The capital cost for a construction project includes the expenses related to the initial establishment of the facility
3/23/12
.
Architectural
and engineering design Construction, including materials, equipment and labor Field supervision of construction Construction financing
3/23/12
.
Owner's
3/23/12
The operation and maintenance cost in subsequent years over the project life cycle includes the following expenses:
Operating
staff Labor and material for maintenance and repairs Owner's other expenses
3/23/12
Materials
Angles Steel
plates Nutbolds Welding machines Crane and hydra Oxygen cylinder labours
3/23/12
Stock shade
50meter
3/23/12
MATERIAL COST
PLATE 8MM TOTAL 6500SQ MT ANGALS CHANELS AND BEAM ROOF SETTING METER
STEEL
RATE 38RS MT
IN TONS 275RS SQ
3/23/12
.
KG TOTAL IS 500 KG OXYGEN CYLINDER COST 1300
NUT
BOLDS
80RS PER
370 LPG
3/23/12
.
CLEANING LIKE GRINDING CUTTING MACHINE SIZE
SURFACE
AS PER THE
3/23/12
.
TALKING ABT THE HYDRA CRANE AND AND HYDRA MINI CRANES
3/23/12
.
45
.
TRUCKS
HIRE 90 LABOURS
3/23/12
THANK YOU
.