SCHEDULE OF TESTING
ATT FOR PROTECTION DEVICES -TWICE IN A WEEK ATT FOR TURBINE STOP & CONTROL VALVE -ONCE IN A MONTH ATT FOR PROTECTION DEVICES IS CONDUCTED AT FULL LOAD CONDITION WHEREAS FOR TURBINE STOP & CONTROL VALVE IT IS CONDUCTED AT PART LOAD CONDITION
GOVERNING RACK
OVERSPEED TRIP
1 2 3 II RESET SOLENOID
TEST VALVE
CONTROL VALVE