The capital cost for a construction project includes the expenses related to the initial establishment of the facility

3/23/12

.
Architectural

and engineering design Construction, including materials, equipment and labor Field supervision of construction Construction financing

3/23/12

.
Owner's

general office overhead Equipment and furnishings Inspection and testing

3/23/12

The operation and maintenance cost in subsequent years over the project life cycle includes the following expenses:

Operating

staff Labor and material for maintenance and repairs Owner's other expenses

3/23/12

Materials
Angles Steel

plates Nutbolds Welding machines Crane and hydra Oxygen cylinder labours

3/23/12

Stock shade
50meter

width 100 meter length 22 meters height It has 27 columns

3/23/12

MATERIAL COST
PLATE 8MM TOTAL 6500SQ MT ANGALS CHANELS AND BEAM ROOF SETTING METER
STEEL

RATE 38RS MT

IN TONS 275RS SQ

3/23/12

.
KG TOTAL IS 500 KG OXYGEN CYLINDER COST 1300
NUT

BOLDS

80RS PER

370 LPG

3/23/12

.
CLEANING LIKE GRINDING CUTTING MACHINE SIZE
SURFACE

AS PER THE

3/23/12

.
TALKING ABT THE HYDRA CRANE AND AND HYDRA MINI CRANES

3/23/12

.
45

TONS 20 TONS MONTH 14 TONS MONTH 12 TONS MONTH


FUEL

225000 PER MONTH 115000 PER 60000 45000 PER PER

EXPENCES SAPERATE AND CRANE TOOLS


3/23/12

.
TRUCKS

HIRE 90 LABOURS

40000 PER MONTH 8000 PER MONTH