CONTENTS
Intro The Organization ONGC Ltd. Group Gathering Station. Oil Exploration Process Heater Treater Central Farm Tank (CFT)GCP (gas Compreesion Plant) ETP (Effluent Treatment Plant) Desalter Projects etc.
It is a Maharatna Public Sector Unit. It was set up on 14 August 1956. It is a Fortune Global 500 company ranked 152nd. Indian government holds 74.14% equity stake in this company.
Contributes 77% of India's crude oil production and 81% of India's natural gas production. It produces about 30% of India's crude oil requirement. It produced 27 MMT Crude Oil and 26 bcm Natural Gas in 2009-10.
Second step
Cleaning oil Separation of oil, water and gas
Third step
Further cleaning Selling gas and oil and having fun
Artificial Lift
1. Sucker Rod Pumping
HEATER TREATER
Separate Water from oil. Temp. 80-85deg. C Chemical dosing Polar Chem (Demulsifier).
Electrical Section
Scrubber
Remove particulates and gases from industrial exhaust streams. Inject a dry reagent or slurry into a dirty exhaust stream to scrub out acid gases.
DESALTER PLANT
plant
Project Description
1. VARIFY HEAT EXCHANGER DESIGN AT KALOL CTF 1. To study the Heat Exchanger assembly installed at CTF. 2. To Design and check the efficiency of the installed heat exchangers 3. Suggestions maximize the efficiency of the heat exchangers