Activity Definition:
The process of Identifying the specific schedule activities required to create specific project deliverables The process of Identifying and documenting relationships (dependencies) among project activities The process of estimating the type and quantities of resources required to perform each schedule activity
Activity Sequencing:
The process of estimating the number of work periods that will be needed to complete individual schedule activities The process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule The process of monitoring the status of the project to update project progress and managing changes to the schedule baseline.
Schedule Development:
Schedule Control:
Activity Definition
Define activities is the process of identifying the specific actions to be performed to produce the project deliverables. The create WBS process identifies the deliverables at the lowest level in the WBS, the work package. Project work packages are decomposed into smaller components called activities that represent the work necessary to complete the work package. These activities provide basis for estimating, scheduling, executing and monitoring and controlling the project work sot that the project objectives are met.
An activity is an element of a work package that has an expected duration, cost, and resource requirement. Activities involve finer dissections (decomposition) of the WBS into actions that must be done to estimate and schedule the work package components. Activities output Actions WBS output Deliverables
Activity Definition
Inputs Tools & Techniques Outputs
Activity List Activity Attributes Milestone List Requested Changes (Corrective / Preventive) Enterprise Environmental Factors Decomposition Organizational Process Assets Project Scope Statement Work Breakdown Structure WBS Dictionary Project Management Plan Templates Rolling Wave Planning Expert Judgment Planning Component
Inputs
Inputs
Decomposition:
Decomposition, as applied to activity definition, is the subdivision of work packages into smaller, more manageable components called schedule activities. The lowest level of a WBS is the work package and the outputs are deliverables. Activity definition further decomposes the work packages so that the final inputs are schedule activities (actions), rather than deliverables
Templates:
An activity list from a previous project can be used as a template for a new project. Activity information in templates can include resource skills, level of effort, identified risks, deliverables and schedule milestone Progressive elaboration of the plan throughout the project life cycle. Work accomplished in the near term is elaborated at a greater level of detail at a low level of the WBS, work in the future is planned at a higher level of the WBS Comes from Project team, senior management, and others.
Expert Judgment:
Outputs
Outputs cont
Activity Sequencing
Activity sequencing means identifying and then documenting logical relationships among schedule activities. Accurate and complete activity sequencing is critical to developing accurate, realistic, and achievable schedules. Schedule activities can be sequenced using precedence relationships, and leads & lags, to develop the project schedule.
Activity Sequencing
Inputs
Project Scope Statement Activity List Activity Attributes Milestone List Approved Change Requests
Outputs
Project Schedule Network Diagrams Activity List (updates) Activity Attributes (updates) Requested Changes
Precedence Diagramming Method (PDM) Arrow Diagramming Method (ADM) Schedule Network Templates Dependency Determination Applying Leads and Lags
PDM is a method that creates schedule networks by placing activities in boxes (or nodes) and connecting the boxes with arrows to show dependencies. This technique also is called activities on nodes or AON, and is the network method used by most PM software programs PDM includes four types of dependencies, or precedence relationships;
* Finish-to-start (FS) * Start-to-start (SS) * Finish-to-finish (FF) * Start-to-finish (SF)
In PDM, finish-to-start is the most common precedence relationship. Start-to-finish are rarely used.
Precedence Relationships
Job B can not start until job A is finished. Job B can not start until job A is started. Job B cannot finish until job A is finished Job B cannot finish until job A is started
Dependencies
Activity A FS Activity B SS Activity C Activity D SF Activity E FF
Dependencies
FS Activity A Activity B FF Activity C SS Activity D SF Activity E
Start
Finish
No repetitive activities or conditional loops! No Dummies! Often used for Three Point Estimates (was called PERT) and Critical Path Methods (CPM) analysis
Arrow Diagramming Method (ADM) is a method that creates schedule networks by placing activities on arrows and connects them at nodes to show dependencies. This technique also is called activity-onarrows or AOA, and is less frequently used than PDM technique. ADM uses only one type of dependency Finish-to-start ADM is the only network that uses dummy relationships (PDM does not). Dummies are shown on the network as dashed lines and have no work content. Dummies are a zero duration dependency
E Finish to start only (need additional nodes for leads and lags) No repetitive activities or conditional loops May use dummies Nodes numbered, activities lettered, numbers above arrows are duration Used for TPE and CPM
An arrow is used to represent an activity The work is assumed to flow in the direction in which arrow points It begins at the left end of the arrow and finishes at the right end or head of the arrow Sequences of activities are indicated by the way the arrows are interconnected The solid arrows represent a job or an activity that consumes time (has a duration) and resources
Dummy arrows (drawn as dashed lines) show special interrelationships Dummy arrows do not represent a job or activity, they have no duration and do not consume any resources Dummy arrows are used at times when there may be confusion in identifying activities. The beginning and ending of each arrow is called a node.
Snyder Engineering Associates, a full-service engineering and construction company, has been selected to design and build a manufacturing building for a client, Christopher Development Company. This building will accommodate a fabrication area, office space, and maintenance and storage areas. In this building Christopher development plans to fabricate and assemble household ventilating fans. Christopher wants this project to start no later than October 2, 1995, and be ready for occupation by April 22, 1996, a total duration of 29 weeks. Christopher s board of directors has authorized a budget of US$ 2.4 million for this project.
From past experience Snyder Engineering realizes that the 29 weeks deadline can only be met by working an accelerated seven-day-aweek schedule. Furthermore, to use the time most effectively, Snyder needs to exercise selected project management techniques to prepare an effective plan and schedule so that this project can be completed on time and within budget. When Snyder Engineering first worked with Christopher Development in preparing
overall objectives, Snyder appointed Bob Sachs to lead this project. This was arguably a good choice. In addition to past experience, technical knowledge, and expertise in managing design/Build projects, he also has the attributes necessary for a successful project manager leadership, communication skills, planning and organization skills and interpersonal and teambuilding skills. Sachs will be responsible for selecting the team members who will assist in preparing the project plan. These individuals should also have the experience to handle their assignments.
In addition to developing the project plan and schedule, the team members will be charged with (1) generating a cost budget schedule for proper and timely disbursement of funds, and (2) allocating resources, including personnel, skilled labor, material, and equipment. They will also be responsible for setting up a communication system that will allow periodic monitoring of the project s status to ensure its successful completion.
Date
Responsibility PM (Bob Sachs) Engg. Manager, Const Manager Engg. Manager Const. Manager Engg Manager Const Manager PM (Bob Sachs)
Start Mechanical/
Electrical Installation Feb12,96 Mar25,96 Apr22,96 Start Phase II Building Construction
Design Structural Steel (DSS) Fabricate and Erect Structural Steel (FESS) Design Building (DB) Design Mechanical Equipment (DME) Construct Phase I (CP-1) Construct Phase II (CP-2) Fabricate Mechanical Equipment (FME) Install Mechanical and Electrical Equipment Design Electrical Equipment (DEE) Procure Electrical Equipment (PEE) Design Interior Items (DII) Procure Interior Items (PII) Install Interior Items (III)
(IMEE)
DSS Design and detail structural steel FESS Fabricate SS based on design; Erect steel when fabrication is complete DB Design Building concurrent with SSD DME Design appropriate mechanical equip CP-1 After building design and SS are completed, construct the building shell, roof, siding, floor CP-2 After the building shell is closed in start phase 2: installation of building mechanical, electrical, and interior items FME Upon completing design of the mechanical for the building, solicit bids, negotiate, and award contracts for best proposal to fabricate and deliver ME
IMEE start installation of mechanical and electrical equipment when phase 1 is complete and M&E equip on site DEE When design of building and mechanical equip items is complete, start DEE, power requirements, lighting etc PEE upon completing DEE, solicit bids, negotiate and award contracts to fabricate and deliver EE DII II can begin concurrently with Building Design and after DME are essentially complete PII Upon completing IID award contracts to manufacture and deliver II III When interior items are delivered, install concurrent with phase 2 building.
STRUCTURAL
Design Structural Steel Fabricate and Erect Structural Steel Design Building Construct Phase I Building Construct Phase II Building Design Mechanical Equipment Fabricate Mechanical Equipment Install Mechanical and Electrical Equipment Design Electrical Equipment Procure Electrical Equipment Design Interior Items Procure Interior Items Install Interior Items
BUILDING
Mechanical
ELECTRICAL
ARCHITECTURAL
CP-2
IMEE
Architectural
III
CP-2
DSS DME
IMEE
DII
III
Architectural
Structure
1
11
Building
Mechanical
4 5
Electrical
Architectural
10
Lead: is the amount of time by which one activity precedes the following activity. You lead in to fast track a project A lead allows acceleration of the successor activity Ex. A team of technical writers can begin writing the second draft of a large document 15 days before they finish the first draft. When scheduling, this is accomplished with a finish-start relationship and a -15 day lead time
Lag: is the amount of time by which one activity follows the preceding activity. You lag out to allow a waiting time A lag directs a delay in the successor activity
Ex. You have to wait 10 days for concrete to set. This is accomplished using a finish-start relationship and a +10 day lag time
Resource Loading
Resource Leveling
You level your resources so there is no spike Leveling is done by moving an activity in its free time
Slack , float
Slack: It is the free time at the start Float: It is the free time at the end
Critical Path
The longest Path through the network diagram It represents the shortest time in which the project can finish There is no float on the critical path Contingency Float
Outputs
Activity resource requirements Activity attributes (updates) Resource Breakdown structure Resource calendar (updates) Requested changes
Brainstorming A method of joint creative thinking that first records and considers all possible options/solutions without judgment before proceeding to critical evaluation of the options Adaptive Reasoning A creative method of thinking that adapts previous solutions to new problems Lateral Thinking A method of divergent and novel thinking to generate possibilities, generally followed by convergent thinking to return to specific solutions Mind Mapping A graphical method of rapidly identifying and relating all issues relevant to a selected topic
Analogous Time Estimating (a form of expert judgment): Estimating the time to do tasks or to do a current project by extrapolating from actual cost of a previous project. Also called top-down time estimating. Inexpensive but may also be inaccurate Parametric Time Estimating: Using a mathematical model to predict project times, e.g., activity multiplied by productivity rate. Time standards. Two types of parametric estimates: (1) Regression Analysis, (2) Learning Curve Bottom Up Estimating: Rolling up the WBS time estimates to get a project total Reserve Time (Contingency): Buffer for schedule risk Qualitative (%) or Quantitative (Monte Carlo)
One time estimate per task = most likely duration The emphasis is on controlling cost and leaving schedule flexible Used on ADM (AOA) diagrams and can have dummies Is used on PDM diagrams also, but they have no dummies Uses a weighted average to estimate activity and project durations Provides variance estimates for duration dates Emphasis is on controlling schedule and leaving cost flexible Used on ADM (AOA) diagrams, can have dummies Is used on PDM diagrams also, but they have no dummies
OD)/6} ^ 2
Schedule Development
Input Organizational Process Assets Project scope statement Activity list Activity attributes Project schedule network diagram Activity resource requirements Resource calendars Activity duration estimates PM Plan -Risk Register Tools & Techniques Schedule Network Analysis CPM Schedule Compression What-if scenarios Resource leveling Critical Chain Method PM Software Applying calendars Adjust leads and lags Schedule Model Outputs Project schedule Schedule model data Schedule baseline Resource req (update) Activity Attributes (update) Project calendar (update) Requested changes PM Plan (update) Schedule Mgt Plan (update)
Schedule Development:
Inputs
Organizational Process Assets Project scope statement Activity list Activity attributes Project schedule network diagram Activity resource requirements Resource calendars Activity duration estimates PM Plan Risk Register
Schedule Development:
Network analysis is a technique that generates the project schedule. It employs a schedule model and includes such tools as CPM, critical chain, what-if analysis, and resource leveling to calculate early and late start and finish dates
Planning relates to
Scheduling,
Scheduling phase begins after completing the project planning process and constructing the project planning diagram It is important not to overlap the planning and scheduling phases.
Schedule Development
Initial scheduling can usually be done expeditiously by placing the scheduled start and finish times of each project activity directly on the planning diagram. The initial calculating effort, earliest start time , allows early review of the project duration, (a quick check that it meets project objectives) If these are not met, changes can be made early in the planning stage, thereby avoiding wasted work and other problems later as the project evolves.
Schedule Development
Critical Items:
Critical items determine the length of a project. Total float of a project activity is the difference between how much time is available to perform that activity and how much time is required. Critical path of a project is the continuous chain of critical items from start to finish of a project. CP determines the project duration Float and CP are an important part of scheduling.
Total Float:
Scheduling Procedure
In the scheduling phase, we are primarily concerned with timing how much time each job requires to complete and when each job will be scheduled to begin and end. 1. Determine the required time (time estimate) to complete each project item 2. Calculate the available time to complete each project item 3. Compare the required time with the available time of each project item for its float 4. Identify the critical (0 float) project items 5. Determine the float times of non-critical items 6. Calculate the duration of a project. 7. Validate the time schedule by getting concurrence from all the concerned persons 8. Prepare a bar chart time schedule
Estimating Rules
Place time estimates (the activity time durations) on the bottom side of the arrow Use the same unit of time for the entire project e.g., weeks, days. Show the unit of time with each estimate or in the legend of the diagram Use whole numbers (whole nos may not be required in computerized scheduling)
The earliest start time is the earliest possible time an activity can begin without interfering with the completion of the preceding activities. Guidelines for calculating EST:
Commence calculating earliest start times with the beginning node of the project planning diagram. (the scheduled time of the beginning node is set at 0 weeks). If one arrow leads into a node, earliest start time for activities starting at that node is determined by adding the earliest start time of the preceding activity to time estimate for the same preceding activity.
If more than one arrow leads into a node, the earliest start time calculation is made through each of the activities. The largest sum total is the earliest start time for the node.
Structure
DSS 2
0
Building
DB 13 DME 6 6 4
Mechanical
10 DEE 4 8 DII
FME 9 PEE 7
Electrical
Interior
PI I 4
12 9
III 10
22 10
Adding the activities on the longest path (the critical path) produces the total of 29 weeks This is the project duration for the Christopher Design/Build Project based upon the estimates used. This value of 29 weeks, the earliest start of the end node 11, is also defined as the duration of this project This is the first chance to determine whether the plan and schedule developed so far meet the objectives for project duration established earlier in the program It suggests that a viable plan and schedule has been assembled management had chosen a start date of Oct 2, 1995 and wanted completion by Apr 23, 1996 29 weeks.
The latest finish time is the latest time an activity can be completed without delaying the end of the project. Guides for calculating LFT:
The project duration must first be determined by calculating the early start times. The project duration is the latest finish time (as well as the earliest start time) of the end node of the project. The calculation of latest finish times involved working from the end node back through each node to the first node in the project
Time Estimates and Earliest Start Time & Latest Finish Times
2,7
Structure
0,0 1
Building
Mechanical
Electrical
12,19 9 4 10 10
22,29
Interior
8 2
If the duration for the project is 29 weeks and the last activity (7,11 construct phase II building) requires 6 weeks, the latest finish time for activities coming into node 7 is 23. If more than one arrow originates at a node, the latest finish time is calculated via each arrow and the smallest result is through each node to the end of the diagram.
The Float feature is one of the most important facets in project management. Float identifies the activities that have optional starting and finishing dates. These activities have TOTAL FLOAT, which is the difference between the time available for performing a job and the time required for doing it.
Available Time = LFT EST Required Time = Time Estimate for completing the activity
For a complete schedule each project activity needs, in addition to the earliest start and latest finish dates, the latest start and earliest finish dates. All of these dates will provide all of the available scheduling options. Using the float values of each activity, the following formulas can calculate the optional starting and finishing dates: Latest Start = Earliest Start + Total Float Earliest Finish = Latest Finish - Total Float
The tabulated schedule can be converted into a calendar schedule, which will make it more presentable for reporting and more convenient in monitoring the project The tabulated scheduled dates can be translated into calendar dates using a calendar showing the months and years of the project.
While the project planning diagram is the standard for planning the project, the bar chart is more acceptable and definitely more readable for showing the project schedule: Advantages:
Projects are displayed effectively Project activities behind schedule are readily noticed on a bar chart Completion dates are specifically noted Critical jobs are displayed and highlighted Non critical jobs with their float values are easily shown
Individuals supplying time estimates may inject a bias in their estimates based on unfortunate experiences on past similar projects. If they expect uncertainties on this project, that unforeseen circumstances may adversely affect it, they do not want to make the same forecasting mistake. Their estimates may be higher than acceptable, however. To offset a potential timing distortion, the threetime estimate method tries to mitigate this bias.
Its formula requires three time estimates optimistic, normal, and pessimistic for each activity to calculate the expected time.
Optimistic Time
Optimistic Time is the shortest possible time required for completing an activity. It means that everything goes as planned: very few design changes are made, deliveries are on time, machines and equipment operate with minimal breakdowns, personnel work within the standards, absences are infrequent, weather conditions are ideal etc.
Normal Time
Normal time is the average schedule for this particular activity performed a number of times under similar conditions. Normal time is usually the value used for the project activity when using just one estimate, with little or no contingency.
Pessimistic Time
Pessimistic time is the maximum possible time required to complete an activity. An exceptional number of design changes, delivery difficulties, work delays, excessive equipment breakdowns, accidents, and miserable weather conditions are among factors that increase the time required.
Schedule Compression
Crashing
Cost and schedule tradeoffs are analyzed to determine the greatest amount of compression for the least incremental cost. Crashing can result in increased cost Activities that would normally be done in sequence would be done in parallel to compress the schedule. Fast tracking can result in rework and increased risk
Fast tracking
Resource Leveling
Overlapping activities of a project may require more resources than are actually available for some periods of time The initial project schedule may also result in patterns of resource usage that are difficult to manage We tend to allocate scare resources to CP activities first
The technique of resource leveling address these issues and could result in longer schedules because it causes the CP to change
Resource Leveling addresses a resource-limited schedule The default in PM software is to hold the schedule fixed and move the resources