Chapter 8
Scrambled Eggs
Introduction
Resource dependency > technological/logical dependency Types of Resource Constraints: - People - Material - Equipment - physical factors
Introduction
Resource scheduling problem: - time constrained projects - resource constrained projects Resource schedule Assign time-phased costs Project budget base-line
Heuristic priority rules: 1. Minimum slack 2. Smallest duration 3. Lowest activity identification number
Splitting tasks
Scheduling technique towards better project schedule and increase resource utilisation Starting diversion (resource, equipment or people) resumption Limitation interruption/Large start up or shut down costs Lengthens the time of the original activity Conclusion costs are minimal and time is not absolutely constraint
Solutions:
First come first served system > queue system Information Systems: Outsourcing: