Introduction Construction Management is the practice of managing construction in place of the owner while also serving as the construction consultant to its design and other aspects within the project.

EXISTING SYSTEM
This module is designed to replace manual system and make Data Storage more reliable. The present system is tedious, as company administrator has to do all clerical work manually and update them from time to time as and when wanted. Similarly all the different types of report and process detail are required to be stored systematically which is very difficult in the existing system case.

MAJOR DRAWBACKS OF THE EXISTING SYSTEM ARE:

Misplacing of Document. Report generation is very difficult and time consuming. Maximum Manual work.

Human errors in maintaining physical file. Delay the process such as cash recovery.

NEED FOR PROPOSED SYSTEM

The proposed system aims at reducing the errors involved in the existing system. The human factor in the system is reduced to a minimum errors. Since the existing method is not a systematic one, maintaining the data is very difficult. Retrieval of data about transaction and customer is time consuming. The process of documentation of the services they provide cannot be done properly. Employee details are maintained properly. Report generation is very rare in the existing system. These all above problem enforces the implementation of the proposed system.

OPERATING ENVIRONMENT

HARDWARE Intel Pentium IV Processor 1 GH or above 10GB Hard Disk Drive 512 MB RAM

SOFTWARE Visual Basic.Net(Front End) MS Access(Back end)

INPUTS AND OUTPUTS:Login File Employee Record File Customer Record File Work Detail File Bill Detail File. Enquiry Detail File Order From Customer File Quotation Detail File