Sunteți pe pagina 1din 37

MNNIT-IEEE Seminar on Electrical Power Conversion 17th Oct.2008 G.K.

GUPTA Unit Managing Director

AREVA Group
Sales 11.9 billion, + 10,4% vs. 2006
Orders backlog 38.9 billion, + 55% from year-end 2006 Recruitment + 12 000 new AREVA employees

> Hermetic-Transformer - July 2006

AREVA T&D within the group

T&D: 1/3 of AREVAs energy business


Source: 2004 AREVA annual report
3 > Hermetic-Transformer - July 2006 3

Complete portfolio of electricity transmission & distribution


Products

Generator Circuit Breakers

Power Transformers

Instrument Transformers

Gas-Insulated Substations

Circuit Breakers

Disconnectors

Primary Distribution

Secondary Distribution

Distribution Transformers

Systems

Substations

Power Electronics

Distributed Energy

Power Distribution

Automation

Automation Products

Automation Systems

Automation Support

Service

Maintenance & Repair

Erection & Commissioning

Retrofit

Spare Parts

Total Asset Care

Training & Network Consulting

> Hermetic-Transformer - July 2006

AREVA T&Ds Offering

Transform voltage

Power Transformers

Distribution Transformers

> Hermetic-Transformer - July 2006

AREVA T&Ds Offering

Switch

High-Voltage Switchgear

Medium-Voltage Switchgear

> Hermetic-Transformer - July 2006

AREVA T&Ds Offering

Measure

Current Transformers

Voltage Transformers

> Hermetic-Transformer - July 2006

AREVA T&Ds Offering

Protect

HV Protection Relays

MV Protection Relays

> Hermetic-Transformer - July 2006

AREVA T&Ds Offering

Manage the flows

Energy Management Systems

Distribution Management Systems

> Hermetic-Transformer - July 2006

AREVA T&Ds Offering

Interconnect networks

HVAC

HVDC

10

> Hermetic-Transformer - July 2006

10

Offers adapted to your activities


Examples:
Power Engineering Oil & Gas Passenger Transport Wind Farms

Nuclear Hydro Thermal

Upstream Downstream LNG plant

Interurban Urban

Offshore Onshore

11

> Hermetic-Transformer - July 2006

11

Product Line - Power Transformer

12

> Hermetic-Transformer - July 2006

Power Transformer

A1105/13

INDEX

12

Product Line - Power Transformer

Generator Transformers Interconnection Network Transformers Auto-Transformers HVDC Converter Transformers Phase Shifters Transformers for SVC Shunt Reactors Series Reactors Smoothing Reactors INDEX

13

> Hermetic-Transformer - July 2006

Power Transformer

A1105/15

13

PTI - Technology
Worldwide manufacturing facilities
Stafford United-Kingdom Mnchengladbach Germany Shanghai China

Le Petit-Quevilly France Saint-Ouen France Canoas Brazil Naini India Gebze Turkey

Jakarta Indonesia

Brisbane Australia

14

> Hermetic-Transformer - July 2006

Power Transformer

March 2002- 14

14

AREVA T&D India


Sales:Rs 2,006 Crores, + 25% vs. 2006
Orders Backlog:Rs 2,746 Crores, + 46% vs. 2006 Operating Profit:Rs 350 Crores, + 71% vs. 2006; among Competition Recruitment:+ 500 new AREVA T&D India employee

Best

15

> Hermetic-Transformer - July 2006

15

Power Transformer India


CURRENT PROFILE

Large rating Generator Transformer manufactured in India

370 MVA, 20/230 kV Generator Transformer Supplied to Hyryana Power Generation Corporation, Yamunanagar through Reliance Energy Limited
16 > Hermetic-Transformer - July 2006

Power Transformer - PTI

16

Power Transformer India


CURRENT PROFILE
Largest Rating 3 Phase Auto Transformers in Transmission Network in India.

315 MVA, 400/220/33 kV


3 Nos - UPPCL 1 No - RRVPNL

1 No - GEB
7 Nos - POWERGRID
315 MVA, 400/220/33 kV AUTO TRANSFORMER COMMISSIONED AT AGRA 400 kV SUBSTATION OF UPPCL IN AUGUST 2001

17

> Hermetic-Transformer - July 2006

Power Transformer - PTI

17

Power Transformer India


CURRENT PROFILE

Largest rating 3 phase Auto Transformer manufactured


in India

315 MVA, 400/230/33 kV Auto Transformer Supplied to Power Grid Corporation of India Ltd., Purnea Substation, Siliguri
18 > Hermetic-Transformer - July 2006

Power Transformer - PTI

18

Power Transformer India


CURRENT PROFILE

400 kV Class GTs :


1No: 120 MVA &
1No: 195 MVA to GVK Industries 3 Nos: 210 MVA to Gautami Power 10Nos: 70 MVA Single Phase to Toshiba for TEESTA
210 MVA, 15.75/ 400 kV GENERATOR TRANSFORMER SUPPLIED TO GAUTAMI POWER LIMITED,

19

> Hermetic-Transformer - July 2006

Power Transformer- - PTI

19

Power Transformer India


CURRENT PROFILE

400 kV Shunt Reactor

1 no. 50 MVAR for UPPCL

2 nos. 50 MVAR for Powergrid

5 nos 63 MVAR for Powergrid

50 MVAR, 400 kV Shunt Reactor Supplied to UPPCL, Muzaffarnagar Substation

20

> Hermetic-Transformer - July 2006

Power Transformer - PTI

20

Power Transformer India


CURRENT PROFILE
Large Ratings - Industrial Segment:
1 No - 250 MVA 220 kV Essar (Steel) 9 Nos- 160 MVA, 220 kV Essar (Steel) 2 Nos - 130 MVA 132 kV INDAL (Aluminium) 1 No - 115 MVA 132 kV IMFA (Ferro- Alloy) 2 Nos - 80 MVA 220 kV Neelanchal Ispat (Steel) 1 No. 80 MVA, 132 kV Bhilai Steel Plant (Steel) 1 No - 75 MVA 220 kV Sanghi Ind (Cement) 20 Nos - 53 MVA 33 & 220 kV- Reliance (Petrochem)
21 > Hermetic-Transformer - July 2006

115 MVA, 132/34 kV, 3 PHASE TRANSFORMER AT IMFA - ICCL, ORISSA, COMMISSIONED IN MAY, 1998

Power Transformer - PTI

21

Power Transformer India


CURRENT PROFILE

First and the only


one of its kind
Produced in the Country.

Scott Connected
Transformer Supplied to Indian Railways. Converts 3 Phase

supply to 2 Phase.

54 MVA, 220/ 2X27 kV, SCOTT CONNECTED TRANSFORMER AT ANNUPUR - RAILWAYS

22

> Hermetic-Transformer - July 2006

Power Transformer - PTI

22

Power Transformer India


CURRENT PROFILE
The Transformer has 35 x 5 (175) Tap Positions for varying Output Voltage from 2.909 kV to 12.65 kV Original Transformer was Supplied from AREVAs Stafford Unit in 1960s.

72.6 MVA, 11.5 / 12.65~2.909 kV REGULATING TRANSFORMER AT HINDALCO INDUSTRIES, RENUKOOT.

23

> Hermetic-Transformer - July 2006

Power Transformer - PTI

23

Power Transformer India


CURRENT PROFILE

One of the large rating Arc Furnace Transformers Manufactured in India

36 MVA, 33 kV, Arc Furnace Transformer Supplied to Shah Alloy, Ahmadabad


24 > Hermetic-Transformer - July 2006

Power Transformer - PTI

24

Power Transformer India


CURRENT PROFILE

Exports

Supplied in: Nov, 2003

118 MVA, 13.8 / 220 kV GENERATOR TRANSFORMER AT BENI HAROUN, ALGERIA

25

> Hermetic-Transformer - July 2006

Power Transformer - PTI

25

Power market
Estimated capacity shortfall in GW

5-10 x Scale-up REQUIRED IN RATE OF CAPACITY ADDITION

Annual Capacity Addition in GW / year

Source: Powering India Road to 2017, McKinsey 2008

If business as usual continuesIndia is likely to face a capacity shortfall of 95-140 GW by 2017


Source: Powering India Road to 2017, McKinsey 2008

26

> Hermetic-Transformer - July 2006

26

Technology Requirements:

ULTRA MEGA POWER PROJECTS- LARGE


GENERATOR TRANSFORMER -936 MVA

POWERGRID AS MAIN NODAL AGENCY FORMATION OF CENTERAL GRID INTERCONNECTION OF GRIDS

27

> Hermetic-Transformer - July 2006

27

Technology Challenges:

765kV System & Network 800kV HVDC Transmission 1200kV Development System

28

> Hermetic-Transformer - July 2006

28

765kV Projects:

Government Utilities

NTPC-Sipat-Seonie

UPPCL-Annapara-Unaao PGCIL-SS
Private Participation

Reliance Sasan UMPP Lanco Anapara

29

> Hermetic-Transformer - July 2006

29

1200kV Development Project:


Participating Organizations
1. CEA 2. POWERGRID 3. CPRI 4. Manufacturers as per Annexure-I (Scope of work includes Supply, Erection, Testing, Commissioning & Major maintenance of equipment during development period). 5. Manufacturers as per Annexure-II (Scope of work includes Supply of equipment)

30

> Hermetic-Transformer - July 2006

30

1200kV Development Project:


Participating Organizations
1. CEA 2. POWERGRID 3. CPRI 4. Manufacturers as per Annexure-I (Scope of work includes Supply, Erection, Testing, Commissioning & Major maintenance of equipment during development period). 5. Manufacturers as per Annexure-II (Scope of work includes Supply of equipment)

31

> Hermetic-Transformer - July 2006

31

Annexure-I
S. Equipment No . 1 1150/3/400/3/ 33KV 333MVA single phase Auto Transformer 7 Nos 2 1200KV Disconnectors -6Sets Indian Manufacturer

AREVA, BHEL, CGL, VIJAY ELECTRICALS, AREVA, S&S Power PONDICHERY, HIVELM, S&S Hyderabad AREVA, BHEL, CGL,

1200KV Switchgear (CTs-6Nos, CVTs-6 Nos & CBs-6 poles) 826KV Multi column Surge Arresters-6Nos

AREVA, CGL, OBLUM,LAMCO

32

> Hermetic-Transformer - July 2006

32

Single phase step-up transformers

1964

For EDF France Laboratory:

Les Renardires

3 x 5 MVA 1050/3/27.03 kV

Probably the first EHV test line in the world


33 > Hermetic-Transformer - July 2006 33

AREVA - Evolution in the range of EHVAC

Since 1964

AREVA T&D
Proven Technology - Assured Quality
34 > Hermetic-Transformer - July 2006 34

Single Phase Auto-Transformers

1980

For EDELCA
Venezuela:

San Geronimo
Substation 3 x 500 MVA 765/3/400/3/20 kV [ L x B x H (Meters): 8.8 x 6.4 x 12.8 Weight (Tonnes): 223 ]
35 > Hermetic-Transformer - July 2006 35

LTI - Vadodara HVAC Project Brief

Proposed 2009

220 kV to 1200 kV Transformers & Reactors HVDC and UHVDC Transformers


36 > Hermetic-Transformer - July 2006 36

37

> Hermetic-Transformer - July 2006

37

S-ar putea să vă placă și