OBIECTIV:

Autoliv_Extindere_Hala

OBIECTUL:

Cort pe structura metalica h.streasina=6m_v1

STADIUL FIZIC:

Constructii

Beneficiar:

Autoliv Romania

Proiectant:

Bens Corporation

Executant:

Bens Coprporation

Proiect:
Faza:

__________________
__________________

nr: ___

C5 - LISTA cuprinzand cantitatile de lucrari


- euro -

03.03.2014
SECTIUNEA TEHNICA

Nr.

SECTIUNEA FINANCIARA

Capitolul de lucrari

U.M. Cantitatea
1

DA23A%

Sapatura mecanizata,umplutura de
balast,copactare cu vibrocompactor

Pretul unitar
(exclusiv TVA)
-euro-

TOTALUL
(exclusiv TVA)
-euro-

5=3x4

mc

250.000

manopera
CA03H#123

greutate materiale
manopera
CS354

tone

ore
Ansamblu cort-achizitie si montaj

0.000

62.821

15,705.176

utilaj:

0.000

0.000

transport:

0.000

0.000

20.757
20.101

20,100.742

manopera:

0.656

656.141

utilaj:

0.000

0.000

transport:

0.000

0.000

material:

0.000

manopera:

0.000

utilaj:

0.000

732.500
mp

1,000.000

material:

650.000
buc

Platforma incarcare tir+drum acces(borduri si


pavaj rutier sarcina utila=40tone)

greutate materiale
manopera
TNU152

tone

UZJK65

mp

0.000

tone
ore

Usi sectionale pe fatada

1,000.000

28.928

28,927.507

material:

16.343

16,343.476

manopera:

12.584

12,584.031

utilaj:

0.000

0.000

transport:

0.000

0.000

114.017
105.272

25,265.391

manopera:

8.744

2,098.666

utilaj:

0.000

0.000

transport:

0.000

0.000

material:

0.000

manopera:

0.000

utilaj:

0.000

38.848

4,760.840
ore
mp
Tunel de legatura intre hala veche si hala
noua(cadre metalice h= 4m,acoperis
tabla.protectii laterale din tabla,pardosea
sclivisita din beton armat)

greutate materiale
manopera

240.000

material:

Cheltuieli directe:

27,364.057

215.254
32,880.000
buc

0.000

transport:

procent

20,756.883

2,687.000

transport:
ASD1235

15,705.176

0.000

material:
manopera:

ore
Fundatii si platforma betonata pentru
cort(Beton armat 20 cm grosime)

62.821

material

manopera

61,709.608

31,044.015

utilaj

transport

total

0.000

0.000

92,753.623

Pag 2
STADIUL FIZIC: Constructii

0
Recapitulatia:
Cheltuieli indirecte

5=3x4

R_Autoliv
5.000 %

Total Inclusiv Cheltuieli indirecte:

Profit

15.000 %

Total Inclusiv Profit:

3,085.480

1,552.201

0.000

0.000

4,637.681

64,795.089

32,596.216

0.000

0.000

97,391.304

9,719.263

4,889.432

0.000

0.000

14,608.696

74,514.352

37,485.648

0.000

0.000

112,000.000

TOTAL GENERAL (fara TVA):


TVA:

112,000.000

24.00 %

TOTAL GENERAL:

1 euro = 4.528 lei, curs la data de 26/01/2014

Nota:
1) Masuratorile sunt realizate cat mai aproape de realitatea din teren,
2) Pt fiecare lucrare care va fi executata sa va intocmi obligatoriu situatie de lucrari conforma cu realitatea.
3) Oferta valabila 15 zile.

Executant,

Director General,
Raport generat cu ISDP , www.devize.ro, e-mail: suport@intelsoftdeviz.ro, tel.: 0236 477.007

26,880.000
138,880.000

S-ar putea să vă placă și