Turbogenerator -An Introduction

Stator Slot - THDF 500 MW

Capability of Generator Modules


125/67

800

Library of Designs
1000 MW
WATER COOLED STATOR

350 MW
HYDROGEN COOLED

660 MW

170 MW
AIR COOLED
DESIRED MW CAPACITIES

80 MW

1000 MW

THDF Generators - Design features


DIRECT WATER COOLING OF STATOR WINDING AND
DIRECT AXIAL HYDROGEN COOLING OF ROTOR WINDING OPTIMALLY DESIGNED LEAF SPRING SUPPORT FOR CORE END SHIELD MOUNTED BEARINGS VPI INSULATION SYSTEM MASSIVE SUPPORT RING FOR STATOR WINDING OVERHANG TO ABSORB SHORT CIRCUIT FORCES SIDE AND TOP RIPPLE SPRINGS IN STATOR SLOTS TO CONTAIN BAR BOUNCING FORCES 5 STAGE AXIAL COMPRESSOR AND VERTICAL HYDROGEN COOLERS ON TURBINE END COLD GAS AND PRIMARY WATER TEMPERATURE CONTROL VALVES TO MAINTAIN AVERAGE INLET COOLING MEDIUM TEMPERATURES CONSTANT DOUBLE FLOW RING TYPE SHAFT SEALS BRUSHLESS EXCITATION SYSTEM

THRI 108/39 Stator with End Shield & Terminal box

Main Parts of Turbogenerator


1. Stator - Stator Frame (Fabrication & Machining) 2. Core Assembly - Stator Core, Core Suspension Arrangement 3. End Shield

4. Stator Winding Assembly - Stator Winding , Winding Assembly,


Connecting Bus bar 5. Rotor - Rotor Shaft, Rotor Wedges, Rotor Coils, Wound Rotor,

Rotor Assembly
6. Completing Assembly - Bearing Assembly, Shaft Seal Assembly, Oil Catchers, Insert Cover etc 7. Exciter 8. Auxiliary System

Main Parts of Turbogenerator


Stator Core Cooler Insert Cover Rotor fan

End Shield

Wdg Overhang
Oil Catcher Rotor

Bearing Shaft Seal

Stator

Terminal Bushing

Main Parts of Turbogenerator


Coolers

Foundation

Terminal bushing

Stator Frame
Rigid fabricated cylindrical frame Withstands weight of core & wdg, forces & torques during operation Natural frequency away from exciting frequencies Provision for H2/CO2 filling Provision for temp measurements

Foot plates for supporting on foundation


provision for H2 coolers

Stator Frame (500 MW)

Stator Frame (Fabrication & Machining)

Hydraulic/Pneumatic testing of Stator


TURBINE SIDE END SHIELD STATOR EXCITER SIDE END SHIELD

TEST PRESSURE= 10 BAR FOR

30 MIN

Stator Frame (Air Cooled TG)

Stator Core
Made up of punched segments of thin sheets of ETS Punchings coated by insulating varnish Vent segments at designed intervals for flow of cooling gas Compressed with tension bolts, pressure plate and clamping fingers Stepped arrangement at the end for reduction in eddy current losses

Core Suspension - THRI/THW TG

Core Suspension - 500 MW

Core Suspension - Air Cooled TG


Location for Spring Core Housing

Core End Plate

Core

End Shield
Closes both ends of Stator Frame Fabricated rigid box type structure in two parts Supports and houses bearings Provision for mounting Shaft seal body, Oil catchers, etc Provision for supply of Bearing Oil, Seal oil, Thrust oil and its drain

End Shield - THRI TG

End Shield (Exciter side 500 MW)

End Shield (Turbine side 500 MW)

Bearing Assembly

Terminal Bushing Box 500 MW

New dev - Total Impregnated generator


A VOID FREE HIGH VOLTAGE INSULATION ALON G THE ENTIRE LENGTH OF THE BAR A MECHANICALY FIRM BOUND BETWEEN ALL WINDING COMPONENTS AND THE INNER FRAME AND CORE BETTER SUITABILITY AGAINST THERMAL STRESSES DURING OPERATION BETTER HEAT TRANSFER LESS INSULATION THICKNESS - SPACE OPTIMIZED MACHINE LIFE IMPROVES INCREASE IN GENERATOR EFFICIENCY INCREASE IN SHORT CIRCUIT RATIO

INCREASE IN LINE CHARGING CAPABILITY


REDUCTION IN SPARES INVENTORY - STATOR BARS AND STATOR NO MORE REQUIRED AS SPARES REDUCTION IN OVERHAULING REQUIREMENTS : STATOR WEDGE TIGHTNESS CHECKING NOT REQUIRED SLOT WEDGES ARE

LOOSENING OF CORE AND FASTNERS REDUCED


GLUE INJECTION NOT REQUIRED ROTOR WITHDRAWL DURING INITIAL INSPECTION NOT REQUIRED

WOUND STATOR CORE BEING LOADED FOR TOTAL IMPREGNATION

INSERTION OF IMPREGNATED WOUND CORE IN STATOR