Sunteți pe pagina 1din 46

EPC

POWER

SOLAR

RESOURCES

INFRASTRUCTURE

Date: September 2011


LANCO Group, AllAll Rights Reserved LANCO Group, Rights Reserved

Welcome To Italcementi Team


Mr. G.Gavarini Mr. M. Maconi Mr. A. Dentone Mr. C.Pedroni Mr. E.Gilardi Mr. M.Pulice
LANCO Group, All Rights Reserved

(Project Director) (Chief Project Engineering) (Dy GM Major Projects) (Procurement Manager) (HSE Manager) (Bravo Solutions)

Safety Evacuation Plan

LANCO Group, All Rights Reserved

Assembly Area

EPC

POWER

SOLAR

RESOURCES

INFRASTRUCTURE

Date: September 2011


LANCO Group, AllAll Rights Reserved LANCO Group, Rights Reserved

Corporate Overview
Lanco Group is One of India s leading Integrated Infrastructure players

Gross Revenue (B.E) USD 2.5 Billion (as on March 2011)

Diverse businesses in 5 Sectors

Global Presence (20 states in India & 7 other Countries)

Employees over 7000

Partners in progress: Genting, Harbin, GE, Dongfang, Doosan, Hammon , Alpine, Takraf, etc
LANCO Group, All Rights Reserved

Member of

Mission, Vision and Values


Mission: Development of Society through Leadership, Entrepreneurship, Ownership

Vision: Most Admired Integrated Infrastructure Enterprise Values:


Continuous Learning

Integrity Humility & Respect

Teamwork

Organization before Self

Accountability Positive Attitude


LANCO Group, All Rights Reserved

Achievement Drive

Our Competencies

EPC

Power

Solar

Core Competencies

Resources

Infrastructure

LANCO Group, All Rights Reserved

EPC Lines of Business

Thermal Power Projects Hydro Power Projects Solar Power Projects Water Treatment and Conveyance Roads & Highways Urban Infrastructure Industrial Projects

LANCO Group, All Rights Reserved

Growth: Financial (EPC)


14000 12000 10000 8000 6000 4000 2000 0 FY 06 Turover (In Crores) *Forecast 11 FY 07 337 FY 08 1102 FY 09 3132 FY 10 4315 FY 11 FY 12* FY 13* 4060 8484 12000

LANCO Group, All Rights Reserved

EPC Capabilities Under One Roof


Project Developer

EPC
Lanco Infratech Limited

Engineering
User requirement Project/ process design Equipment Selection

Procurement
Contract formulation Vendor Development Delivery Schedule Cost advantage

Construction
Project management Site civil construction Mechanical/ elect. erection Completion within time

Performance Acceptance Test

Testing & Commissioning

Overall Project Management


LANCO Group, All Rights Reserved

Key Process
Engineering Knowledge Management Quality Management

Erection & Commissioning

Complete EPC Setup

Procurement & Contracts

Construction Project Management

Planning

LANCO Group, All Rights Reserved

Highlights of Lanco s EPC Business




One of the Largest EPC team in Indian Power Sector Monitoring

Strong in house Project Management &

Over 10,000 MW of projects under O&M and execution, (3,292 MW under operation and 7,148 MW under execution) 160 KM of National Highway completed on EPC basis and 280 KM under construction Executing One of India s largest Water Treatment and Conveyance EPC project (River Intake, 120Km MS Pipeline and RWR ) for IOCL Paradeep Refinery Executing Metro Rail Project on EPC basis for Chennai Metro Rail Limited 25 yrs of experience in Civil Construction Projects and 7 yrs in implementing Projects via EPC route Lanco Infratech Limited is - ISO 9001, ISO 14001 and BS:OHSAS 18001 certified Handling Experience of wide range of Hydro/Thermal Equipment  5 - 125 MW hydro  100/300/600 MW sub-critical thermal  660 MW supercritical thermal  660 MW Ultra supercritical* (565/600 C) thermal  Combined cycle gas projects

 

   

LANCO Group, All Rights Reserved

EPC - Manpower Strength


More than 4,000 employees in EPC, Core team comprises:

S. No 1. 2. 3. India

Country Singapore China

No. of Employees 3950 26 25

S. No 1. 2. 3. 4.

Discipline Engineering Commissioning Procurement Inspection

No. of Employees 325 55 85 22 + Outsourced

LANCO Group, All Rights Reserved

Value Proposition of Lanco -EPC

 Largest EPC player in Indian Power sector leadership position achieved through successful execution of large projects  Turnkey project design & execution capability  In house Design & Engineering Expertise for Civil & Structures, Mechanical, Electrical and C&I works  Latest tools & Softwares  Strong Project Management & Execution team  Proven execution model emphasis on time, cost and quality

LANCO Group, All Rights Reserved

EPC Projects
Completed

LANCO Group, All Rights Reserved

Kondapalli Phase I

368 MW Gas Based Combined Cycle Power Plant, Located at Vijayawada, Andhra Pradesh Turnkey EPC contract for the complete Balance of Plant (BoP) works for 368 MW of Gas based combine cycle project including all related civil works. The first private sector Power Project to receive disbursement of finance from PFC. In Operation since October 2000

LANCO Group, All Rights Reserved

Projects
Kondapalli Phase II
366 MW Gas Based Combined Cycle Power Plant, Located at Vijayawada, Andhra Pradesh Turnkey EPC contract for the complete EPC works for 366 MW of Gas based combine cycle project including all related civil works. First plant of 366 MW rating to be completed in less than 3 years of time from Concept to Commissioning. Open Cycle - In Operation since December 2009, Combined Cycle - In Operation since June 2010

LANCO Group, All Rights Reserved

Projects
Amarkantak Unit 1 & 2
2 X 300 MW Coal Based Thermal Power Plant, Located at Korba, Chhatisgarh. Turnkey EPC contract for the Balance of Plant (BoP) works for Unit I of 300 MW, and complete EPC works for Unit II of 300MW. First private funded project approved under fast track scheme of PFC. Unit I in operation since May 2009, Unit II in operation since February 2010

LANCO Group, All Rights Reserved

Projects
Udupi Power
2 X 600 MW Coal Based Thermal Power Plant, Located at Mangalore, Karnataka. Turnkey EPC contract for the complete EPC package for 1200 MW (2x600 MW) Project. Udupi #1 (600 MW) was synchronized in 31 months from first pouring of boiler foundation.

LANCO Group, All Rights Reserved

Projects
KR Puram Mulbagal Road Project
80 KM NHAI Road Located in Karnataka

Constructed the Road on EPC basis 16 KM 6 Lanning 64 Km 4 Lanning 12 Flyovers, 1 ROB, 2 Major Brigjes, 9 Minor Bridges and 156 UP/ CD Structure

LANCO Group, All Rights Reserved

Projects
Nellemangal Devihalli Road Project
80 KM Section of NH 48 for NHAI, Located in Karnataka

Constructed the Road on EPC basis 80 Km 4 Lanning 1 ROB, 3 Major Brigjes, 2 Minor Bridges

LANCO Group, All Rights Reserved

Projects
Lanco Hills
IT SEZ and Residential Tower for Lanco Hills Technology Park, Located at Hyderabad

Constructed the IT SEZ & Residential Towers, One of the Largest integrated developments in Southern India. Achieved Slab Cycle of 7 Days 30 32 Storied Buildings

LANCO Group, All Rights Reserved

Lal Bhadur Sastry International Airport


Located in Varnasi, Uttar Pradesh

Construction Contract of the Lal Bhadur Sastry International Airport

LANCO Group, All Rights Reserved

EPC Projects
Under Execution

LANCO Group, All Rights Reserved

Amarkantak Unit 3 & 4


2 X 660 MW Supercritical Coal Based Thermal Power Plant, Located at Korba, Chhatisgarh.

Turnkey EPC contract for the complete EPC package of 1320 MW (2x660MW) for Unit III and Unit IV. The project is the first Super critical unit of LANCO In 16 months, the project completed 111720 m3 of concreting against the planned schedule of 68000 m3. Scheduled for commissioning by FY 2013-14

LANCO Group, All Rights Reserved

Projects
Anpara Power Project
2 X 600 MW Coal Based Thermal Power Plant, Located at Anpara, Uttar Pradesh

Turnkey EPC contract for the complete EPC package of 1200 MW (2x600 MW) for Unit I and Unit II. First Tariff based project won under competitive bidding. Unit - I Synchronised in March 2011, Unit - II Scheduled for commissioning by FY 2011-12

LANCO Group, All Rights Reserved

Projects
Kondapalli PH III
2 X 371 MW Gas Based Combined Cycle Power Plant, Located at Vijayawada, Andhra Pradesh

Turnkey EPC contract for the complete EPC package for 2x371 MW Gas based combine cycle project including all related civil works. 2 nos. GE Frame 9FA, Heat recovery steam generator from Thermax and Steam Turbine from Harbin Unit I & Unit II - Scheduled for commissioning by FY 2011-12

LANCO Group, All Rights Reserved

Projects
Vidharba Power
2 X 660 MW Supercritical Coal Based Thermal Power Plant, Located at Vidharba, Maharashtra.

Turnkey EPC contract for the complete EPC package of 1320 MW (2x660MW) for Unit I and Unit II. Unit - I & Unit II Scheduled for commissioning by FY 2013-14

LANCO Group, All Rights Reserved

Projects
Babandh Power
2 X 660 MW Supercritical Coal Based Thermal Power Plant, Located at Dhenkanal, Orissa.

Turnkey EPC contract for the complete EPC package of 1320 MW (2x660 MW) for Unit I and Unit II. Unit - I Scheduled for commissioning by FY 2013-14, Unit II by FY 2014-15

LANCO Group, All Rights Reserved

Teesta VI HEP
500MW Hydro Electric Power Project, Located at Singdham, Sikkim.

Turnkey EPC contract for the complete 500 MW Hydro Electric Power Project

LANCO Group, All Rights Reserved

Projects
Mahagenco Koradi - TPS Expansion (BoP), 3 x 660 MW
3 X 660 MW Supercritical Coal Based Thermal Power Plant, Located at Koradi, Maharashtra.

Turnkey EPC contract for the Balance of Plant (BoP) works for 1980 MW (3 x 660 MW) Project for Mahagenco s Koradi Project. Won under international competitive bidding among top players in the EPC business.

LANCO Group, All Rights Reserved

Projects
MoserBaer Power
2 X 600 MW Coal Based Thermal Power Plant, Located at Annupur, Madhya Pradesh.

Turnkey EPC contract for the complete EPC package for 1200 MW (2x600MW) for Unit I and Unit II. Unit I Scheduled for commissioning by FY 2013-14, Unit - II by FY 2014-15

LANCO Group, All Rights Reserved

Projects
Kanpur Alighar Road Project
280 KM Section of NH 91, Located in Uttar Pradesh

Constructing the 280 KM NHAI Road from Kanpur to Alighar

LANCO Group, All Rights Reserved

IOCL Paradeep Water Conveyance Project


From Cuttak to Paradeep, Located in Odissa

EPC Trunkey Project River Water Intake, Raw Water Reservoir 120 Km Pipe Line 100 MLD Water Treatment Plant Clear Water Reservoir

LANCO Group, All Rights Reserved

Biju Patnaik Airport


Located in Bhuwaneswar, Odissa

Construction Contract of the Biju Patnaik Airport.

LANCO Group, All Rights Reserved

Transmission & Distribution

400 KV Switch Yards and Substations for Maha Infra, AP Transco, PGCIL and LANCO
LANCO Group, All Rights Reserved

Transmission & Distribution

Transmission Lines for PGCIL, NPCIL, AP Transco, APCPDCL, PGCIL and LANCO
LANCO Group, All Rights Reserved

LANCO Group, All Rights Reserved

Summary of Executed Projects Power Projects


Sl. 1 2 3 4 5 6 7 8 9 10 11 12 13 Project Tanjore Power, Tamil Nadu Kondapalli Stage I, Vijayawada, AP Amarkantak Unit 1 & 2, Korba, Chhatisgarh Kondapalli CCPP - Stage II, Vijayawada, AP Udupi - Unit 1 & 2, Mangalore, Karnataka Anpara-C - Unit 1, Uttar Pradesh IKU-II, Himachal Pradesh Baner III, Himachal Pradesh Drinidhar, Himachal Pradesh Upper Khauli, Himachal Pradesh Chitradurga, Karnataka Tirunelveli, Tamil Nadu Lanco Solar, Gujarat Gas Gas Coal Gas Imported Coal Coal Hydro Hydro Hydro Hydro Wind energy Wind energy Solar Fuel Type CCPP CCPP Sub-critical CCPP Sub-critical Sub-critical Renewable Renewable Renewable Renewable Renewable Renewable Renewable Capacity (MW) 120 368 2 x 300 366 2 x 600 600 Commissioned Open Cycle : Feb-05 Closed Cycle : Aug-05 Sep 2000 01-May-09 17-Dec-09 03-Jun-10 19-Mar-11 22-Feb-10 30-Jun-10 07-Mar-11 NA

5 19-Jan-09 5 20-Jun-09 5 29-Mar-10 5 29-Dec-10 3 10 5

Total = 3,292 MW
LANCO Group, All Rights Reserved

Summary of Power Projects Under Execution


Project 1 2 3 4 5 6 7 8 9 10 11 12 Anpara-C - Unit 2, Uttar Pradesh Amarkantak Unit 3 & 4, Korba, Chhatisgarh Kondapalli CCPP- Stage III, Vijayawada, AP Babandh Unit 1 & 2, Dhenkanal, Orissa Vidarbha Unit 1 & 2, Maharashtra Koradi BOP, Maharashtra, (For MAHAGENCO) Annuppur, MP, (For Moserbaer) Budhil Hydro Power, Himachal Pradesh Mandakini Hydro Energy, Uttarakhand Teesta Hydro Power, Sikkim Solar Mfg. Unit, Chhatisgarh Akaz Power, Iraq (For MOE, IRAQ) Gas Open Cycle Fuel Coal Coal Gas Coal Coal Coal Coal Hydro Hydro Hydro Type Sub-critical Super critical CCPP Super critical Super critical Super critical Sub-critical Renewable Renewable Renewable Capacity (MW) 600 2 x 660 2 x 371 2 x 660 2 x 660 3 x 660 2 x 600 70 76 500 1500 MTPA 2 x 125 Commissioning schedule NA 31-Oct-12 30-Jun-11 31-Dec-11 30-Apr-13 30-Oct-13 15-Jun-11 28-Feb-13 31-Aug-11 28-Feb-12 31-Aug-13 28-Feb-14

Feb-14 (Progressively) 15 Nov-13 15 Mar-14

30- Jun-11 30-Nov-12 30-Nov-13 23-Mar-12 FY 2013-14

Total = 9,378 MW + 1500 MTPA Solar Wafer/ Polysilicon Manufacturing Plant

LANCO Group, All Rights Reserved

EPC Power Projects Under Discussion

Sl 1 2 3 4 5 6 7 8

Project Udupi - Unit 3 & 4, Mangalore, Karnataka Vainetaya, Tuticorin, Tamil Nadu Pragdisa, Krishnapatnam, AP Amarkantak Unit 5 & 6, Korba, Chhatisgarh Himavat, Bhognipur, Uttar Pradesh Anpara Unit 3 & 4, Uttar Pradesh Banas Shahdol, MP Babandh Unit 3 & 4, Dhenkanal, Orissa

Fuel Coal Coal Coal Coal Coal Coal Coal Coal

Type Super critical Super critical Super critical Super critical Super critical Super critical Super critical Super critical

Capacity (MW) 2 x 660 2 x 660 2 x 660 2 x 660 2 x 660 2 x 660 2 x 660 2 x 660

Zero Date 1-Jun-11 1-May -11 1-Oct-11 1-May-11 1-Jul-11 1-Aug-11 1-Sep-11 1-Sep-11

SYNCHRO 1-Jun-14 1-May -14 1-Oct-14 1-May-14 1-Jul-14 1-Aug-14 1-Sep-14 1-Sep-14

Total = 10,560 MW
LANCO Group, All Rights Reserved

Summary of EPC - Infra Projects

Sl Executed 1. 2.

Project

Design, Build of 80 Km section of NH 4 from KR Puram to Mulbagal in the State of Karnataka Design, Build of 80 Km section of NH 48 from Nellemangal to Devihalli in the State of Karnataka Under Execution

1. 2. 3.

Design, Build of 280 Km section of NH 91 from Kanpur to Aligarh in the state of Uttar Pradesh Design, Build of Water Treatment Plant, Raw Water Reservoir and 100 Km MS Water Pipeline from Cuttak to Paradeep in the state of Orrisa. Design & Build of OTA to Airport Section of Chennai Metro Rail Project Involving Via Duct, Cut and Cover Tunnel and Station Buildings

LANCO Group, All Rights Reserved

Lanco - Solar Business


Building 35 MW Solar Farm in Gujarat, out of which 5 MW already commissioned and another 5MW under execution  Establishing 1250 TPA ploy Silicon and 80 MW Wafer facility in India  Qualified to develop 5 MW PV Project and 100 MW Solar Thermal Project in Rajasthan Expertise in: Project Development Product Distribution Manufacturing EPC for Solar Plants Marketing & Sales 

LANCO Group, All Rights Reserved

Lanco Foundation
At Lanco, we pride ourselves on being an organization that care for the world we live in.
A member of the UN Global Compact and led by

Lanco Foundation,
we have a number of initiatives in place that help us to make a difference Focused work in the areas of:  Disability  Education  Safe Drinking water  Mobile Health Services  Support of traditional arts & crafts
LANCO Group, All Rights Reserved

Our Presence

LANCO Group, All Rights Reserved