQL Server database on the BAM. Check the name consistency between the BAM and SQL Server.
Check and ensure that no BAM has the same name as that of the current BAM in the same subnet.
Check the teaming of the Ethernet adapters on the BAM. Check the teaming modes of the Ethernet adapters on the BAM. Check the system time and time zone of the BAM and ensure that it is consistent with the local time. Check and ensure that the system patron is not installed on BAMs.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12
Commissioning BAMs
Installing the BAM Application in the Active Workspace
Page 13
Page 14
The generated subrack loading file is saved in BAM Active Workspace Installation Directory\LoadData. On the MML client, run the SET OFFLINE command , Run the RST DATA command. Running commands in batches. Run the FMT DATA command to set Format type to ALL_SUBRACK(Format all subracks) for formatting all subracks. Run the SET ONLINE.
Setting RNC Loading Modes (Commissioning)
On the MML client, run the SET LODCTRL command to set Board start load control. to LFB (Load from BAM and write flash) .
Starting the RNC Message Tracing (Commissioning). Starting the Loading Progress Window.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 15
Switch on the power distribution boxes SW3 and SW6 to power on the RSS subrack. The boards in the RSS subrack automatically load the host software and data file from the BAM. On the MML client, run the RST SUBRACK command to set Subrack No. to 0. A dialog is displayed, asking you whether to proceed. Click Yes. The boards in the RSS subrack automatically load the host software and data file from the BAM. Observe the loading progress of the associated RSS subrack in Progress Management. After the loading of the RSS subrack, click the Device Panel tab in the navigation tree and then double-click the shelf node to be queried. The RSS subrack loading lasts 3 to 5 minutes.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 16
Switch on the power distribution box to power on the RBS subrack. On the MML client, run the RST SUBRACK command to set Subrack No. to Number of the RBS to be loaded. Observe the loading progress of the associated RBS subrack in the Progress Management window. After the current RBS subrack is loaded, go to Step 2 to load other RBS subracks until all the RBS subracks of the RNC are loaded. After all the RBS subracks are loaded, click the Device Panel tab in the navigation tree and then double-click the shelf node to be queried. Observe the signaling connection setup on the Iub interface and cell setup in the message tracing window.
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 17
The license of the local office is in BAM Active Workspace Installation Directory\FTP\License and the file name is license.lic.
Run the LST CFGMODE to query the data configuration of all the subracks. If the subrack is in offline mode, run the SET ONLINE command to set the subrack to the online mode. Run the ACT LICENSE command and set File Name to the name of the specified license to activate the license. Run the DSP LICENSE command and set Query type to SCU (SPU, BAM). The system displays the current configuration of each licensed service.
Page 18
The RNC supports switchover of boards such as the OMUaSCUa SPUaGCUaAOUaUOIaFG2aGOUaPEUaAEUa POUa After the switchover of boards, the existing standby board becomes the active one. The process lasts 2 to 5 seconds. The existing active board becomes the standby one and is reset. The process lasts 2 to 5 minutes
Page 19
Page 20
ALCAP(s)
Signalling Bearer(s)
Signalling Bearer(s)
Data Bearer(s)
Physical Layer
Page 21
Iu-PS,Iur Interface
Checking physical links. Checking control plane. Checking user plane.
ALCAP(s)
Signalling Bearer(s)
Signalling Bearer(s)
Data Bearer(s)
Physical Layer
Page 22
Page 23
Handling part
If the alarm cannot be cleared, contact Huawei for technical
support
Page 24
Page 25
Start the following RNC message tracing tasks: message tracing over the Uu, Iu, Iub, Iur (Optional. Mandatory in inter-RNC handover), and CDT and REDIRECT serial-port print
Verify the voice service
Page 26
Page 27
M2000
Add BSC6810 in M2000
Page 28
Page 29
Page 30
Page 31
Action The RSS subrack is loaded. All the RBS subracks are loaded.
Execution
Page 32
Thank You