- Documentvg30 (1)încărcat de
Ayan Dutta
- DocumentRoll Slip 12încărcat de
Ayan Dutta
- DocumentManish Kumarîncărcat de
Ayan Dutta
- DocumentSOUMEN DIKPATI C.V (1)încărcat de
Ayan Dutta
- DocumentIMG_0002încărcat de
Ayan Dutta
- DocumentStatement UNLOCK2 (1)încărcat de
Ayan Dutta
- Document1. GSHPL-451 Dt. 29.12.2020 to Casta Reg.submission of Test Reports of Borrow Area-20 Reg_2încărcat de
Ayan Dutta
- Document1. GSHPL-451 Dt. 29.12.2020 to Casta Reg.submission of Test Reports of Borrow Area-20 Reg_1încărcat de
Ayan Dutta
- Documentfîncărcat de
Ayan Dutta
- Documentf(1)încărcat de
Ayan Dutta
- Documentfîncărcat de
Ayan Dutta
- Documentf(1)încărcat de
Ayan Dutta
- DocumentElectric Billîncărcat de
Ayan Dutta
- DocumentStatement UNLOCK2 (3)încărcat de
Ayan Dutta
- DocumentRollSlip12încărcat de
Ayan Dutta
- DocumentPankaj Admit Cardîncărcat de
Ayan Dutta
- DocumentDPR (2)încărcat de
Ayan Dutta
- Document573 Letter 0573 Reg. Monthly Inspection of Project Road for the Month of October 2021încărcat de
Ayan Dutta
- Document1631628391_lakshmi Resume (1)încărcat de
Ayan Dutta
- DocumentAir India Web Booking eTicket (H2NYV) - Adakîncărcat de
Ayan Dutta
- DocumentPankaj Admit Cardîncărcat de
Ayan Dutta
- Document1631628391_lakshmi Resume (1) (1)încărcat de
Ayan Dutta
- DocumentELECTRIC BILLîncărcat de
Ayan Dutta
- DocumentStatement UNLOCK2 (1)încărcat de
Ayan Dutta
- DocumentRATHEEîncărcat de
Ayan Dutta
- Documentupdate Milestone - 2 - Pkg1 (for RFI)încărcat de
Ayan Dutta
- DocumentTM NUMBERSîncărcat de
Ayan Dutta
- DocumentOCTOBER WEATHER REPORTîncărcat de
Ayan Dutta
- DocumentPRATAP_SINGHîncărcat de
Ayan Dutta
- DocumentPankaj soni cv.încărcat de
Ayan Dutta
- DocumentNHAI DPRîncărcat de
Ayan Dutta
- Document0+20 MISLENIOUS RFIîncărcat de
Ayan Dutta
- Document0.000 TO 10.000încărcat de
Ayan Dutta
- Documentis.875.1.1987încărcat de
Ayan Dutta
- DocumentWMM AIV BACKîncărcat de
Ayan Dutta
- Documentfinal proof checking of listed formatîncărcat de
Ayan Dutta
- Documentfinal proof checking of format..încărcat de
Ayan Dutta
- Documentfinal proof checking of formatîncărcat de
Ayan Dutta
- DocumentJGHPL-534 dt. 17.02.2021 to TL Casta Engineer reg. Submission of Design and drawing of ROB at km. 3+995încărcat de
Ayan Dutta
- DocumentGSHPL-524 dt.17.02.2021 to AEE-UHBVN-Bhalgaon reg.Completion Certificate under Electrical Estimate no. CER-222-2019-20încărcat de
Ayan Dutta
- Document237 Letter 0237 Reg. Undertaking for Casting of Deck Slab of LVUP @ 43+755.încărcat de
Ayan Dutta
- Document235 Letter 0235 Reg. Progress of the Project Highway.încărcat de
Ayan Dutta
- Document236 Letter 0236 Reg. Non-Fulfilment of Obligationsîncărcat de
Ayan Dutta
- DocumentJGHPL-538 dt. 19.02.2021 to Casta Engineer-Submission of test reports of Wet Mix Macadam(Table no. 400-13 as per MORT & H, 5th Edition.încărcat de
Ayan Dutta
- DocumentIMG_0003încărcat de
Ayan Dutta
- DocumentIMG_0001încărcat de
Ayan Dutta
- DocumentIMG_0004încărcat de
Ayan Dutta
- DocumentBarwasini Camp Daily Concrete Production Update.. - Copy - Copyîncărcat de
Ayan Dutta
- DocumentTCS Pkg-2încărcat de
Ayan Dutta