Sunteți pe pagina 1din 11

PPE/ Safety Requirement For Service Partners

Environment, Safety & Health -Karnataka

5/28/2012

Excavation

Barricade/ Caution Tape must be provide around Excavated Area


5/28/2012 2

Excavation

Safety Shoe/Gum boot in case of muddy soil to be used Safety Glove to be used Shuttering Material and Excavated mud to be kept minimum 1.5mtr away from excavated area No loose clothing to be worn.
5/28/2012 3

Excavation

Aluminum/Steel ladder to be used


5/28/2012 4

Emergency Contact Nos. and First AID Kit

Emergency Contact Details List (Hospital, Police, Fire Brigade etc.) should be available with Site Supervisor. First Aid Box should be available at WIP Site.

5/28/2012

Electrical Work

No Unauthorized Person allowed to work on Electrical System

All tools to be properly Insulated

No Jewelry/Watch to be worn
5/28/2012

Gloves to be worn
6

Height Work - Permit To Work

PTW is issued to all Tower Erection and Dismantling Works and are issued by respective cluster manager. Only Workers who are trained in the working at height work can work at height. The same has been monitored by the respective safety person/Supervisor of the respective team

5/28/2012

Height Work Tower Erection/Dismantling

Ensure use of proper PPEs like Helmet, Safety Harness, Safety Gloves, Safety Shoes, Sun glasses.

Always carry tools in Waist Pouches

No Height work to be Carried out in case of Inclement weather condition as such as Rain, Lightning, Heavy Wind, Etc.

Dos Ensure the Work Permit Conditions are fulfilled at site Provide Barricade/Barricade Tape around the tower/site Use approved types of PPEs only Inspect Safety Harness, Safety Helmet, Safety Gloves and Safety Shoes before using them Check and confirm proper fit of PPEs before start working Replace the PPE if not feel comfortable Wear PPE at ground / base level before reaching height Maintain 3-Point Contact while reaching the height or climbing the ladder Always Hook the Safety harness upon reaching the required working point Use Good Quality Tools Remove all Scraps or Unused material from site on completion of work
5/28/2012

Donts Do not work on height if you are unfit or not well Do not work under the influence of alcohol, drug and heavy medication Do not wear loose clothing Do not use damaged or defective PPEs Do not remove Safety Harness, Safety Helmet, Safety Gloves and Safety Shoes anytime while working at Height Never work under or stand under suspended material Do not work on tower in Bad Weather conditions like Rain, Storm, High Heat, Very Cold Do not work alone on the tower Do not smoke, chew tobacco, use mobile while working at Height Do not use Safety harness for lifting the material Do not remove and leave the PPE at height, whenever taking a break

PPES DESCRIPTION WITH THEIR MAKE/MODEL NO


Sl.No. Nature of work Hazardous Associated Falling from Height Required PPE Safety Harness Fall Arrestor Anchor Rope Material falling from Waist Pouches height Safety Helmet Hot tower structure in Hand Gloves summer Safety shoes Hand Gloves Electrical Safety shoes Working Tools Naked live connections/wires Tester Induction tester Helmet Hand Gloves Electrical Safety shoes Hearing Protection Excavation tools Gum boot Safety Goggles Torch Face Mask First Aid kit PPE Description Full Body Harness with Double lanyard and work positioning belt, with loops for attachment of fall arrestor and scaffold hook Stainless Steel guided type rope grab with self locking & karabiner Polyamide rope with thimble, hook & loop (40 mtr) Waist pouch for carrying small tools Safety Helmet Hand Gloves with Rubber Dots Safety shoes with rubberized sole Electric Shock Proof hand Gloves for 11KV Safety shoes with electrical resistance sole With full handle insulation (plier, screw driver etc.) Line Tester Pocket mounted induction tester while working with HT installation To protect from liveelectrical lines Electric Shock Proof hand Gloves for 11KV Safety shoes with electrical resistance sole Ear Plug Insulated handle of excavation tool Gum boot for muddy sand Eye Protection Plastic body Flash light / Torch Bee Protective Face Mask 10 First Aid Box - contents kits for cuts, burns and normal wounds

Height Work

Electrical Work

DG operation & Maintenance Excavation Painting All Purpose 5/28/2012

Electrocution Noise Under ground live cable Water logged area Splashing Emergency work at night General

4 5 6

Thank You

5/28/2012

11

S-ar putea să vă placă și